4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Assembling the complete stave on the Carbon Fiber Sector Support.

Similar presentations


Presentation on theme: "4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Assembling the complete stave on the Carbon Fiber Sector Support."— Presentation transcript:

1 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Assembling the complete stave on the Carbon Fiber Sector Support

2 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Wire bonding on interior side

3 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Mounted stave cross section

4 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 1.Set the Carbon Fiber Sector Support in initial position 2.Align the halfstaves 3.Apply the glue (adhesive dependent) 4.Mount the complete stave 5.Curing & force control (adhesive dependent) Operation sequence

5 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 1 st step: Set the carbon fiber support sector in position 1.1 Mount the CFSS in indexing device 1.2 Adjust the position with the first duct horizontal 1.3 Lock in this position (it will be considered the reference position) Horizontal surface

6 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD

7 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 2 nd step: Align the halfstaves (each halfstave will be held by its own “B” support) 2.1 Put the halfstaves in the “P” support 2.2 Align the halfstaves relative each other 2.3 Align the complete stave with the reference surface A few sets of holding, aligning and supporting “B” and “P” devices have to be developed together with Bari colleagues.

8 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD “B” support (holds 2 ladders) “P” support (holds the complete stave)

9 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD AIT cool-gel 7018 Curing time: 24 hours Pressure: 10-15g/cm 2 = 83-125g/stave Removable Choice of the adhesive- an important impact in tooling design General requests: High thermal conductivity Electrical insulator Removable ! Valid choices: AIT cool-gel 7018 (used by ATLAS experiment with good results) thermoplastic adhesive films …

10 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 3 rd step: Apply the glue (AIT cool-gel 7018 case) The mask

11 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 3.1 Position the mask on the carbon fiber support (relative to the reference surface) 3.2 Apply the glue over the duct (strips) and carbon fiber (spots on each side of the duct) 3.3 Spread the glue 3.4 Remove the mask

12 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Position the maskApply the glue Spread the glue in order to obtain an uniform layer ~100-120  m Remove the mask

13 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD

14 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD X Y AIT cool-gel 7018 test results After pressing footprint Mask footprint

15 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD p=10g/cm 2 (  =1,  =2) p=15g/cm 2 p=20g/cm 2 p=25g/cm 2

16 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 4 th step: Mount the complete stave 4.1 Approach the complete stave to the carbon fiber 4.2 Mount the stave over the carbon fiber and duct in final position

17 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 5 th step: Curing & force control 5.1 Apply the pressure and cure the glue (24 hours AIT cool- gel 7018 glue)

18 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Removability issue: Possible only by chemical way (acetone) The solvent should be injected and penetrate all length of the stave Needs quite some shear & pull Difficult to separate the components also due to the superficial tension of the liquid Can be removed just one stave without disturbing the others ?

19 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD 1.Fast and safe removability (by heating) 2.Fast mounting-curing (seconds vs. hours) 3.Almost no pressure needed 4.Can be delivered in the requested shape (no mask needed) Arguments for the thermoplastic films:

20 4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD What next: Test the thermoplastic adhesive film considering the corellation with the tooling design Design the tooling for the steps independent of the adhesive type


Download ppt "4-06-02 ITS week CERNR. Dima ALICE SPD, INFN-PD Assembling the complete stave on the Carbon Fiber Sector Support."