1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.

Similar presentations


Presentation on theme: "1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation."— Presentation transcript:

1 1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department RAL

2 2 Layout Hydrogen system Shielding Support system Scope

3 3 MICE layout

4 4 MICE phase I initial

5 5 MICE phase I final

6 6 Tchill

7 7 MICE hydrogen system PID

8 8 MICE hydrogen system layout: Principle Argon jacketing of pipework is proposed in outside the hood. Basic philosophy is shown below Hood MICE Cabinet for hydride bed and pipework H2sensor Argon Jacketing Safety area 1m3

9 9 MICE hydrogen system layout (2)

10 10 WP1 Initial design -> Internal safety review WP2 Detailed design and procurement WP3 Installation and commissioning WP4 Test Programme Hydrogen system R&D: Work packages

11 11 Hydrogen R&D: Layout

12 12 Hydrogen R&D: Layout (2)

13 13 Hydrogen test cryostat: Concept TH TH Instrumentation mimics what we will need on the absorber for the control system and interlocks Heater will regulate temperature of cryocooler – need redundancy and interlock with compressor Dia.Reservoir =height=290mm

14 14 Hydrogen Test Cryostat Outline 1120 Ø 580

15 15 Hydrogen test cryostat Condenser LH2 dummy absorber Level sensors Cryocooler SRDK-415 1.5 W @4.2K 35/45 W @50K Radiation shield Hydrogen inlet and outlet He inlet and outlet Cu bottom plate with heat exchanger

16 16 Hydrogen test cryostat (2) Cu bottom plate with heat exchanger Cartridge heaters Finned top plate of condenser

17 17 Outline Schedule WP1 Initial design: May – August 05 with Review in September 05 WP2 Detailed design and procurement: Aug 05 – Feb 06 WP3 Installation and commissioning: Jan – April 06 WP4 Test Programme: June – Oct 06 Hydrogen system R&D – Schedule

18 18 Radiation shielding No changes in the layout Paul is working toward a much more reasonable (and cost effective) shielding arrangement.

19 19 Magnetic shielding No changes in the layout Part of magnetic shielding wall will be installed and used as a support for hydrogen R&D test area platform. Another round of magnetic modelling is required for a full MICE magnetic shielding once position of MICE in the hall is frozen.

20 20 Support structure – Layout and sequences Add spacer

21 21 Support structure - Required rail positions MICE Stage IVMICE Stage V Rail positions of downstream detector for Stages IV & V will overlap with final stage VI rail positions

22 22 Support structure – Super-module Module to module joints to react forces in Z CC/RF module with stiff support structure

23 23 Support structure – Rail and Force transfer concept Y X Z Magnetic force Traverse in X on rail system to give location to +/- 2mm Jack from rail and position in x-y-z to survey targets on vacuum vessel Shim to blocking plates to locate in x-y-z and react forces Module Jacks Rollers Rails Floor Plate Y support location Shim Beam Axis Survey Target

24 24 Support structure – Rail-mounting concept

25 25 Support structure – Force transfer concept - Y

26 26 Support structure – Force transfer concept - Z

27 27 Possible MICE rail system

28 28 Requirements/specification: - to move (all) MICE modules out the beam (to the side direction) for various MICE stages Accuracy/tolerances: - along the beam +/- 1 mm - across the beam +/- 1 mm Adjustment: - adjustment possibility is required. Locking mechanism: - required. Loads: - max load is 6.65 tonnes. Force transfer function: - gravity force to the floor; - module-to-module axial force to the floor ? MICE support structure - Specification

29 29 ModuleWeight, kg AFC module1700 RF module4636 Radiation shield310 Tracker module6650 (including 1200 kg of magnetic shield) MICE support structure - Module weights

30 30 MICE support structure – Next steps Revise support structure requirements/specs for full MICE - include and analyze requirements of access to every module ( collect information from all technical supervisors) Suggest support structure for Stage 2 (is it different from the one for complete MICE ?) Discuss revised version of support structure at RAL meeting