NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Carol Boser and.

Slides:



Advertisements
Similar presentations
© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
Advertisements

What is GARP®? GARP® is an Acronym for Generally Accepted Recordkeeping Principles ARMA understands that records must be.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Schedule Margin July 2013 NAVY CEVM 2 Outline Definition Program Management Perspective Background Policy/Standards Managing/monitoring Summary.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1 Commonwealth of Virginia Executive Branch Strategic Planning, Service Area Planning, and Performance-Based Budgeting Agency Strategic & Service Area.
Don Wells Hess Corporation
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
Degree and Graduation Seminar Scope Management
1 Why is the Core important? To set high expectations – for all students – for educators To attend to the learning needs of students To break through the.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
SE 555 Software Requirements & Specification Requirements Management.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Trademark Fee Cost Analysis TPAC Briefing June 9, 2009.
Software Engineering Institute Capability Maturity Model (CMM)
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
Project Management Lecture 5+6 MS Saba Sahar.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
OPR100: Overview of Enterprise Project Management & Project Management Maturity Models Melinda Curtis Product Manager, Microsoft Office Project.
NDIA PMSC Scheduling Working Group. Exploratory working group Objective Objective Brainstorm and explore concerns and issues in scheduling bring them.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
N By: Md Rezaul Huda Reza n
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting January 31, 2007 Updated Feb 4, 2007 Prepared by; Joe Houser KM.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Fred Meyer, AF PM&AE 04 February 2010 Air Force Program Management.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming Both change and stability are fundamental to process.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Improving Air Force Scheduling Processes and Tools – A Demonstration.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
Getting Everyone "On Board" for a Major IT Project Presentation to CUMREC MAY 16, 2002 Warren Mills, CEO Copyright Advantiv, Inc This work is the.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
The Project Plan Plan Your Work, then Work Your Plan
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Lil Vayhinger.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting April 24, 2007 Prepared by; NDIA IBR Working Group April 15, 2007.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
PKB’s IMS “Cheat Sheet” for DoD Program Managers
4.4 Monitor and Control Project Work
Establishing and Managing a Schedule Baseline
Project Integration Management
Guidance notes for Project Manager
ASSESS Initiative Update
Project Management Process Groups
Deconstructing Standard 2a Dr. Julie Reffel Valdosta State University
Project Integration Management
Project Integration Management
Progress Report on the Elimination of NC(V) Certificate Backlog
PM-30 Project Controls Workshop EFCOG Project Delivery Working Group
Presentation transcript:

NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Carol Boser and Mr. Fred Meyer 05 May 2010

Update on PPSS Efforts Since 10 March ICPM Meeting Briefed the GAO Cost Guide Meeting on PPSS efforts –GAO has developed/deployed nine scheduling Best Practices to assess schedule reliability –GAO developing a Scheduling Best Practices addendum to their Cost Guide –PM&AE briefed the PPSS history, charter and products Emphasis on the Generally Accepted Scheduling Principles (GASP) and development of the Scheduling Guide PPSS Scheduling Guide is a more mature product at this time –GAO and PPSS synergies and energies should be leveraged GASP and “Best Practices” are closely aligned GAO casts a wider net – construction, civilian agencies and vendors PPSS will continue to collaborate with GAO on their initiative 2 PPSS Program Management Systems Committee (PMSC)

Initial inputs received on 17 of 18 IMS Implementation Guide Sections –Remaining input expected this week Review board members are currently reviewing initial inputs –Responsible for interim approval of IMS Guide content Initial Review Board Workshop – Tues. May 11th in Crystal City DCMA participation altered due to workload –Will remain a key member of the PPSS – focal point TBD Will participate in the bi-monthly meetings and interim month telecons –Minimal/no writing assignments –Will remain a member of the Scheduling Guide Review Board –Will stay involved in controversial subjects IMS Implementation Guide 3 PPSS September 2010 is goal for IMS Guide Completion STATUS:

Page 4 Summary IMS Guide Development Schedule Deployment Begins Q4 2010

PPSS scheduling approach and products align with GAO Cost Guide Initiative –Close collaboration required to ensure consistency of definitions and processes IMS Guide completion is targeted for 28 September 2010, with initial deployment in Q –Incorporates two week slip to baseline plan The PPSS Scheduling Guide is making good progress thanks to the Government / Industry focus and collaboration 5 Summary PPSS

Back-Up 6

PPSS Members 7 PPSS

IMS Guide Review Board 8 Joshua AndersonRaytheon Mark BurchBoeing Luis ContrerasAF PM&AE (AzTech) Donna HoldenDCMA John ScapparoNAVAIR Buck Wilkerson Lockheed Martin (Humphreys and Associates) PPSS

GASP Essential Element Statements 9 A valid schedule provides reasonable & credible information based on realistic logic, durations, & dates: 1.Complete: The schedule captures the entire discrete, authorized project effort from start through completion. 2.Traceable: The schedule logic is horizontally & vertically integrated with cross-references to key documents & tools. 3.Transparent: The schedule provides visibility to assure it is complete, traceable, has documented assumptions, & provides full disclosure of program status & forecast. 4.Statused: The schedule has accurate progress through the status date. 5.Predictive: The schedule provides meaningful critical paths & accurate forecasts for remaining work through program completion. An effective schedule is useful, helps align time-phased resources, & is built & maintained using a controlled process: 6.Usable: The schedule is an indispensable tool for timely & effective management decisions & actions. 7.Resourced: The schedule aligns with actual & projected resource availability. 8.Controlled: The schedule is built, baselined, & maintained using a stable, repeatable, & documented process. PPSS