CMWG Update to WMS 9-11-13 Report of CMWG Meeting of 9-4-13.

Slides:



Advertisements
Similar presentations
March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
MISUG Meeting Materials ERCOT 04/03/ Agenda 04/03/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas9:35 a.m.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
1 Business Integration Update to PRS September 20, 2012.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Congestion Management Working Group WMS update 11/7/2012.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
CRR Update to CMWG ERCOT CRR Team Congestion Management Working Group Aug 7, 2013.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
1 TAC Report to the ERCOT Board November 14, 2006.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Retail Workshop ERCOT Nodal Update October 06, 2010.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
1 Market Trials Update NATF January 5, 2010.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Market Continuity WMS June 8, PUBLIC What is Market Continuity? The processes by which ERCOT market-related systems and activities are returned.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Update NATF March 2,
Exceptional Fuel Costs in LMP
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Settlements Analysis due to SFT Deration Issue
Presentation transcript:

CMWG Update to WMS Report of CMWG Meeting of

WMS Assignment: Work Toward Fully Funded CRRs Why? – Will assist entities in getting more firm hedges Presently, derates can erode value of CRRs—thus leaving parties open for the difference between what they thought they owned and what actually occurs – Will increase value of CRRs sold by ERCOT Under Discussion – Modifications to Balancing Account Presently, we do an hourly comparison of CRR Values to be paid vs. Congestion Rent collected, Account Cleared out monthly – Overages flow to Monthly Balancing Account and are paid out monthly as part of RENA – Under collection results in short-pay to CRR holders Under discussion, move to daily pay out (to smooth over hours and make CRR owners more “whole” by day instead of hour) and to collect in the Balancing Account up to base level before overages are paid out – Improving CRR Modeling—Ideas Under Exploration Outage Scheduling —Outages are pulled as part of the CRR Auction Model Build Process approximate 45 days ahead of time--Last month data presented on outage scheduling for 2012: 68% of outages submitted with under 10 days notice--- Can this be improved? Use of Planning Model Change Requests to Account for New Equipment in Models – ERCOT looked at 2012 June & December TPIT filings for major projects to be in service in April-June 2013 vs. Actual 2013 In-service Dates. – 27 projects were analyzed, 4 were early or on time, 19 were not energized or not in real time model as of 8/12/13 – Is there a way to improve visibility into in service dates of new equipment? – SPS/RAPs—will continue to be modeled in CRR Model – Principles of Consistency—TAC eliminated the document from Discussion that work on this should continue

WMS Assignments: Ct’d Local Power Mitigation – NPRR 520 is in production. Results show a reduction in number of mitigated resources— but high proportion of constraints are still deemed noncompetitive –95%. – NPRR 520 was discussion that “r squared” might not be right, or that it is right and the ECI Threshold needs to be changed if R^2 stays the same – Discussions Will Continue Local Power Mitigation with Ancillary Services – When responsive reserves are deployed, there was a concern that during times when a generator providing RRS had a shift factor on a non competitive constraint, energy that was originally meant for RRS would be used along a mitigated offer curve to resolve the constraint – ERCOT presented information that demonstrates mitigation will occur when there is market power ---but mitigation is not EXPECTED to occur when the AS is needed to serve load because the Reference Price coming out of Step 1 of SCED is expected to be sufficiently high which would mean that the mitigated offer curve (for Step 2 SCED) will be at the Reference Price level (and not at verifiable/generic cost---which is the other choice coming out of S1 of SCED). – ERCOT Noted—mitigation of AS can occur if: The AS has to be released to SCED AS is deployed when resource needs to be mitigated to solve a noncompetitive constraint. Potential Assignments – Should ERCOT be able to direct Resources carrying AS to Move the AS in situations other than EEA? (Follow up to language in NPRR 529 that was discussed at workshop)

LT CRR Auction Sequence Schedule Credit Lock and Run Dates 10/28/13 – 11/15/13 NovemberDecemberJanuaryFebruary Credit Lock and Run Dates 11/18/13 – 12/6/13 Credit Lock and Run Dates 1/6/14 – 1/24/14 Credit Lock and Run Dates 1/27/14 – 2/14/14

CRR Other Sharyland will be reflected in 2014 forward CRR models NPRR 484 Credit Changes for CRR Collateralization-- CRR and Credit changes to implement path-specific adders Set to begin 10/23/13 --ERCOT will publish adders 2 days ahead of credit lock starting this Fall Training NPRR 551— 9/5/13 TAC passed ERCOT comments—Planning models to be posted 10/15 NPRRs 528/529— Workshop held 9/3 & 9/6 SCR 774— Workshop scheduled for 9/20 Friday, September 13, 2013 Wednesday, September 25, 2013 (CWG meeting in AM) Tuesday, October 8, 2013