DON LYNCH OCTOBER 28, 2014. October 28, 2014 sPHENIX Detector Integration & Assembly Concept.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
Preparations for Run 6 Don Lynch February 13, 2006.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
DON LYNCH DECEMBER 4, AGENDA December 4, BABAR Magnet Update Outer HCal Structural Analysis (Assembly and Support) sPHENIX Project Management.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
December 18, Topics & Presenters: Magnet Overview J. Haggerty Magnet Testing in bldg 912 M. Anerella Modification to ChimneyP. Kovach Cryogenics.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
LHC Experimental Vacuum Systems Status October ‘07
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

DON LYNCH OCTOBER 28, 2014

October 28, 2014 sPHENIX Detector Integration & Assembly Concept

October 28, 2014 sPHENIX Assembly Shown in Shield Wall Opening

October 28, BABAR magnet transported to PHENIX possession in bldg 912 test area. BABAR Magnet becomes sPHENIX magnet 2.sPHENIX magnet tested at Complete Stack modifications design and fabricate 4.HCal outer, HCal Inner, EMCal, Tracking detector, global support structure, global infrastructure and assembly/installation fixtures design and procurement 5.HCal outer, HCal Inner, EMCal and Tracking detector assembled into modules and tested at assembly areas (TBD) sPHENIX Assembly Plan Chronology 4

October 28, 2014 (End of run 16) 6.PHENIX Decommissioning sPHENIX Assembly Plan (cont’d) 5

October 28, Global support structure and global infrastructure components assembled and installed at 1008 AH and IR as appropriate. Old beampipe sections installed in IR with temporary supports and baked out for run) (BES II, run 1. After run shield wall disassembled but base remains in AH) sPHENIX Assembly Plan (cont’d) 6

October 28, 2014 sPHENIX Assembly Plan (cont’d) 8.Central Pedestal (CP) base and HCal support assembled at 1008 AH.

October 28, 2014 sPHENIX Assembly Plan (cont’d) 9.1/2 of HCal outer transported to 1008 AH Lower ½ HCal cables routed to north and south ends of detector and tied off.

October 28, 2014 sPHENIX Assembly Plan (cont’d) HCal Assembly Concept: 64 modules connected at ends, 4 sets of intermediate spacers 5200 mm

October 28, 2014 sPHENIX Assembly Plan (cont’d) 10. sPHENIX Magnet Transported to 1008 and mounted on CP

October 28, 2014 sPHENIX Assembly Plan (cont’d) Inner HCal Design with EMCal Interface 4275 mm

October 28, 2014 sPHENIX Assembly Plan (cont’d) Inner HCal Support Structure Concept

October 28, 2014 sPHENIX Detectors Internal support 10/9/ Outer Hcal Magnet Inner-Outer Hcal Mounting Inner Hcal Inner Hcal to EMCal Mounting EM Cal Flux Return End Cap sPHENIX Assembly Plan (cont’d)

October 28, 2014 sPHENIX Assembly Plan (cont’d) 5200 mm

October 28, 2014 sPHENIX Assembly Plan (cont’d)

October 28, 2014 sPHENIX Assembly Plan (cont’d)

October 28, 2014 sPHENIX Assembly Plan (cont’d)

October 28, 2014 sPHENIX Assembly Plan (cont’d)

October 28, 2014 sPHENIX Assembly Plan (cont’d) 12.All Inner HCal modules transported to 1008 AH 13.Inner support structure assembled with installation fixture, all Inner HCal mounted on Inner support structure then this assembly inserted into Magnet and Inner support structure mounting hardware (connecting Inner support structure to lower Outer HCal and/or CP) 14.Inner HCal cables routed out of magnet & tied off 15.Remainder of Outer HCal installed and connected to inner support and lower HCal support/CP, cables routed from Outer HCal and tied off 16.Install new/modified Beam pipe sections in IR on temporary supports and bakeout.

October 28, 2014 sPHENIX Assembly Plan (cont’d) (BES II, run 2 the following steps can be performed will BES II run 2 is underway) 17.CP upper rack platform installed on CP above Outer HCal 18.Racks and Cables installed/routed for Inner and Outer HCal modules on CP 19.All EMCal modules installed inside Magnet (the following steps can be performed while BES II run 2 is underway) 20.CP upper rack platform installed on CP above Outer HCal 21.Racks and Cables installed/routed for Inner and Outer HCal modules on CP 22.All EMCal modules installed inside Magnet

October 28, 2014 sPHENIX Assembly Plan (cont’d) 23.EMCal racks, cables and infrastructure services installed on CP 24.Tracking modules installed inside Magnet 25.Tracking module racks, cables and infrastructure services installed on CP 26.End Cap flux returns installed.

October 28, 2014 sPHENIX Assembly Plan (cont’d) 27.Move shield wall base to side of AH

October 28, 2014 sPHENIX Assembly Plan (cont’d) NOTE: Full assembly fits through shield wall opening

October 28, 2014 sPHENIX Assembly Plan (cont’d) 28.Entire detector moved to IR

October 28, 2014 sPHENIX Assembly Plan (cont’d) 29.Move entire assembly north to center on IP

October 28, 2014 sPHENIX Assembly Plan (cont’d) 30.Shield wall, rebuilt, commissioning and full field magnet test (magnet test requirements currently under evaluation may test sooner)

sPHENIX in the IR October 28, 2014