330 mm 290 mm 210 mm 60 mm 20 mm The magnet Beam through a hole of 75 mm in the yoke Pole gap: 90 mm.

Slides:



Advertisements
Similar presentations
West Wall Compressor Requirements West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West.
Advertisements

Energy deposition in Q0 Elena Wildner 19/04/07. Strategy 1. Define a TAS to protect the Q0 2. Optics:  *= 0.25m 3. Calculate, with some optimization.
Connectors and Cables Types of connectors and cables Wiring standards Soldering principles Cable testing.
Speaker: Chung Yin, Poon
Question from the GDE : Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 meter magnetized wall? 5m magnetized wall.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
Configuration of RISING for Measurements of Spin-alignment and g-factors by TDPAD.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Status report for Helium bag and Gauss meter installation for D Hiroshi Kou.
Performances of a pixel ionization chamber to monitor a voxel scan hadron beam A.Boriano 3, F.Bourhaleb 2,3, R. Cirio 3, M. Donetti 2,3, F. Marchetto 3,
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
T. Horn, SHMS Optics Update SHMS Optics Update Tanja Horn Hall C Users Meeting 31 January 2009.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Fiber-Optic Dosimeter. Orbital Therapy’s HRD-6 High Resolution Fiber Optic Dosimeter is the first in a new class of radiation dosimeters with unprecedented.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Status of CEPC Detector magnet
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
G-factor measurement at RISING: The case of 127 Sn Liliya Atanasova University of Sofia.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
RESEARCH and DEVELOPMENT for CBM (at LHE JINR) Yu.V. Zanevsky Laboratory of High Energies JINR, Dubna - NEW INFRASTRUCTURE - FAST GAS DETECTORS - DIPOLE.
Concept of the scanning table in Strasbourg François DIDIERJEAN Tatjana FAUL, Fabrice STEHLIN Strasbourg AGATA week July 2008 Uppsala, Sweden.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
SBS Magnet John J. LeRose. Assembly drawing of 48D48 magnet as used at BNL (vertical field)
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Tracking (wire chamber) Shield radon, neutron,  Source foil (40 mg/cm 2 ) Scintillator + PMT 2 modules 2  3 m 2 → 12 m 2 Background < 1 event / month.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
COMPASS polarized target for Drell-Yan Michael Pesek Charles University in Prague On behalf of COMPASS PT group PSPT, Charlottesville, Virginia
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Bending Magnets for the Metrology Light Source
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
CLIC DETECTOR PAC RING SHIELDING CONCEPT Jerome Axensalva BE/OP16/12/2011 MDI meeting1.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
Geometry of the ACD Beam Test at CERN (2002) Tsunefumi Mizuno Overview of the Setup: p.2 ACD tile configuration: pp.3-4 Sn Calorimeter:
Interaction Region and Detector
Scintillator testing in Prague (update from Aussois)
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
AS1 Series AREAscan™.
EURONu Collaboration Board,
Status of the CLIC DR wiggler design and production at BINP
The PrimEx-I Beam line.
HRS at small angles for e+/ e- pair for APEX
Magnetic gap calculation
Use of Beam Loss Monitor type detectors in CNGS muon station
Polarized Internal Gas Target in a Strong Toroidal Magnetic Field
The PrimEx-I Experiment
P.Fabbricatore & S.Farinon
RPC HV-LV project Introduction RPC description Requirements
Hall C Users Meeting 31 January 2009
Beam Halo Considerations for Back Angle Running
Measurement and Characterization of a 5T Solenoid Field
Progress of CEPC detector magnet
Presentation transcript:

330 mm 290 mm 210 mm 60 mm 20 mm The magnet Beam through a hole of 75 mm in the yoke Pole gap: 90 mm

beam V-shaped lead wall magnet Veto detector (scintillator) Status

magnet V-shaped lead wall + collimator with hole of 75 mm10 cm Pb beam Status

Veto detector (from LAND)

Distance to magnet coil = ?, minimization possible ? Status

Validation detector (Sofia) Plexiglass/Cu (Leuven) Beam (GSI)

Status : The validation detector

Investments 2005: (1) Leuven: * 317 Euro: Cu stopper foil (99.997% purity, annealed), 5 pieces of 2 mm thickness (10x10cm2, cut to 8x8 cm2) * 301 Euro: Pb-wall with hole of 75 mm diameter (2x 5 cm thick) * 970 Euro: 1mm thickness foils of Pb, Cu, Al for shielding of detectors adapted (bare detectors, short collimator, long collimator openings). * Euro: payment to GSI for running costs for g-RISING (invoice Hans-Juergen). * 100 Euro: plexiglass degraders (5 different thicknesses) + support degrader/stopper (2) Sofia: * 900 Euro: light guides for validation detector + construction (3) ILL, Grenoble: * 3000 Euro: magnetic field resistant PM tubes (4) Rossendorf: * 2500 Euro: stands for Cluster detectors (5) Bonn * Euro: support structure for the magnet + detectors and other equipment for our g-RISING campaign (payment to GSI as running costs)

Magnet Power supply Digital Hall probe Meter DTM PC With labview program for remote control Of both systems S4 areaControl room Write field value+sign via network to data acquisition buffers RS232 C Connector 26 pins RS232 C Connector 26 pins 2 RS232 9 pins Network card in PC Option 1: 2 RS232 cables between S4 and Control room

245 mm diameter mm 102 mm