1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function.

Slides:



Advertisements
Similar presentations
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners This structure has concluded its function.
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
HHA, A N e w W a y o f W o r k i n g T o g e t h e r Status of Preparation of the Conference of Ministers of Health and Finance F. Sergent (AfDB) and B.
Dr Casey Wilson, 2009 Panels and Reviews. 1 st year Panels Dr C. Wilson, 2009 Format: (check details with your Dept) Chair, supervisor(s) and at least.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
Population and Housing Census An African perspective United Nations Economic Commission for Africa and African Development Bank UN Expert Group Meeting.
1 EIC Users Meeting, Stony Brook June 27, 2014 Request for these slides: Comment on “EIC working group activities at Jefferson Lab, and how people could.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
System Analysis-Gathering Requirements.  System analysis is the process of gathering info about existing system, which may be computerized or not, while.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
ComPASS Summary, Budgets & Discussion Panagiotis Spentzouris, Fermilab ComPASS PI.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
LHCbComputing Personnel status Preparation of discussion at next CB.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
SHMS User Group Issues General Discussion at Hall C User’s Summer Workshop August 5, 2008.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Organization and Goals for the Workshop
Concluding remarks E. Migneco
Trigger, DAQ and Online Closeout
Draft SuperB Organization Chart for TDR Phase
44th Meeting of the Standing Committee Bonn, Germany, October 2015 Report on activities of the Strategic Plan Working Group Ines Verleye,
Workshop Goals for the Detector Groups
CLIC detector at SiD meeting 28/3/2010
Summary/Conclusions of the SuperB PID Sessions.
SuperB EMC Computing Foreseen activities and software/computing needs
Health Resources and Services Administration (HRSA)
Preparations for a Lehman Review
Detector Session Summary
V SuperB Workshop ENS May 9-11, 2007
Marcello A. Giorgi Università di Pisa & Pisa
Umbrella Organisation A proposal for Discussion
Presentation transcript:

1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function  Many thanks for the effort and commitment We should move forward to the next phase Goals:  Advance the R&D activity as coherently as possible  Start creating the infrastructure and doing the work needed for a Technical Design Report  Prepare the ground for the formation of a collaboration We need to keep a delicate but essential balance:  Move forward coherently  Leave room for other groups to join

2 May 10, 2007 R&D Perspectives R&D will be funded at the local or regional level until there is a SuperB collaboration. Groups approach(ed) their funding agencies to get support for what they’re interested in. Nonetheless now that we have a CDR detector, coordination of activities is important:  Identify the most important R&D issues  Avoid duplication of effort  Act together to ask for money  Provide a structure for new activities or new groups

3 May 10, 2007 R&D Coordination I think it would be useful to setup a structure of R&D conveners for the subsystems with the job of:  Keep track/coordinate activities  Help groups focus on what is needed  Provide a point of reference for groups or individuals wishing to participate  Help prepare funding proposals or reports Each subsystem should have one or two conveners  Let’s use the rest of this workshop to discuss about names  Not all the vacancies need to be filled now  Not a life sentence: which should allow dynamic adaptation as things evolve

4 May 10, 2007 Subsystems MDI (including beam pipe) SVT (including Layer0) DCH EMC (including endcaps) PID (including endcaps) IFR Electronics Trigger/DAQ Computing Software

5 May 10, 2007 R&D Review and choices At some point we will need a more formal R&D review process  Committee to review and monitor activity and provide advice to the management  IMHO this should be setup when the collaboration is formed or forming For some regions it may be advantageous to create this committee earlier We need to explore the ramifications of this proposal Eventually we will have to make choices about technology  Usual difficult balance between good that works and better that might not  We should use the time in front of us to develop the new technologies as much as possible  Act together as a group working towards an experiment Minimize pain and disappointment when choices will actually be made by the SuperB collaboration

6 May 10, 2007 Software Simulation  We need to ramp up our simulation ability More and more detailed  Connection with physics group and accelerator design Physics studies Background simulation Detector studies Infrastructure  We need to start setting up a software infrastructure (and group)  From repository to framework  We’ve been using SLAC/Babar so far. How much longer ?

7 May 10, 2007 Last but not least Infrastructure in Tor Vergata  We need to proceed with a feasability study for the Tor Vergata site  It is essential to define building volumes and functions Experimental hall(s), support buildings and caverns, shafts, assembly halls, …  We have regular meetings with the Tor Vergata engineers and architects Need input and answers from the Accelerator and Detector group