Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

Let’s watch a DVD… DVD Instructor Notes
South Old Bridge Vol. Fire Co. Standard Operation Procedures for Hazardous Material Incidents.
Spill and Overfill Prevention
DEQ Waste and Remediation Division Programs Michael McCurdy Ground Water and Remediation Section Manager Boise Regional Office.
Southwest District Storage Tanks Program presented by Leslie Pedigo Southwest District Storage Tanks Program presented by Leslie Pedigo.
Resource Conservation and Recovery Act.
Nassau County Underground Oil Tank Requirements
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
ACCA Legislative Conference Underground Storage Tank Compliance
Laboratory Chemical Waste Management
Liquid Fuels: Safe Handling and Storage. Homeowners Use Liquid Fuels For:  Vehicles  Equipment  Heating.
Spill Prevention and Response Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 8/17/
Benzene Training on the hazards of benzene in the workplace Developed by the Division of Occupational Safety & Health (DOSH) for employee training May,
Duke University Contingency Plan
Emergency Medical Response Hazardous Materials Emergencies.
East Tennessee State University Hazardous Waste Management Significant Points that must be covered Every Year.
Staying in Compliance Inventory Control Bill Greer GTEC.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
| [Contractor Safety Training] 1 Environmental Policy for Contractors.
Management of Spills & Leaks Two areas of focus: Prevention: Taking steps to minimize the potential for a spill and properly maintaining equipment to eliminate.
WasteSection 3 Section 3: Hazardous Waste Preview Bellringer Objectives Types of Hazardous Waste Resource Conservation and Recovery Act The Superfund Act.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
WasteSection 3 Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. They may be solids,
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
HAZWOPER: Awareness Level 29 CFR (q). Headline Stories Ammonia Evacuates Industrial Site Acid Spill Sends Workers to Hospital Fuel Spill Contaminate.
Managing Hazardous Chemical Waste. What is Hazardous Waste EPA Definition: A material is a hazardous waste if due to its quantity, concentration, physical,
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
PRODUCT LINE LEAK DETECTION (including a summary of the 2015 UST regulations) Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
Staying in Compliance Inventory Control Bill Greer GTEC.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Joe Stapinski Senior UST Inspector (317)
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
| Excellence. Value. Get There!™ Aboveground Storage Tanks David L. Yaussy, Spilman Thomas & Battle, PLLC.
Bellringer. Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. – They include: solids,
COMPUTER HARDWARE SERVICING
Copyright J. J. Keller & Associates, Inc. Content may be modified by subscriber per KellerOnline ® service Terms of Use. Hazardous Waste.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
1 Emergency and Disaster Response to Chemical Releases Spill Response Module 10.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
Floors, walls, and ceilings: Materials must be smooth and durable for easier cleaning Must be regularly maintained 9-3 Interior Requirements for a Safe.
Courtesy of Schools Insurance Authority. Title 8, California Code of Regulations, Section 5194 Hazard Communication determines the dangers of the chemicals.
IPECA UST Seminar IDEM Leaking UST and Excess Liability Trust Fund Updates Craig Schroer, Chief UST Branch Indiana Department of Environmental Management.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Leak Detection Equipment Tank Tightness Testing Overview Presented by C.J. Schultz Tanknology Inc.
Lesson 5 Workplace Hazardous Material Information System (WHIMIS) and
Hazardous Waste.
Edward S. Kubinsky Jr. CROMPCO, LLC
UST Inspection Program
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
Petroleum Storage Tanks – Program Updates
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
Installing and Maintaining Equipment
Alabama Tools Seminars
Chemical Transfer.
Timothy Veatch, Section Chief
Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective – 1/11/2017.
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Spill Prevention, Control and Countermeasures (SPCC)
Installing and Maintaining Equipment
EPA Corrosion Study
Soil Vapor Monitoring Bill Greer IPECA
NEW COMPLIANCE REGULATIONS
COMPLIANCE VIOLATIONS FOUND DURING INSPECTIONS
Soil Vapor Monitoring Bill Greer GTEC
Lesson 5 Workplace Hazardous Material Information System (WHIMIS) and
Presentation transcript:

Release Reporting

How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump. Check first to see if it can be repaired.

Release Reporting How Do I Know If I Have a Leak in My UST System? 2. If leak detection monitoring or testing indicates a leak. Check the monitoring/testing equipment for failures.

Release Reporting Investigate! Conduct tightness testing of the entire UST system.

Release Reporting Investigate! Conduct tightness testing of the entire UST system. Check site for additional information on the presence and source of contamination.

Release Reporting Short Term Actions: 1. Take immediate action to stop and contain the release.

Release Reporting Short Term Actions: 2. Report the release to the regulatory authority within 24 hours. However, petroleum spills and overfills of less than 25 gallons do not have to be reported if you immediately contain and clean up these releases.

Release Reporting Short Term Actions: 3. Make sure the release poses no immediate hazard to human health and safety by removing explosive vapors and fire hazards. Your fire department should be able to help or advise you with this task. You must also make sure you handle contaminated soil properly so that it poses no hazard (for example, from vapors or direct contact).

Release Reporting Short Term Actions: 4. Remove petroleum from the UST system to prevent further release into the environment.

Release Reporting Short Term Actions: 5. Investigate to determine if the release has damaged or might damage the environment. Report to the regulatory authority what you have learned from an investigation of your site according to the schedule established by the regulatory authority. Submit a report explaining how you plan to clean up the site. Additional site studies may be required.

Release Reporting Long Term Actions: 1. Develop and submit a Corrective Action Plan that shows how you will meet requirements established for your site by the regulatory authority.

Release Reporting Long Term Actions: 2. Make sure you implement the steps approved by the regulatory authority for your site.

Temporary and Permanent Closure Requirements

Temporary Closure Indefinite as long as certain requirements are met ---

Temporary and Permanent Closure Requirements Temporary Closure Maintain Leak Detection ATG’s Secondary Containment Inventory Control & Tank Tightness Testing Vapor Monitoring Groundwater Monitoring SIR

Temporary and Permanent Closure Requirements Temporary Closure Maintain Corrosion Protection

Temporary and Permanent Closure Requirements Temporary Closure If the UST remains temporarily closed for more than 3 months, you must leave vent lines open, but cap and secure all other lines, pumps, manways, and ancillary equipment.

Temporary and Permanent Closure Requirements Permanent Closure – 1. You must notify the regulatory authority 30 days before you close your own tanks.

Temporary and Permanent Closure Requirements Permanent Closure – 2. You must determine if contamination from your UST is present in the surrounding environment. If there is contamination, you will have to take the corrective actions described in the lesson on Release and Suspected Release Reporting.

Temporary and Permanent Closure Requirements Permanent Closure – 3. You can either remove the UST from the ground or leave it in the ground. In both cases the tank must be emptied and cleaned by removing all liquids, dangerous vapor levels, and accumulated sludge. These potentially very hazardous actions need to be carried out carefully by following standard safety practices.

Temporary and Permanent Closure Requirements Permanent Closure – 4. If you leave the UST in the ground, you must also fill it with a harmless, chemically inactive solid, like sand or approved foam. Your UST Contractor/Consultant can help you decide how best to close your UST so that it meets local requirements for closure.

Temporary and Permanent Closure Requirements Permanent Closure – You must submit a Closure Report within 45 days.