PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012.

Similar presentations


Presentation on theme: "PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012."— Presentation transcript:

1 PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012

2 Current Plans Current BKED (Long) design kicker have a fill time of about 35-40ns Short BKEE/BKEF kicker modules are about half as long. They will produce a rise time of about 20ns. The voltage propagation time through the short kicker is cut from 20ns to 10ns due to half length. Two short kickers will rise faster with appropriate pulser to reach a desired flatop value. We will use a ANU style pulser using a CX2610 hydrogen thyratron rather than the existing CX1168 tube. One Pulser can drive 4 magnets

3 Current Plans Chris Jensen and EE support group is currently working on acquiring and building ANU style pulser. Pulser components will be built through out 2013. We hope to have one pulser operating in a test configuration by the end of 2013. We will try to convert one long kicker to a pair of 2 short kickers as soon as feasible(2013/14)

4 BKEE02(Short Module)

5 BKED012(Long Module)

6 BKEE001 Short 42KV Noker BKED012 Long 42KV Noker Channel 1 V in Channel 2 Vout Channel 3 Load I

7 BKEE02(Short Module) Voltage ~40kV

8 BKED012(Long Module) Voltage ~40kV

9 Preliminary Finding is a 8-15 ns difference between ANU pulser and Operational Booster pulser(Slower) Testing by Jensen, Chaurize

10 Kicker Matching Issues Testing of kicker modules has been in progress. Resolving impedance issue with first version BKEE design to BKEF version still in progress. Currently we have 3 short kickers made. 2 modules are of the BKEE design that are usable but not optimal in regards to their impedance. Testing version 2 kicker series BKEF.

11 Support Equipment for New Pulser Typical Control components Filament and Reservoir power supplies Filament and Reservoir control loop modules HV Power supply and control modules Timing modules

12 New Pulser for Short BKEF Kicker Example(ANU Pulser Test Unit)

13 East Gallery Thyratron Cabinets

14 1Long Kicker BKED Series 2 Short Kicker BKEE Series

15 Booster Tunnel Long 12


Download ppt "PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012."