Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.

Slides:



Advertisements
Similar presentations
Engineering Economy Practice Problems
Advertisements

Incremental Analysis Lecture No. 21 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
INFO 630 Evaluation of Information Systems Prof. Glenn Booker Week 8 – Chapters INFO630 Week 8.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Evaluating Business and Engineering Assets Payback Period.
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Flash back before we compare mutually exclusive alternatives.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Financing Activities Lecture No. 41 Chapter 10 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 Choice of MARR Lecture No. 62 Chapter 15 Contemporary Engineering Economics Copyright © 2006.
Engineering Economy IEN255 Chapter 4 - Present Worth Analysis  Do the product or not?  3 main issues  How much additional investment in plant & equipment.
Internal Rate of Return (Multiple Rates of Return Problem) Lecture No. 20 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Process of Developing Project Cash Flows Lecture No.38 Chapter 10 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Internal Rate of Return Criterion
Contemporary Engineering Economics, 4 th edition, © 2007 Multiple Rates of Return Problem Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
FOOD ENGINEERING DESIGN AND ECONOMICS
Intro to Engineering Economy
Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
Present Worth Analysis Lecture slides to accompany
1 Reviewing… Net Present Worth: Used to select among alternative projects. Used to compare mutually exclusive alternatives. If all expenses and revenues.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-2 Comparison of Alternatives Establishing the Planning Horizon.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
ENGINEERING ECONOMICS ISE460 SESSION 10 CHAPTER 5, June 15, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Quiz results Go over quiz Homework due.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Present Worth Analysis Chapter 5 Types of Economic Alternatives Mutually Exclusive Alternatives: –Only one of the viable projects can be selected. –The.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Internal Rate of Return Criterion.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Comparing Economic Alternatives Using time value of money to choose between two or more options.
8-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 8 Rate of Return Multiple Alternatives © 2012 by.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Effects of Inflation on Project Cash Flows
Chapter 6: Comparison and Selection Among Alternatives
Part 1 : Understanding Money And Its Management (Ch1,2,3,4) Part 2: Evaluating Business and Engineering Assets (5,6,7)
Inflation and Its Effects on Project Cash Flows
Internal Rate of Return Criterion
Chapter 6: Comparison and Selection Among Alternatives
Comparing Mutually Exclusive Alternatives
Discounted Cash Flow Analysis
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 7 Present Worth Analysis
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Lecture slides to accompany Engineering Economy, 8th edition
PRESENT WORTH ANALYSIS Chapter 5
Chapter 6: Comparison and Selection Among Alternatives
Capital Budgeting Techniques
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Chapter 6: Comparison and Selection Among Alternatives
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010

Comparing Mutually Exclusive Projects – Basic Terminologies Contemporary Engineering Economics, 5 th edition, © 2010  Mutually Exclusive Projects  Alternative vs. Project  Do-Nothing Alternative  Mutually Exclusive Projects  Alternative vs. Project  Do-Nothing Alternative

Revenue versus Service Projects Revenue Projects Service Projects Projects whose revenues depend on the choice of alternatives Revenue and cost streams vary with the choice of alternatives. Projects whose revenues depend on the choice of alternatives Revenue and cost streams vary with the choice of alternatives. Projects whose revenues do not depend on the choice of alternatives Fixed (or constant) revenues for all alternatives Projects whose revenues do not depend on the choice of alternatives Fixed (or constant) revenues for all alternatives Contemporary Engineering Economics, 5 th edition, © 2010

Analysis Period versus Required Service Period Analysis Period Required Service Period The time span over which the economic effects of an investment will be evaluated (study period or planning horizon). The time span over which the service of an equipment (or investment) will be needed. Contemporary Engineering Economics, 5 th edition, © 2010

Road Map – A Process of Making a Choice among Mutually Exclusive Alternatives Contemporary Engineering Economics, 5 th edition, © 2010

Comparing Mutually Exclusive Projects Contemporary Engineering Economics, 5 th edition, © 2010  Principle: Projects must be compared over an equal time span.  Rule of Thumb: If the required service period is given, the analysis period should be the same as the required service period.

Case 1  Analysis Period Equals Project Lives  What to do: Compute the NPW for each project over its life and select the project with the largest NPW. Contemporary Engineering Economics, 5 th edition, © 2010

Comparing projects requiring different levels of investment Assume that the unused funds will be invested at MARR. Contemporary Engineering Economics, 5 th edition, © 2010 This portion of investment will earn a 10% return on investment.

Analysis Period Implied in Comparing Mutually Exclusive Alternatives Contemporary Engineering Economics, 5 th edition, © 2010

Case 2 – Ex  Project Lives Longer than the Analysis Period  What to do:  Estimate the salvage value at the end of the required service period.  Compute the NPW for each project over the required service period.  PW(15%) A = -$362  PW(15%) B = -$364 Contemporary Engineering Economics, 5 th edition, © 2010

Case 3A – Service Projects – Ex  Project Lives Shorter than the Analysis Period  What to do:  Come up with replacement projects that match or exceed the required service period.  Compute the NPW for each project over the required service period.  PW(15%) A = -$34,359  PW(15%) B = -$31,031 Contemporary Engineering Economics, 5 th edition, © 2010

Case 3B – Revenue Projects – Ex  Analysis Period Coincides with the Project with the Longest Life in the Mutually Exclusive Group  What to do:  Compute the NPW of each project over its analysis period, assuming that no cash flows after the service life for the shorter-lived project.  PW(15%) Drill = $2,208,470  PW(15%) Lease = $2,180,210 Contemporary Engineering Economics, 5 th edition, © 2010

Case 4 – Ex  Analysis Period Is Not Specified  What to do:  Come up with replacement projects that serve out the least common multiple period (LCM).  Compute the NPW for each project over the LCM.  PW(15%) A = -$53,657  PW(15%) B = -$48,534 Contemporary Engineering Economics, 5 th edition, © 2010

Summary Present worth is an equivalence method of analysis in which a project’s cash flows are discounted to a lump sum amount at present time. The MARR or minimum attractive rate of return is the interest rate at which a firm can always earn or borrow money. MARR is generally dictated by management and is the rate at which NPW analysis should be conducted. Two measures of investment, the net future worth and the capitalized equivalent worth, are variations to the NPW criterion.

The term mutually exclusive means that, when one of several alternatives that meet the same need is selected, the others will be rejected. Revenue projects are those for which the income generated depends on the choice of project. Service projects are those for which income remains the same, regardless of which project is selected. The analysis period (study period) is the time span over which the economic effects of an investment will be evaluated. The required service period is the time span over which the service of an equipment (or investment) will be needed. The analysis period should be chosen to cover the required service period. When not specified by management or company policy, the analysis period to use in a comparison of mutually exclusive projects may be chosen by the individual analyst. Contemporary Engineering Economics, 5 th edition, © 2010