Presentation is loading. Please wait.

Presentation is loading. Please wait.

NERSC User Group Meeting June 3, 2002 FY 2003 Allocation Process Francesca Verdier NERSC User Services Group Lead

Similar presentations


Presentation on theme: "NERSC User Group Meeting June 3, 2002 FY 2003 Allocation Process Francesca Verdier NERSC User Services Group Lead"— Presentation transcript:

1 NERSC User Group Meeting June 3, 2002 FY 2003 Allocation Process Francesca Verdier NERSC User Services Group Lead FVerdier@lbl.gov

2 NERSC User Group Meeting June 3, 2002 FY 2003 NERSC Allocations – Key Dates June 12: —Submissions start - use the FY 2003 Request Form in NIM —Instructions will be emailed to all PIs, Proxies, and Repo Managers July 24 (midnight): submission deadline Sept 18: award letters emailed to PIs

3 NERSC User Group Meeting June 3, 2002 What’s New for FY 2003 Resources allocated: MPP and HPSS (no PVP) New Science Categories: QCD and Climate PDSF repositories (if you have PDSF repos you can renew them for FY 2003) New questions on the request form Revised interface for the request form Revised review and award processes

4 NERSC User Group Meeting June 3, 2002 New Questions for FY 2003 If you are DOE funded, who is your DOE Program Manger? Refereed publications from the last 12 months Other publications from the last 12 months Code description questions

5 NERSC User Group Meeting June 3, 2002 Software and Algorithm Questions Programming language, libraries and other software used Description of the underlying mathematical model being solved (e.g. ODE, PDE) Algorithms and numerical techniques employed (e.g. Finite Element, Iterative Solver) Parallel programming system (e.g. MPI, OpenMP) Plans for code development

6 NERSC User Group Meeting June 3, 2002 Code Performance Questions Mflop/s rates achieved: see http://hpcf.nersc.gov/software/ibm/hpmcount/ Scalability data for parallel codes Memory, number of nodes, and wallclock time required for a single run Number of runs needed this year For help contact the consultants, consult@nersc.gov. Also see the handout. consult@nersc.gov

7 NERSC User Group Meeting June 3, 2002 Communications and I/O Questions Parallel communication bandwidth and latency requirements Offsite network I/O requirements Data requirements (space and bandwidth for permanent, scratch, and archival storage) Checkpointing features

8 NERSC User Group Meeting June 3, 2002 Revised NIM Interface for the Request Form From the My Stuff: pull-down in NIM’s Main Menu choose ERCAP Requests From the resulting ERCAP Request List click the renew link at the far right of the frame Requests are now organized into sections, each with their own tab. You edit (and submit) one section at a time.

9 NERSC User Group Meeting June 3, 2002

10 FY 2003 Review Process The Program Advisory Committee (PAC) has been replaced by the Computational Review Panel (CORP), which reports to DOE. The CORP: —reviews project accomplishments and potential for progress —provides computational ratings to the DOE Program Managers (computational approach, code optimization and scalability, communications and I/O)

11 NERSC User Group Meeting June 3, 2002 FY 2003 Award Process All production awards (DOE Base, SciDAC, Strategic) will by made by DOE Program Managers. Startup awards will be made by NERSC. Up to 7% of the MPP awards may be for non DOE funded projects.

12 NERSC User Group Meeting June 3, 2002 Multi-Year Awards On the FY 2003 Request Form you cannot request resources for years beyond FY 2003. Some DOE Program Managers may decide to grant multi-year awards. If they do, your award letter will indicate this. If you get an “out-year” award but would like more time than awarded you must re-apply and be reviewed again. If you are satisfied with the award amount, you need only fill out certain sections on the subsequent ERCAP form (e.g. Accomplishments).


Download ppt "NERSC User Group Meeting June 3, 2002 FY 2003 Allocation Process Francesca Verdier NERSC User Services Group Lead"

Similar presentations


Ads by Google