Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 Laser alignment system Status report Leszek Zawiejski INP PAN, Cracow EUDET Annual Meeting 2008, October 6-8, Amsterdam, Holland W. Wierba, K. Oliwa,
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
CLIC_ILD vertex detector modules and stave Layout Mathieu Benoit 15/03/12 mini workshop on engineering aspects of the CLIC vertex detectors 1.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
The HCAL barrel absorber structure
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Silicon sensors for LumiCal Two possible options Wojciech Wierba Institute of Nuclear Physics PAN Cracow.
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
1 Laser alignment system Status report Leszek Zawiejski Eryk Kielar, Krzystof Oliwa, Wojciech Wierba, INP PAN, Cracow, Poland Wojciech Slominski, Jagiellonian.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
R.S. Orr 2009 TRIUMF Summer Institute
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Silicon Sensors for LumiCal Status Wojciech Wierba, J. Błocki, W. Daniluk, E. Kielar, J. Kotuła, A. Moszczyński, K. Oliwa, B. Pawlik, L. Zawiejski Institute.
February 12-13, 2006 FCAL Collaboration Meeting INP PAN, Kraków, Poland Readout electronics for LumiCal – first approach Wojciech Wierba Witold Daniluk.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
Albuquerque 1 Wolfgang Lohmann DESY On behalf of the FCAL collaboration Forward Region Instrumentation.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
*Institute of Space Science
Status of GASPARD mechanics
FCAL R&D towards a prototype of very compact calorimeter
Update of MVD services and requests
Hcal Geometry and Assembly
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Grid Pix Field Simulations and precision needed for a module
Layout of Detectors for CLIC
LumiCal mechanical design, integration with LDC and laser alignment
ECAL – CLIC_ILD vs. CLICdet_2015
HCAL Modules -First Ideas
Integration and IR Hall
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Presentation transcript:

Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow, Poland FCAL Meeting, TelAviv University, TelAviv,

Motivation Reduce heavy material (tungsten) in inactive zone (ring between radius from ~200 mm to ~250 mm). Reduce heavy material (tungsten) in inactive zone (ring between radius from ~200 mm to ~250 mm). Find more space for FE electronics and some ‘symmetry’ – same layout for all fan out and FE PCB. Find more space for FE electronics and some ‘symmetry’ – same layout for all fan out and FE PCB. We have found some misunderstanding among many people concerning the LumiCal mechanical structure – clarify the design. We have found some misunderstanding among many people concerning the LumiCal mechanical structure – clarify the design.

“Old” design of LumiCal No ‘symmetry’, leak of space for fan out bonding.

Design overview Each calorimeter is in a form of a barrel which is divided into two parts along the vertical plane. Each calorimeter is in a form of a barrel which is divided into two parts along the vertical plane. The proposed LumiCal detector will consists of 30 layers of tungsten of 1 radiation length thickness and 320  m silicon sensors layers. The proposed LumiCal detector will consists of 30 layers of tungsten of 1 radiation length thickness and 320  m silicon sensors layers. The sensitive region extends from 80 mm to mm in radius. The sensitive region extends from 80 mm to mm in radius. The outer radius of calorimeter is foreseen to be 280 mm to cover the space for front end electronics, readout cables, cooling and precision positioning sensors. The outer radius of calorimeter is foreseen to be 280 mm to cover the space for front end electronics, readout cables, cooling and precision positioning sensors. The mechanical inner radius is 76 mm. The mechanical inner radius is 76 mm.

“New” design of LumiCal Smaller in diameter fixing bolts, more space for FE electronics, ‘full symmetry’. Fan out layout and FE PCB can have identical shape for all sensor tiles (4 sectors).

Space for FE electronics One LumiCal will have electronic readout channels. On one half plane it should be a place for 1536 electronic channels. One LumiCal will have electronic readout channels. On one half plane it should be a place for 1536 electronic channels. The goal was to have all electronics for silicon tiles identical. The goal was to have all electronics for silicon tiles identical.

Detailed half plate design  Due to rotation of odd and even sensor planes by 3.75° to overlap the gaps in Tungsten absorber, some space for electronics (with full symmetry) is lost, but our design minimize it.  We foresee 3 fixing bolts to mount one half plane, but it is possible to have 5 fixing bolts per half plane. More fixing bolts will increase the stiffness of LumiCal mechanical construction.

Proof of the design Simple model in 1:1 scale of a part of the mechanical structure from transparent plastics has been made to proof the design.

Space for cables and cooling The electronic channels of LumiCal will be read in digital form to the DAQ placed ~10 m far from the detector outside the ILD. The cooper LVDS TP placed ~10 m far from the detector outside the ILD. The cooper LVDS TP cables will go from each half plane of LumiCal around the barrel to the back cables will go from each half plane of LumiCal around the barrel to the back side of each LumiCal where Data Concentrator will be placed. From Data side of each LumiCal where Data Concentrator will be placed. From Data Concentrator we foresee optical links to the DAQ. The fibre optics cables will Concentrator we foresee optical links to the DAQ. The fibre optics cables will go over LHCal and inside the square support tube (near QD 0 magnet) outside go over LHCal and inside the square support tube (near QD 0 magnet) outside the ILD detector. the ILD detector.

Conclusions To find a space for FE electronics with some symmetry, we have to sacrifice the simplicity of LumiCal mechanical design – we will have 4 different shape tungsten half plates instead of 1 (2?). Design of new FE placement has started. Simple model in 1:1 scale of a part of the mechanical structure from transparent plastics has been made to proof the design. Real model in 1 :1 scale of full LumiCal from steel will be made in second half of 2010.