THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Constellation Orion Visible Light Constellation Orion Infrared Light.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
Current status of A. Matsuoka, Y. Miyoshi, I. Shinohara, T. Takashima, K. Asamura, and ERG project team ERG project ERG project Van Allen Probes SWG 2014/09.
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
MPSRSYS- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW SYSTEMS OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
THEMIS : RESOLVING THE PHYSICS OF ONSET AND EVOLUTION OF SUBSTORMS OBJECTIVE: Study energy releases from Earth’s magnetosphere known as substorms (magnetic.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
Magnetospheric MultiScale Mission (MMS) Overview
THEMIS FDMO CDR Peer Review − L&EO and Normal Operations 1June 1-2, 2004 L&EO and Normal Operations Manfred Bester.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS FDMO Review Propellant Budget Update − 1 October 5, 2004 PROPELLANT BUDGET UPDATE Vassilis Angelopoulos Covered in this presentation: Allocations.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
FAR ULTRAVIOLET SPECTROSCOPIC EXPLORER SPACECRAFT DEVELOPMENT.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS IDPU FSW 6/23/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Preliminary Platform Design for KuaFu-A
Technical Resource Allocations
THEMIS INSTRUMENT SUITE
University of California - Berkeley
MISSION PRE-ENVIRONMENTAL REVIEW MASS PROPERTIES & SPIN BALANCE
THEMIS INSTRUMENT TRAINING
SDO Flight Dynamics Subsystem
Launch and On-orbit Checkout
CHEOPS - CHaracterizing ExOPlanet Satellite
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering

THEMIS MRRSystems - 2 GSFC, Jan 5, 2007 Design Mission Description Instrument and Probe Configuration Launch and Mission Description Requirements Verification Summary, Waived and Pending Requirements New Mission Profile Review Resources Operating Hours Problem Failure Reports Statistics and Status Unverifiable Failures Operational WorkArounds Systems Agenda

THEMIS MRRSystems - 3 GSFC, Jan 5, 2007 Launch Vehicle:Delta II, Eastern Range Apogee: km ± 9567 km Perigee:435 km ± 10 km (500 km ± 7 km on or after 3/1/2007) Inclination:16.0 deg ± 0.5 deg Date:February 15, 2007 Space Segment Spacecraft:5 Spinning Probes with Fuel for Orbit & Attitude Adjust Instruments:3-Axis Electric Field, Magnetic Field 3-D Ion & Electron Particle Detectors Spin Rate:20 RPM Orbit Period(s):1, 2 and 4 days Orientation:Ecliptic Normal Ground Segment Observatories:20 Northern with All Sky Imagers and Magnetometers Control Facilities:Mission and Science Operations Centers Operations Phases:L&EO, Cruise, Ascent, Campaigns, De-orbit Lifetime:2.3 years Mission Summary

THEMIS MRRSystems - 4 GSFC, Jan 5, 2007 Instrument Configuration IDPU: Instrument Data Processor Unit SPB : Spin Plane Booms (4x) AXB : Axial Booms (2x) SST : Solid State Telescope (2x) ESA : Electrostatic Analyzer FGM : Fluxgate Magnetometer SCM : Search Coil Magnetometer

THEMIS MRRSystems - 5 GSFC, Jan 5, 2007 Fuel Tank ESA EFI SPB Thruster T1 EFI Axial Booms (2, Stowed) Battery BAU Repress Tank Miniature Sun Sensor Transponder Thruster T2 IDPU Fuel Tank Antenna EFI SPB Thruster A1 Thruster A2 AEB Gyros Probe Configuration

THEMIS MRRSystems - 6 GSFC, Jan 5, 2007 Standard Delta 10 ft. Fairing Static Envelope 3712 PAF Probe Carrier Assembly (PCA = 5 Probes + Probe Carrier) on L/V Probe Carrier Assembly (PCA = 5 Probes + Probe Carrier) on L/V THEMIS Launch Configuration Probe Carrier Assembly (PCA) on Delta 3 rd Stage Launch Configuration Dedicated launch accommodated within standard Delta vehicle configuration and services 10’ Composite Fairing required to accommodate five Probes on the Probe Carrier in the “Wedding Cake” configuration PC stays attached to Delta 3 rd stage after probe dispense Each probe dispense from the PCA is coordinated with but independent of the other probes No single probe anomaly precludes dispense of remaining probes Star 48 3 rd Stage

THEMIS MRRSystems - 7 GSFC, Jan 5, 2007 Mission Profile

THEMIS MRRSystems - 8 GSFC, Jan 5, 2007 Mission Requirements Documentation (MRD) THM_SYS_001K_MRD.xls Mission Requirements Verification 476 Requirements total 467 Requirements verified 5 Requirements pending 4 Requirements waived Requirements Status

THEMIS MRRSystems - 9 GSFC, Jan 5, 2007 Implementation Change IN.ESA-08: ESA Dayside Energy Flux Attenuator Waived: Electronic Counting Was Fast Enough IN.DPU-09: Stored Housekeeping Telemetry Storage Waived: BAU saves all IDPU Engineering Data As Measured IN.EFI-11: EFI Noise Level < 1 x 10^-4 mV/m/sqrt(Hz). Waived: EFI measured noise level is 2 to 3 x 10^-4 mVm/sqrt(Hz). PC.Mech-1: Probe-to-Probe Static Clearance of 4 inches Waived: Current static clearance is 3.75 inches. Requirements Waived

THEMIS MRRSystems - 10 GSFC, Jan 5, 2007 Launch Site Verification M-33 Electrostatic Cleanliness requirement verification pending ESC survey after all flight close-outs (Jan 9) M-45, M-47, PC-8 PCA Mass Properties (Mass, CG, and Principle Misalignment) requirement verification pending PCA Spin Balance Test and final weighing of PCA with fueled Probes. (Jan 12 and 13) Post-Launch Verification IN.ESA-13 ESA On-Orbit Calibration requires raw data to be collected prior to final coefficients to be delivered to the Science Operations Center. (March 2007) Requirements Pending

THEMIS MRRSystems - 11 GSFC, Jan 5, 2007 Mission Profile Review for Feb 15, 2007 Launch EFI Boom Deploy delayed ~ 9 months on Probes 1 & 5 –THEMIS Deployment Motors Life Test (21 50 C) –CLUSTER lifetime tests also relevant and showed no issues RCS Re-pressurization delayed about 6 months –No Issues with RCS Components –Cassini waited several years to do the recharge. Ascent Maneuvers Delayed appx 6 months –Increased IRU radiation qualification to 63 Krad (RDM of 2) Power considerations –Improved launch orientation, side solar arrays in sun. –No change in number or duration of eclipses Thermal environment –No change New Mission Profile

THEMIS MRRSystems - 12 GSFC, Jan 5, 2007 Mass Status < 2% mass deviation between Probes (requirement) Dry Mass Margin: 4.5% (Worst case) Power Status Probe CBE: 38.7 W Probe Capability: W Probe Margin: 8.8% (First 3-hour Eclipse Season) 4.9% (Second 3- hour Eclipse Season) Resources

THEMIS MRRSystems - 13 GSFC, Jan 5, 2007 Integrated Probe Hours: Components : Averaged 780 hours run time prior to integration. Failure Free Hours: Hours accumulated on core system after return of transponder and BAU during mission integration. Late Instrument Swaps (>100 hours gained on integrated system after all swaps): Spare SST on F1 swapped in prior to TVac in August Spare SCM on F1 swapped in early October EFI re-work on F1-F5 completed in November Thermal Vacuum Hours: failure free hours were accumulated on all components during Probe Level TVac. Components accumulated and average of 250 hours during Component Level TVac. Operating Hours

THEMIS MRRSystems - 14 GSFC, Jan 5, 2007 PFR Statistics (All Spacecraft) Total : 237 Closed : 237 Open: 0 Unverifiable Failures : 13 Operational Work-Arounds : 10 Problem/Failure Reports

THEMIS MRRSystems - 15 GSFC, Jan 5, 2007 Unverifiable Failures

THEMIS MRRSystems - 16 GSFC, Jan 5, 2007 Operational WorkArounds