SITEX WP2.1 NEEDS FOR TECHNICAL GUIDANCE F. Lemy - F. Bernier - 1GEOSAF II TM – SITEX WP2.1 – 28/05/2014.

Similar presentations


Presentation on theme: "SITEX WP2.1 NEEDS FOR TECHNICAL GUIDANCE F. Lemy - F. Bernier - 1GEOSAF II TM – SITEX WP2.1 – 28/05/2014."— Presentation transcript:

1 SITEX WP2.1 NEEDS FOR TECHNICAL GUIDANCE F. Lemy - F. Bernier - 1GEOSAF II TM – SITEX WP2.1 – 28/05/2014

2 Main objective: To define the conditions and means for establishing a coordinated European (and possibly international) workforce ensuring a sustainable capability to provide a technical and independent expertise in the field of radwaste management safety and radiological protection December 2011 – December 2013 http://sitexproject.eu/ SITEX Project 22GEOSAF II TM – SITEX WP2.1 – 28/05/2014

3 WP2: Needs for guidance and technical support WP3: Needs for R&D and opportunities for joint programming WP4: Needs for review guidance and training WP5: Conditions for interacting with civil society WP6 Missions of the future European network of experts SITEX WPs 3GEOSAF II TM – SITEX WP2.1 – 28/05/2014

4 WP2 Objective To set up the conditions for allowing mutual understanding between National Safety Authorities (NSAs), Technical Safety Organisations (TSOs) and Waste Management Organisations (WMOs) 4GEOSAF II TM – SITEX WP2.1 – 28/05/2014

5 WP2.1 : Needs for Technical Guidance WP2.2 : Needs for Expertise and Technical Support WP2 Tasks 5GEOSAF II TM – SITEX WP2.1 – 28/05/2014

6 WP2 Participants Organisations IRSN (FR)TSO GRS (DE)TSO Bel V (BE)TSO NRI (CZ)TSO NRG (NL)TSO DECOM (SK)TSO EL&I (NL)NSA ASN (FR)NSA SSM (SE)NSA FANC (BE)NSA CNSC (CA)NSA ENSI (CH)NSA MUTADIS (FR)Other 6GEOSAF II TM – SITEX WP2.1 – 28/05/2014

7 Requirement 2 of IAEA SSR-5: The regulatory body shall a.o.: establish regulatory requirements for the development of different types of disposal facility for radioactive waste undertake international cooperation, as necessary, to fulfil its regulatory functions provide guidance on: – the interpretation of the national legislation and regulatory requirements as necessary – what is expected of the operator WP2.1 Context: Responsibilities of the Regulatory Body Regulatory expectations (WP2.1) 7GEOSAF II TM – SITEX WP2.1 – 28/05/2014

8 WP2.1 Objective Identification of the areas where dialogue, development and harmonization of technical guidance is needed in priority 8GEOSAF II TM – SITEX WP2.1 – 28/05/2014

9 9 Compliance demonstration Regulatory expectations Technical dialogue Regulatory function Expertise function Implementing function 9 Regulatory expectations & needs Support for regulatory decision Technical dialogue Dialogue Society function v. 2013-04-26 Regulatory body and its supporting organizations SITEX: the expertise function and its interactions WP2.1 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

10 WP2.1: Needs for guidance WP4.1: Needs for review guidance WP5: Conditions for interacting with civil society WP6 Missions of the future European network of experts Interactions Between WP2.1 & Other WPs 10GEOSAF II TM – SITEX WP2.1 – 28/05/2014

11 Title: “Overview of existing technical guides and further development” Description: An overview of existing technical guides including an identification of: – common points and differences – the needs for further development, harmonization and dialogue Soon available ! WP2.1 Deliverable 11 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

12 Identification of the areas where technical guidance and dialogue are needed in priority WP 2.1 TARGET Safety requirements (WENRA, IAEA,…) Common points & differences Existing regulatory guides IGD-TP vision Safety Topic List Overview of existing regulatory guides Exchanges with IGD-TP & Civil Society A priori identification of development needs Needs for further development, harmonization and dialogue WP2.1 Inputs WP2.1 Steps 12 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

13 Safety requirements on which international consensus exists are taken as reference: EC Directive on SF & Radioactive Waste Management (2011/70/Euratom) Draft WENRA Safety Reference Levels (SRLs) – Set of requirements against which the situation of each country is assessed – Engagement to transpose SRLs into national regulatory frameworks of WENRA member states IAEA Safety Fundamentals and Requirements ICRP recommendations WP2.1 Working Hypotheses (1/2) 13 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

14 Technical guidance: associated with one or several safety requirements may serve different purposes: – Interpretation of requirements – Explanation of how requirements can be met in practice and/or how compliance should be substantiated – Facilitate dialogue and interactions with the public or with other stakeholders possible audiences: implementers, experts fulfilling an expertise or a regulatory function, public or other stakeholders WP2.1 Working Hypotheses (2/2) 14 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

15 Safety topics identified based on existing “high-level” safety requirements: Governing principles: – Radiation protection principles – Protection of present and future generations – Defence in Depth & Robustness – Demonstrability & Feasibility –…–… Safety policy & strategy: – Safety strategy: “High-level approach for achieving safe disposal” – addresses the implementation of the “governing principles” Safety Topics (1/4) 15 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

16 Management system: – Organisational structure – Resources – Process implementation (including QA) – … Safety Topics (2/4) 16 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

17 Site selection Design Construction Operation Closure & Decommissioning Period after closure and institutional controls Waste acceptance Monitoring Safety Topics (3/4) 17 Requirements associated with specific phase(s) of repository development 17GEOSAF II TM – SITEX WP2.1 – 28/05/2014

18 Safety case and assessment: – Objectives and scope, Graded approach, SC/SA content vs. regulatory decision steps – Characterisation, knowledge and system understanding – SA methodologies, approaches & tools: Timescales and timeframes, uncertainties, deterministic vs. probabilistic approaches, scenario development, models,… – Indicators & criteria – Operational safety assessment – Long-term safety assessment – Periodic safety review – Independent verification Safety Topics (4/4) 18 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

19 Investigations and feedback of information on operating experience Operational limits and conditions Modifications Emergency preparedness and response Maintenance, periodic testing and inspection Occupational exposure Public exposure Receiving, handling and emplacement of waste Operation: Sub-topics 19GEOSAF II TM – SITEX WP2.1 – 28/05/2014

20 Example: Requirements associated with the safety topic “Construction” Safety Topics vs. Requirements 20 Construction SRL 2.5.1 SRL 2.5.2 SRL 2.5.3 SRL 2.5.4 SSR-5 R17- Requirements SAFETY TOPICSWENRA SRLsIAEA Principles & Requirements EC directive 2011/70/Euratom & ICRP Recommendations 20GEOSAF II TM – SITEX WP2.1 – 28/05/2014

21 Needs of NSAs/TSOs for guidance development and/or dialogue have been identified based on: Questionnaire on existing, used and needed guidance Comparison of existing technical guides These needs have been prioritized considering the level of « urgency », importance for safety, the level of interest,… Identification of the Needs of NSAs & TSOs 21 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

22 ~100 needs were identified !!! 35 needs identified as having a high level of interest and urgency, e.g.: – Development of the “design basis”, including the consideration of : normal and anticipated operational conditions & possible accidents disturbing FEPs during operation whose consequences may affect post-closure safety – Hazards associated with concurrent activities Prioritization the NSAs & TSOs Needs 22 GEOSAF II TM – SITEX WP2.1 – 28/05/2014

23 Identified Needs: Construction 1 Implication of constraints associated with nuclear safety on the management of construction activities (including construction procedures, quality control,…) 2Information that shall be gathered during construction 3 Approach to deal with design modifications that may occur during construction 23GEOSAF II TM – SITEX WP2.1 – 28/05/2014

24 Identified Needs: Operation (1/2) 1 Operation in accordance with the conditions of the license and regulatory requirements 2 Specificities of operation of an underground nuclear facility (including aspects such as fire protection, ventilation,...) 3Waste handling and emplacement 4 Maintenance, periodic testing and inspection: Ageing of equipment and structures during the operational phase Programmes and records 24GEOSAF II TM – SITEX WP2.1 – 28/05/2014

25 Identified Needs: Operation (2/2) 5 Operating limits and conditions (OLCs): How to establish and substantiate OLCs, how to maintain OLCs to ensure compliance with end-state, how to meet OLCs and assurances that they are being met, feedback from other (nuclear) facilities,… 6 Modifications of design, waste acceptance criteria, structures, systems and components (SSCs), operational limits and conditions (OLCs) and operational procedures and methods 7 Emergency preparedness: Feedback from emergency plans existing in mines, tunnels and other non-nuclear underground facilities,… 8Ensuring post-closure safety during operation 25GEOSAF II TM – SITEX WP2.1 – 28/05/2014

26 Conclusions 26 WP2.1 was mainly aimed at: fostering mutual understanding and dialogue between NSAs, TSOs and WMOs identifying and anticipating the needs for technical guidance Safety requirements, technical guides and needs associated with the construction, operation & closure of a GDF have been identified Deliverable soon available GEOSAF II TM – SITEX WP2.1 – 28/05/2014

27 Thank you for your attention ! 27GEOSAF II TM – SITEX WP2.1 – 28/05/2014


Download ppt "SITEX WP2.1 NEEDS FOR TECHNICAL GUIDANCE F. Lemy - F. Bernier - 1GEOSAF II TM – SITEX WP2.1 – 28/05/2014."