CONCRETE TESTING. Water can effect the workability and strength of concrete.

Similar presentations


Presentation on theme: "CONCRETE TESTING. Water can effect the workability and strength of concrete."— Presentation transcript:

1 CONCRETE TESTING

2 Water can effect the workability and strength of concrete

3 How will you know if you are using too much water?

4 TESTS!!

5 Why should you do these tests? PROTECTION!! As a Contractor: If there ends up being trouble with your concrete you want to have proof that you poured it within certain standards. As a Owner: You want to make sure you are getting a quality product. TEST OR IT COULD COST YOU MONEY!!

6 CONCRETE TESTS COMPRESSION TEST (CYLINDER TEST) MEASURE COMPRESSIVE STRENGTH OF CONCRETE MEASURED BY PSI (LBS. PER SQ. IN.) SLUMP TEST MEASURE WORKABILITY & WETNESS MEASURED BY INCHES

7 CYLINDER TEST -Tests Compressive Strength -Measured by PSI (Lbs. Per Sq. In.) -Taken to lab -Soaked in water tank -3 are usually made -7 day break -14 day break -28 day break -Minimum 3500 psi when broken on day 28

8 CYLINDER TEST Write on cylinder -Date -Tester’s Name -Jobsite -Fill with 3 layers and rod each layer 25 times -Try not to move after making -Keep out of direct sun -Take to lab within 24 hrs.

9 http://www.youtube.com/watch?v=AR_fjmV2Mpk Breaking Test Cylinders at the Lab

10 SLUMP TEST -Measures workability and wetness of concrete -Measured by inches -A slump of 2-4 inches is usually called for -This test is popular due to the simplicity of the testing apparatus and the procedure

11

12 SUMMARY -Too much water can affect the strength of concrete -To check the strength of concrete there are tests that can be conducted -Testing will protect you -A slump test measures the workability and wetness of concrete -A slump test is measured in inches/ 2-4 inches is preferable -A slump tester should be filled in 3 layers./Ea. layer rodded 25 times -A cylinder test will test the compressive strength of concrete -A cylinder test is measured in PSI (Lbs. per Sq. In.) -3 cylinders are usually made/Broken between 7-28 days @at lab -Cylinders must not be moved/Cylinders not set in the sun -Cylinders must be labeled (Date/Name/Jobsite) -Cylinder must be filled in 3 layers/Ea. layer rodded 25 times

13 THE END! Thank you!!