Presentation is loading. Please wait.

Presentation is loading. Please wait.

Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM.

Similar presentations


Presentation on theme: "Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM."— Presentation transcript:

1

2 Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM

3 TOTAL ROAD MAP: 15 weeks MONEY COLLECTION MANUFACTURING 7 WEEKS INSTALLATION 7 WEEKS

4

5

6

7

8 PRODUCT & QUALITY DIRECT FACTORY PRICE. WOOD FRAME WINDOWS WITH DOUBLE GLASS AND ARGON GAZ INSULATION

9 COST FOR 3 FLOORS 20 000€ including installation: –GROUND FLOOR: 10 WINDOWS + 2 DOORS –1 st floor: 16 BIG 2 PARTS WINDOWS –MEZZANINE: 7 SMALL WINDOWS

10 PROJECT CAN BE FOLLOWED ON CABELLA WORLD CENTER WEBSITE: –http://cabellaworldcenter.org/home/

11


Download ppt "Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM."

Similar presentations


Ads by Google