The Development of Standards for the Rail Transit Industry Project TCRP G-4 APTA Rapid Rail Conference June 2000 - St. Louis Thomas J. McGean, P.E.

Similar presentations


Presentation on theme: "The Development of Standards for the Rail Transit Industry Project TCRP G-4 APTA Rapid Rail Conference June 2000 - St. Louis Thomas J. McGean, P.E."— Presentation transcript:

1 The Development of Standards for the Rail Transit Industry Project TCRP G-4 APTA Rapid Rail Conference June 2000 - St. Louis Thomas J. McGean, P.E.

2 TCRP G-4 PROGRAM Project Begun in 1996 Sponsored by FTA, Administered by TRB and TDC (APTA) Approach – establish an institutional framework for developing transit standards within IEEE and ASME engineering societies – demonstrate the process by developing one or more needed standards

3 WHY TCRP G-4 USES ENGINEERING SOCIETIES? Automatic ANSI Certification Complies with PL 104-113 & OMB A-119 Rules, Procedures & Oversight already in place at no cost to transit industry Professional standards experts available to assist at no cost Large reservoir of existing case law IEEE & ASME assume standards liability risk

4 CONSENSUS STANDARDS PRINCIPLES Must be present to meet PL 104-113 –Due Process –Openness –Consensus –Balance –Right of Appeal

5 PROJECT FACT SHEET FY 00 Budget – $175K Facilitation/Management –$125K Transit Agency Travel Number of Working Groups –IEEE 15 ASME 2 Transit Professionals involved - 300 –90 transit agency 100 supplier 70 consultant 40 other Leverage of TCRP Dollars - 7.6/1 Standards Published to Date - 7 Estimated Annual Savings - $1/3 billion

6 How Standards Save Money –rationalize procurement process –reduce “custom engineering” –simplify maintenance activities –reduce spare parts inventory –reduce training costs Introduction of Microprocessors Makes All of These More Critical –IEEE 1473 Alone Estimated to Save NJT $420K/year

7 KEY STANDARDS PUBLISHED TO DATE IEEE 1473-1999 Communications Protocol IEEE 1474.1-1999 Communications Based Train Control Performance & Function IEEE 1482.1-1999 Event Recorder IEEE 1475-1999 Propulsion, Braking & Train Control IEEE 1477-1998 Passenger Information IEEE 1483-2000 Software Verification IEEE 1476-2000 Auxiliary Power Interface IEEE 11-1999 Electric Motors

8 Other TCRP G-4 Standards Environmental - Being balloted LRV Crashworthiness - Being balloted Rail TCIP - Underway Battery Physical Interface - Underway Software Documentation - Underway Electronic Control - Underway Railcar Structural - Being formed NiCad Battery Peformance - PAR stage HRI - PAR stage Central Control CBTC Graphic Interface - PAR stage Vehicle/Wayside Communication Protocol - Proposal

9 Status of Standards Activity

10

11 CONCLUSIONS TCRP G-4 has implemented a complete consensus standards system for rail transit 7 IEEE Standards Published, 8 IEEE and 2 ASME Standards Underway Potential Savings of $1/3 Billion/Year Leverages Public R&D Funds 8/1 Alternative to Federal Regulation