Counselor dr. Otilia Mihail Ministry of Environment, Water and Forest Constanta 17 June 2015 .

Similar presentations


Presentation on theme: "Counselor dr. Otilia Mihail Ministry of Environment, Water and Forest Constanta 17 June 2015 ."— Presentation transcript:

1 Counselor dr. Otilia Mihail Ministry of Environment, Water and Forest Constanta 17 June 2015 Email. otilia.mihail@mmediu.rotilia.mihail@mmediu.ro

2 Aim of directive – to achieve or maintain the good environmental status by 2020 Pressures:  Overfishing,  Nutrient and organic enrichment  Contamination by hazardous subtances  Pollution withpetroleum  Introduction of non-indigenous species  Climate changes Loss of biodiversity, degradation of habitats

3

4 Transposition  Emergency Governmental Ordinance 71/2010, and adopted by Law 6/2011, and amended by Law 205/2013 Implementation: - Initial assessment (art.8) - Determination of GES (art.9) - Set up the environmental targets (art. 10) - Reporting – written national report (15 July 2012) - sheets – ( 15 October 2012) -Monitoring programme (art.11) – reporting -December 2014 - Programme of measures – March 2016

5 Technical and administrative support for the joint implementation of the Marine Strategy Framework Directive (MSFD) in Bulgaria and Romania (phase I) Aim of the phase I of the project – support both MS to set up the common monitoring programme in the Black Sea marine region (art.6)

6 Outcomes of the project :  common indicators, GES and environmental targets  monitoring fact sheets  developing of joint work plan  maintaining the information exchange platform  developing a public web page

7  Updated programme of monitoring: - 11 programme for each descriptor, - subprogramme  Improvements  Increasing the number of sampling stations in marine waters  Review of methodological requirements to set up the GES values for all descriptors  Increasing the number of biological elements studied which compose the web food (macroalgae, zooplankton, non-commercial fish, dolphins population, sea birds)  Collecting samples of marine litter  Initiation of monitoring of energy and noise that affect the structure of the marine ecosystem

8  Public consultation (art.19) – one month (29 August – 29 September 2014)  Weak reaction of public  Inputs for Descriptor 3 (commercial fish), Descriptor 5 (eutrophication), Descriptor 8 (concentration of contaminants)

9  Programme of measures (art.13) Technical and administrative support for the joint implementation of the Marine Strategy Framework Directive (MSFD) in Bulgaria and Romania (phase II) - Aim – setting up joint or coordinated programme of measures - Round tables with stakeholders involved in marine issues - Posting on the website of Ministry on Environment, Water and Forest

10  Input controls: management measures that influence the amount of a human activity that is permitted.  Output controls: management measures that influence the degree of perturbation of an ecosystem component that is permitted.  Spatial and temporal distribution controls: management measures that influence where and when an activity is allowed to occur.

11  Management coordination measures: tools to ensure that management is coordinated.  Measures to improve the traceability, where feasible, of marine pollution  Economic incentives: management measures which make it in the economic interest of those using the marine ecosystems to act in ways which help to achieve or maintain the good environmental status objective.  Mitigation and remediation tools: management tools which guide human activities to restore damaged components of marine ecosystems.

12 MeasuresCategory of measures Article 13(1) & 13(2) Measures relevant for the maintenance and achievement of GES under the MSFD that have been adopted under other policies and implemented EXISTING 1.a Article 13(1) & 13(2) Measures relevant for the maintenance and achievement of GES under the MSFD that have been adopted under other policies but that have not yet been implemented or fully implemented EXISTING 1.b Art 13(3) Additional measures to achieve GES which build on existing EU legislation and international agreements but go beyond what is already required under these NEW 2.a Art 13(3) Additional measures to achieve GES which do not build on existing EU legislation or international agreements, i.e. that are completely new NEW 2.b