Doc.: IEEE 802.19-12/0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /031r1 Submission March 2011 Tuncer Baykas, NICTSlide TG 1 March Session Opening Report Notice: This document has been prepared.
Advertisements

Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Comment-Resolution-Update Title: , July 2006, Comment Resolution.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
TG 1 March Session Closing Report
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
TGaf San Francisco Closing Report
Submission Title: St. Louis e/ Liaison Report.
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2016] Date.
doc.: IEEE <doc#>
Closing Report Date: Authors: July 2007 July 2007
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
TGaf Waikoloa Closing Report
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for May 2016] Date Submitted:
doc.: IEEE <doc#>
doc.: IEEE <doc#>
802.11af Liaison Report Date: Authors: November 2011
802.11af Liaison Report Date: Authors: March 2011
doc.: IEEE <doc#>
802.11af Liaison Report Date: Authors: January 2012
802.11af Liaison Report Date: Authors: March 2012
IEEE TGaf Beijing Closing Report
doc.: IEEE <doc#>
Doc: xyz January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Closing Report]
Closing Report Date: Authors: July 2007 July 2007
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
doc.: IEEE <doc#>
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
doc.: IEEE <doc#>
IEEE TGaf Dallas Closing Report
November, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2015]
doc.: IEEE <doc#>
TGaf San Antonio Closing Report
802.11af Liaison Report Date: Authors: May 2012 Month Year
doc.: IEEE <doc#>
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
IEEE TGaf Singapore Closing Report
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2015] Date.
TGaf Waikoloa Closing Report
doc.: IEEE <doc#>
IEEE TGaf Palm Springs Closing Report
doc.: IEEE <doc#>
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
March 2019 Liaison Report Date: Authors: March 2019
TGae Closing Report – July 2011
TG 1 November Session Opening Report
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
TGaf San Antonio Closing Report
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
802.11af Liaison Report Date: Authors: January 2013
802.11af Liaison Report Date: Authors: July 2011 Month Year
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
September 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4j Nov 2012 Motions Date Submitted: November.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
Submission Title: [TGn Liaison Report] Date Submitted: [20 June 2006]
IEEE TGaf Beijing Closing Report
Presentation transcript:

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Date: Authors:

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide 2 Abstract Liaison report from af as presented to

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Status before September Meeting LB189 started on July 20 th and ran for 30 days, ending at 23:59:59 ET on August 19 th The second letter ballot passed with 79.1% approval –998 comments (316 Editorial, 87 General and 595 Technical) Goal is to resolve all 998 comments and create a Draft 3.0 before the end of the November meeting in San Antonio.

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide 4 Current af Status Approved the TGaf minutes from the July Plenary in San Diego, and August 21 st and 28 th, and September 4 th and 11 th teleconferences in documents r0, r0, r0, r0 and 11-12/1099r0 respectively. Approved the comment resolution spreadsheet in 11-12/1017r5 as the working document. Resolved 303 editorial and 98 technical comments (by end of Thursday AM1).

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide 5 Regulatory update FCC: To vote on incentive auction on Sept 28. DL will be below channel 37 and it will be available nation wide. UL will be different in different markets and will be at higher frequency as compared to DL. There will be guard band between the TVWS channels and the spectrum auctioned (both DL and UL) for cellular purpose. Auctions will be in 5 MHz channel width. Ofcom: Final rules published in July. Multiband operation is possible af draft need to be modified accordingly. ETSI BRAN (EN v0.0.7): Most of clause 4 (technical requirement) is completed. It should be available on member portal this week. Will have teleconference between now and December and F2F in December. Plan is to complete this by December (v1.1). Singapore and Korea moving ahead with TVWS.

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide 6 Plan for November meeting Approve Indian Wells and Teleconferences minutes Complete comment resolution from Letter Ballot 189. –Requested TEN 2-hour meeting blocks Produce draft 3.0 and request RLB. Plan for January and Teleconferences. Teleconferences: Weekly on Tuesdays through November 20. Time: 21:00 ET for up to 2 hours.

doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide 7 Official TGaf Timeline Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: July 2012 Recirculation Letter Ballot: November 2012 Form Sponsor Ballot Pool: June 2013 Initial Sponsor Ballot: July 2013 Recirculate Sponsor Ballot: November 2013 Final WG/EC Approval: March 2014 RevCom/Standards Board Approval: June 2014