Project Sponsor: Ohio Department of Transportation District 12.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

TRAC Request: Maintain Tier II Status Maintain $5 million for further investigation / Use toward ODOT portion TRAC Request: Maintain Tier II Status Maintain.
Joe Rouse California Department of Transportation Division of Traffic Operations Office of System Management Operations.
Measure M Sunset Action Plan. Overview  Promises Made, Promises Kept  Funding Picture  Use of Measure M (M1) Freeway Funds  Next Steps 2.
West Contra Costa Unified School District
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
I-394 Express Lane Community Task Force March 18, 2004.
I-80 Corridor System Management Plan Alameda County Transportation Commission ACTAC Meeting September 7, 2010.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
Traffic & Congestion In Connecticut State of Connecticut Department of Transportation April 2010.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
SR A1A / SR 200 Reconstruction Project
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
NATMEC JUNE 5, 2012 DALLAS, TEXAS Improving MPO Decisions With Better Data: Examples in Dallas-Fort Worth Michael Morris, P.E. Director of Transportation.
SAFETY FUNDING APPLICATION STA STA-62 & Harrisburg/Middlebranch and Harrisburg Rd & 30 th St. Safety Improvements.
Detroit Intermodal Freight Terminal (DIFT) Project AASHTO SCOWT October 13, 2011.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
California Department of Transportation District 11 NSF Summer Team Internship 2012 Tamina Akram ♦ Leonora Pizarro ♦
11 Wednesday July 16,2008 Talking Freight Seminar Series Integrating Freight in Project Selection Ohio Case Study Examples Richard S. Martinko, P.E. Director.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Grade separation.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
CSXT Intermodal SCORT September 2010 CSXT Intermodal SCORT September 2010.
Southern Bridge Project Brown County Executive
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Brian Kary Minnesota Department of Transportation.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Phase 2: Data Collection Findings and Future Steps.
Intermodal Opportunities for Indiana 21 st Century Logistics Symposium Indianapolis, IN Jim McClellan Sr.VP-Norfolk Southern.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
2004 Transportation M etropolitan A tlanta P erformance Report – Congestion Measures Presentation to ITS Georgia August 29, 2005.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Expressway Driving Legacy High School Drivers Education.
Think Globally, Act Locally August 19, Introduction Why freight is important to central Ohio Global implications and impacts Highway system challenges.
The MnDOT Metro District Microsimulation Experience Kevin Sommers, PE Minnesota Department of Transportation
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
TRAC T IER 1/M ULTI -P HASE A PPLICATION Presented by KYOVA & the Lawrence County Community Action Organization PID:
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a.
MED SR 18 Corridor Project MED PID October 13, 2015.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-02 HAM-Elmore to Central Parkway Connector.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
FAST Phase I is a $500 million investment to:
Integrating Transit and Highway Solutions In High Volume Corridors
Interstate 15 North 8/17/2015 Update
The I-465 West Leg Reconstruction Project
Jeremy Area Transportation Plan
Case Study 4 New York State Alternate Route 7 Problem 4
Interstate 15 North 4/09/2015 Update
TVTC Impact Fee Update Nexus Study January 30, 2008
Interstate 15 North Phase 4
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
TRANSPORTATION SYSTEMS MANAGEMENT AND OPERATIONS Program Plan Development Roundtable December 13, 2016.
Interchanges Ch. 6.
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
Quaker Lane & Seminary Road/ Janney’s Lane March 14, 2013
Comprehensive Transportation Plan
Southern Bridge Project Brown County Executive
Major Initiatives in Hampton Roads
FREEWAY MANAGEMENT SYSTEMS:
Presentation transcript:

Project Sponsor: Ohio Department of Transportation District 12

I-480 I-480N I-480 I-271/I-480 Warrensville Center Lee Road “Tip of the Funnel” 151,510 VPD 74,720 VPD 46,960 VPD 2013 Average Annual Daily Traffic ,200 VPD 124,640 VPD US ,320 VPD

Bottleneck at I-480 EB at Freeway-to- Freeway Connection to I-480N More Demand for I-480N Leg of Diverge Weave Between Broadway/Lee Entrance Ramps and I-480N Split (1.4 Miles) Queues Form Miles in Advance of Split

ODOT 2013 Congestion Rankings Rank 64Rank 39

#27 #316 #215 #95 #116 #393 #450 #115#180 #460 # % Weekdays 33% AM Peak 31% PM Peak

I-480 Eastbound Crash Frequency SLM to I-480 Eastbound Crash Frequency SLM to 24.00

Add Auxiliary Lane Length = 1.4 miles Fits in existing footprint of I-480 No downstream improvements needed Physical constraints have been removed $5M tentative commitment from ODOT Safety Program

: $6.8M span reconfiguration of Warrensville Center overpass to handle lane improvements (PID 80558) Pier Removed

Norfolk Southern (NS) Maple Heights Intermodal Terminal ½ mile from I-480/Broadway interchange Only NS intermodal terminal in Northeast OH Provides connectivity to eastern seaboard & Gulf Coast Transferred over 59,000 containers in % average annual increase in container traffic over last 5 years

Connects Major Employment Centers

Take care of what we have Strategic reinvestment in existing infrastructure Make our system work better Improves major diverge Improve Safety Addresses multiple high-ranking Safety Analyst locations Enhance Capacity Moves traffic more quickly through pinch-point

Currently requesting $10.4M of Tier 1 TRAC funding for Construction Phase in (Total project cost = $17.25M) Thank you for your consideration.