Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5,

Slides:



Advertisements
Similar presentations
Study Committee Representatives Annual Report December, 2012
Advertisements

Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
System Strength Discussion
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Integrating Wind on Weak Grids – CREZ Panhandle Region Sharyland Utilities July 16, 2014.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Review of BPA Voltage Control Conference
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
ERCOT John Adams September 14, 2012 Planning Guide concepts for dealing with Sub Synchronous Resonance in ERCOT & other issues.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
Overview What is a weak system? Useful metric to identify weak systems: SCR What could possibly go wrong? Is a weak system so bad? What can you do? Risk.
RTWG Report to TAC August 5, 2010 Howard Daniels.
April 23 rd OWG UFLS Survey & Power Factor Review.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
PRR835 – Reactive Power Capability Requirement
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
SLIDE 1 ISSUES AND PRACTICAL EXPERIENCES WITH CONNECTION OF WIND FARMS TO WEAK AC NETWORKS June 2013 PRESENTED BY BABAK BADRZADEH.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
VRT Study Update José Conto ERCOT System Planning.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Shun-Hsien (Fred) Huang ERCOT System Planning ERCOT RPG Meeting September 16, 2011 Preliminary Study Results of the High Frequency Oscillations in the.
Rocky Mountain Area Transmission Study Steering Committee Meeting January 13, 2003 RAWG proposed Alternatives.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Distributed Generation Registration June 30, 2008.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT Independent Review
Severe Winter Weather Resource Outage Analysis Chad Thompson Operations Working Group September
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
ERCOT – MISO DC Tie Study Comments
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
1/14/10ERCOT ROS / CREZ OGRR1 Why is CREZ Unique? 15 GW of intermittent generation when ERCOT load is less than 30 GW 5000 miles of 345 kV circuits with.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Control Engineering. Introduction What we will discuss in this introduction: – What is control engineering? – What are the main types of control systems?
Full Converter Wind Turbine Operating under Weak Grid Conditions Daniel Mueller, Walter Kuehn Frankfurt University of Applied Sciences Germany 1.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
PLWG Report to RPG January 21, 2014 Presented by John Moore, PLWG Chair.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
ERCOT – LP&L Study Status Update
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Siemens Wind Turbine Weak Grid Option Modeling in PSSE WECC library Hongtao Ma, Siemens Wind Power Joergen Nielsen, Siemens Wind Power Good morning,
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
ISO New England Net Load Analysis with High Penetration Distributed PV
Lecture 13 - Step Response of Series and Parallel RLC Circuits
Presentation transcript:

Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5, 2014

2 Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity Background In parallel with the ERCOT PREZ Study, Sharyland has been evaluating the transmission system performance in the Panhandle region, specifically:  Including generation resources meeting Section 6.9 of the ERCOT Planning Guides  Completed assessments for the Panhandle Region including:  steady state voltage security  transient voltage stability  system strength assessments  Issue:  The ERCOT Panhandle region does not have synchronous generators/machines or loads, which provide system strength to the grid via short circuit current ratio (SCR)  For wind generation control systems to work properly, a strong SCR is necessary  Synchronous condensers can provide improved system strength to mitigate the issues – but what should be the criteria for SCR for a bus and a region?  Criteria should apply to both Planning and Operations limits

3 Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity Weighted Short Circuit Ratio (WSCR)  ERCOT staff has proposed a minimum Weighted Short Circuit Ratio (WSCR) of 1.5 for the Panhandle region  WSCR would become a default minimum criteria – but not proposed as a Protocol or Planning Guide requirement  There are no known WSCR minimums elsewhere - Also important to differentiate between WSCR and the SCR requirements at the POI for turbine vendors  Sharyland utilized a Composite Short Circuit Ratio (CSCR) approach to evaluate “optimal” amount of synchronous condensers required for in the Panhandle  Both CSCR and WSCR approaches observed to yield similar results  Sharyland deems it important to investigate the “technical basis/justification” for the WSCR threshold – synchronous condenser requirements are very sensitive to the target  Using results from system strength studies performed by Sharyland, a target of 1.2 for CSCR/WSCR seems appropriate maintain control stability and 3 GW of wind exports do not require Synchronous Condensers  Using a 1.5 CSCR/WSCR requires 250 MW of Synchronous Condensers at 3 GW of wind exports

4 Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity Proposal for ROS Consideration  ROS to assign a working group to address the following:  Review the WSCR methodology developed by ERCOT  Determine the appropriate target/criteria for minimum POI SCR and Regional WSCR