INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Settlement system of Bilateral transactions under Open Access
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -R M Rangarajan & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
Energy Accounting and Need for Special Energy Meters under ABT Regime.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
OPEN ACCESS EXPERIENCES and WAY AHEAD N.R.C BABU CHIEF MANAGER (MO), SRLDC, POWERGRID
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
LOAD FORECASTING T SRINIVAS MANAGER SRLDC. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK DETAILS.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
PROCEDURE FOR PROCESSING POWER EXCHANGE TRANSACTIONS AT NLDC CONTROL ROOM 1.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Settlement system for Collective Transactions (Power Exchange)
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
“ Open access / Power Exchange Regulations/experiences of SR ”
REGIONAL ENERGY ACCOUNT BASED ON AVAILABILITY BASED TYARIFF
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
Presentation transcript:

INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058 BSESKERALA54 RGCCPPTAMILNADU882 USWLKARNATAKA42 GSMLKARNATAKA41 EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR

INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU1653 BESCOMKARNATAKA3 APPCCANDHRA PRADESH446 IMPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR

RLDC PROCESSING FEE In lakhs of Rs. RLDC Charges in lakhs of Rs. CTU Charges in Crores of Rs. NRLDC SRLDC ERLDC NERLDC WRLDC CHARGES COLLECTED BY RLDCs DURING THE YEAR

EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR

DETAILS OF REGION WISE STOA TRANSACTIONS IN

Growth Of Inter Regional Energy Exchanges Inter regional Power exchanges have increased manifold

UI IN SR (FOR ) TOTAL UI TURNOVER :- 2,761 MU TOTAL UI AMOUNT DISBURSED: CR AVG WEEKLY TRANSACTION:- 52 MU AVG WEEKLY UI AMOUNT DISBURSED: CR

APKARKERTNPONDY Total UI exported(-) / Imported(+) in MUs Total amount paid in Crores Rs SUMMARY OF UI (FOR )

NR-ER SR-ER WR-SR ER-NER EASTERN REGION SOUTHERN REGION WESTERN REGION NORTHERN REGION NORTH- EASTERN REGION SHORT TERM OPEN ACCESS(STOA) RATES WR-ER 843 (3.5) 647 (2.7) 594 (2.5) 357 (1.5) 1909 (8.0) 1311 (5.5) 600 (2.5) 667 (2.8) 620 (2.6) 370 (1.5) WR-NR Notes: i) The indicated STOA Rates are in Rs./MW/Day. ii) The figures shown in bracket reflect the STOA Rates in Paise/Unit. SRLDC, BANGALORE APRIL (3.9)

SHOW TABLE HIDE TABLE 30 Ps 45 Ps 80 Ps

AVAILABILITY TARIFF(ABT) (a)CAPACITY CHARGE (b)ENERGY CHARGE (c)ADJUSTMENT FOR DEVIATIONS (UI CHARGE) (a)= a function of Ex-bus MW availability of power plant for the day declared before the day starts x SEB’s % share. (b)= MWh for the day as per ex=bus drawl schedule for the SEB finalized before the day starts x Energy charge rate (c)=Σ(Actual energy interchange in a 15 min time block – scheduled energy interchange for the time block) x UI rate for the time block. TOTAL PAYMENT FOR THE DAY = (a) + (b)± ( c)

DAY AHEAD SCHEDULING Schedules are made for each 15 minute time block wise on day ahead basis i.e. 96 time blocks in a day. Participating agencies are ISGS and States. Bilaterals/STOAs are also included in the preparation of schedules. RLDC prepares and coordinates the schedules. On the day of operation the schedules can be revised with prior intimation i.e. 4 to 6 time blocks.

TIME TABLE FOR EXCHANGE OF INFORMATION IN RESPECT OF SCHEDULING By hrs.ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities By 1100 Hrs.SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. By 1500 hrs.SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. By 1700 hrs.SRLDC shall convey the ex-power plant despatch schedule to each ISGS and net drawal schedule to each State / Beneficiary. The details of unrequisitioned surpluses shall also be intimated. By2200 hrs.ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule By 2300 hrs.SRLDC shall issue the final despatch and drawal schedule.

BY 10: 00 HRS ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities Back SAMPLE DC SHEET

BY 11: 00 HRS Back SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. SAMPLE ENT. OF STATES

BY 15: 00 HRS SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. Back SAMPLE REQ. OF STATES

BY 17: 00 HRS SRLDC shall convey the ex-power plant despatch schedule to each ISGS SRLDC shall convey the net drawal schedule to each State / Beneficiary The details of unrequisitioned surpluses shall also be intimated. Back SAMPLE SCHD OF STATES SAMPLE SCHD OF ISGS

ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule Back

BY 23 00HRS SRLDC shall issue the final ex-power plant despatch schedule to each ISGS SRLDC shall issue the final net drawal schedule to each State / Beneficiary Back SAMPLE SCHD OF STATES SAMPLE SCHD OF ISGS