Presentation is loading. Please wait.

Presentation is loading. Please wait.

FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America The EELA Grid Infrastructure Roberto Barbera.

Similar presentations


Presentation on theme: "FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America The EELA Grid Infrastructure Roberto Barbera."— Presentation transcript:

1 FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America The EELA Grid Infrastructure Roberto Barbera EELA Technical Coordinator Univ. of Catania and INFN On behalf of Diego Carvalho Pilot Test-bed Operations and Support Manager EELA Workshop at EGEE’07 Budapest, 03.10.2007

2 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 2 Outline Introduction e-Infrastructure activities EELA PKI EELA Grid Conclusions

3 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 3 EELA in One Slide Researchers are taught about how to perform their activities regardless of their geographical location, interact with colleagues, share and access data. Scientific data (HEP, Biomed, e-Learning, Climate, etc.) can be accessed and shared across Europe and La- tin America. The Pilot Test-bed: networked data proces- sing centres in EU and LA are “glued” by the EGEE ”middleware”.

4 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 4 WP2 in the EELA Organisation

5 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 5 Pilot Test-bed coordination –management set up & coordination –project execution plan Authentication and Authorization –implementation, operation and support of required Certification Authorities (CA) –international CA coordination –set up of Virtual Organisation (VO) infrastructure and maintenance Overview of activities - 1/2

6 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 6 Operations –installation of the pilot Test-bed –Test-bed operation and monitoring –definition and implementation of Security Policies & Protocols Network –survey of application requirements –feasibility study of new network service offerings –monitoring of network performance –deployment of new integrated monitoring infrastructure Overview of activities - 2/2

7 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 7 Authentication Infrastructure Before EELA CA fully accredited EU “catch-all”

8 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 8 Authentication Infrastructure right after the EELA Start-up CA fully accredited EU “catch-all” RA

9 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 9 EELA Certification Authorities Deployed Now CA fully accredited EU “catch-all” CA fully accredited LA “catch-all”, accr. Deployed, in review in preparation CA RA/ CA

10 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 10 Deployment of 6 CAs: Brazil Catch-all Argentina Chile Mexico Venezuela Milestone - M2.2.1 Latin America Certification Authority Operational - M07 Vinod Rebello from UFF is chair of TAGPMA !

11 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 11 Milestone - M2.3.1 Pilot Test-bed Operational - M07 Six months before due time 5 partners 4 Resource Centres (RC) Top Level BDII, LDAPs, Resource Brokers, etc 600 Jobs RedCLARA - Géant traffic rate on 2006.02.01 – LA-Europe is in Blue ALICE Link

12 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 12 Metric 4/16 (cont) Temporal Evolution

13 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 13 Metric 4/16 (cont) Present Structure

14 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 14 Metric 4/16 Number of sites participating in the Pilot e-Infrastructure Production sites (12) – 7 in Europe – 5 in Latin America Certification (6) – 1 in Europe – 5 in Latin America EELA has two Test-beds: Certification - sites under validation Production - available to users EELA uses the same certification process as EGEE

15 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 15 Metric 5/16 Resources integrated into the Test-bed (last-year view) Production sites (source GStat) CPU Slots evolution

16 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 16 Metric 6/16 Statistics of use of the Pilot Test-bed Successful jobs ~ 430 K jobs ~ 400 CPU years

17 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 17 Milestone - M2.2.2 EELA VO infrastructure Operational - M07 EELA AUP VOMS and LFC Servers LA’s User Interfaces

18 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 18 Metric 12/16 Number of EELA VOs and evolution of the number of users Two distinct VOs: EELA and EDTEAM Two HEP VOs: ALICE and LHCb Resource Centres may support other VOs EELA and EDTEAM VOMS Statistics more than 120 users

19 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 19 Milestone - M2.3.2 Pilot Test-bed monitoring and Security Policies operational - M12 Monitoring Tools SAM, GStat, GridICE, Real Time Grid Monitor EELA contributed with the SAM Dashboard Security Security Executive Body (SEB) Security Staff Body (SSB) Security Policies & Protocols

20 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 20 the most comprehensive application survey the most thorough LA network analysis infrastructure application requirements Milestone - M2.4.1 Network Studies - M12

21 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 21 EELA and RedCLARA EU-LAC Summit SC-01 95% of the tot. bw! EELA is one of the most important customers of RedCLARA!

22 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 22 Metric 1/16 Expertise –only UFRJ, CIEMAT, CERN and INFN had prior experience with EGEE middleware –specific training program and documentation –Regional Operation Centre tutorial (ROC-on-duty) –net result: our documents are accessed worldwide Geomap of EELA GOC access Nov 2006

23 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 23 Metric 9/16 Number of queries issued and solved by EELA Helpdesk To date: 222 support tickets 202 solved tickets (90.9%) 2 in hold Future integration with Network Helpdesk escalation up to EGEE

24 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 24 Proportion of special activities successfully supported by the Pilot Test-bed Metric 8/16 EELA Kick-of-meeting Lisbon EU-LAC Summit EELA Conferences Operator-on-duty tutorial 3 tutorials 4 data challenges 1st and 2nd EELA grid school - (Stand Alone Grid) WP2 fulfilled 100% of requests EGRIS logistics

25 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 25 Metrics 13/16 Major network requests handled Enabling of International routing for high speed access to RCs in Rio de Janeiro Enhancement of End-to-End Performance –Tuning of TCP/IP streams over Fat Pipes Specific setups for events –EU-LAC Summit (dedicated connection to NREN) –1st EELA Conference  Bandwidth increase for data challenge  VPN providing connection to EELA network infrastructure – 3rd Tutorial – EGRIS-1 (stand-alone-grid) and other specific actions

26 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 26 Metric 14/16 Requests of Advanced Network use from the e- Infrastructure (implementation and monitoring) TCP/IP streams over Fat Pipes (RedCLARA/GÉANT2 link) perfSONAR monitoring system

27 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 27 Time schedule till the end of the project PQW = production quality week

28 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 28 Forthcoming Service Challenges SC-3 – to tune FTS channels between UFRJ and CETA. Request 450 Mbs for week days and 500 Mbps for the weekend EELA managed to use 550 Mbs from Alice Link (622Mbps) SC-4 – to tune FTS channels between ULA, UFF, UFRJ, CETA and 2 European partners. CLARA will check the ULA’s infra. Request 450/500 Mbps SC-5 – measure the aggregated bandwidth of the Prod. Infra. Request 150/250/450/500 Mbps

29 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America EELA Workshop at EGEE’07 - Budapest – 03 October 2007 29 Conclusions WP2 Global highlights –Setup of a Pilot Test-bed with 5 sites (only 3 sites were committed in TA and 6 months before the expected date) –After 21 months: 18 integrated sites –Over 400 CPU · years delivered –EELA Public Key Infrastructure is a landmark in LA –2 EELA VOs and support for several EGEE VOs –Network studies providing the full picture of network characteristics for future application deployment


Download ppt "FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America The EELA Grid Infrastructure Roberto Barbera."

Similar presentations


Ads by Google