Www.energy.gov/EM 1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald.

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

The Department of Energy Enterprise Risk Management Model
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
1. 2  Pantex Plant Mission & Background  Federal Energy Goals  PREP Vision  Contract & Wind System Attributes  Project Management  R&D  PREP –
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
1 Terry Tyborowski Deputy Assistant Secretary, Program Planning and Budget for Environmental Management February 27, 2014 Budget Update.
U.S. Department of Energy Office of Science Advanced Scientific Computing Research Program NERSC Users Group Meeting Department of Energy Update June 12,
1 The Honorable Kenneth J. Krieg, Under Secretary of Defense for AT&L, signed the DoDI on Nov.2, 2006 Consistent with Goal 6: Improved Governance.
Federal Transit Administration New Starts Project Development Process
Recent Trends in DoD Systems and Software Engineering Processes Bruce Amato Acting Deputy Director, Software Engineering and Systems Assurance Office of.
Foreign Affairs Security Training Center
ZHRC/HTI Financial Management Training
Environmental Quality Restricted Account (EQRA) Path Forward Discussion Bill Sinclair Deputy Director Utah Department of Environmental Quality July 30,
U.S. Department of Energy Project Management: Communicating Progress – Celebrating Success Paul Bosco, PE, PMP, CFM, LEED-AP Director, Office of Procurement.
1 Project Management, Support Functions, and Integration David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management.
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Capital Planning and Investment Control (CPIC) Revisions to the Construction.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Decommissioning WGEI 2nd meeting, Oslo, September 2015.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
Planning and Community Development Department Housing Element City Council February 03, 2014.
Comparing the Attitudes and Activities of Internal Auditors in Australia, Canada, and the United States Regarding Green IT Discussant Comments Henry Grunberg.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Environmental Quality Restricted Account (EQRA) Background Bill Sinclair Acting Executive Director Utah Department of Environmental Quality May 28, 2009.
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
Federal Acquisition Service U.S. General Services Administration GSA Assisted Acquisition Services Peter Han General Services Administration March 16,
DOE ASSET MANAGEMENT PLAN
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
THE APPROPRIATIONS PROCESS RITA MARTIN CSAVR DEPUTY DIRECTOR.
U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Director, Office of Science April 29, 2004 PRESENTATION FOR THE BIOLOGICAL AND ENVIRONMENTAL.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
SPD-SWPF SALT WASTE PROCESSING FACILITY (SWPF) LESSONS LEARNED.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Materiel Development Decision (MDD) Information Requirements
1 Energy Communities Alliance Meeting WIPP Recovery and Greater-than-Class C Disposal Update February 17, 2016.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Office of Baseline Change Proposal (BCP) Approval or Brief Presented by: Draft version Jun 16, 2015.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Director Waste Facilities Manager Waste Strategy Manager Corporate Services Manager MERSEYSIDE WASTE DISPOSAL AUTHORITY CURRENT TOP LEVEL STRUCTURE Planning.
Office of Project Management Oversight and Assessments Office of Critical Decision-3 Approve Start of Construction or Brief Presented by:
(AFTER-THE-FACT ORDERS) Confirming Orders. Purchasing Policies Use of confirming Requisitions and Purchase Orders without an approved University payment.
Acquisition Support New Horizons Consulting Services, LLC’s, premier business unit is an offering of a full range of services and support for acquisition.
Camera PDR/CD1 Planning 19 September 2008
AFN National Housing and Infrastructure Forum
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Capital Asset Projects executed by the
Enterprise Content Management Owners Representative Contract Approval
National & International usace cost engineering indefinite delivery, indefinite quantity (IDIQ) contracts USACE – Walla Walla District Contracting Office.
Federal Acquisition Service
Preparations for a Lehman Review
Manajemen Konstruksi Project Life Cycle
Charles Simpson Washington River Protection Solutions May 2018
Successfully Integrating NEPA and Environmental Permitting into a DoD Hazardous Waste Treatment Facility Construction Project to Meet Budget and Schedule.
PULSE Building Renovation
Safeguards and Security (S&S) Quality Panels
Presentation transcript:

1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald E. Gill Acting Federal Project Director / Operations Activity Manager Carlsbad Field Office Office of Environmental Management February 19, 2016

2 Project Management Background DOE Order 413.3B “Program and Project Management for the Acquisition of Capital Assets” Disciplined approach for acquiring capital assets Project goes through “Critical Decisions (CD)” during the development and approval of the project Many independent reviews by other organizations to ensure acquired asset will meet the mission need Secretary of Energy Memorandum December 2014 “Improving the Department’s Management of Projects” Additional review requirements Independent Analysis of Alternatives to General Accounting Office standards Additional design maturity requirements for Hazard Category 2 Nuclear Facility at CD-2

3 Critical Decision (CD) Process Line Item Funding Base Funding Oct. 24, 2014 Dec. 23, 2015

4 Critical Decision 1 – Approve Alternative Selection and Cost Range CD-1 documentation and reviews consisted of the following: Acquisition Strategy Preliminary Project Execution Plan Tailoring Strategy Independent Analysis of Alternatives Independent Cost Review Independent Project Review Conceptual Design Report / Conceptual Safety Validation Report Conceptual Safety Design Report National Environmental Policy Act Strategy

5 Analysis of Alternatives Nuclear Waste Partnership (NWP) proposed a total of 24 alternatives with 2 requiring additional study through Conceptual Design Alternative 1-A Provide a new unfiltered exhaust shaft for mining operations and use existing exhaust shaft with additional filtration capacity for full waste handling and disposal operations Alternative 1-D Existing exhaust shaft with filtered ventilation sufficient for full mining and waste handling and disposal operations An Independent Analysis of Alternatives was contracted with Trinity Engineering Associates that developed 4 alternatives that were similar to the ones developed by NWP

6 Approval of CD-1 Approved Acquisition Strategy Approved Preliminary Project Execution Plan Approved Tailoring Strategy that combined CD-2 and CD-3 Alternative 1-A selected with two projects, cost ranges, and proposed CD schedule Safety Significant Confinement Ventilation System (15-D-411) Use existing exhaust shaft with additional filtration capacity for waste handling and disposal operations $189M to $280M Exhaust Shaft (15-D-412) New unfiltered exhaust shaft for mining operations $81M to $118M

7 Path Forward Design Request for Proposal on the two projects Design in Fiscal Year 2016, completion in Fiscal Year 2017 Long Lead Procurements in Fiscal Year 2017 Salt Removal Systems Exhaust Fans Filter Housings Diesel Standby Generators