Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.

Similar presentations


Presentation on theme: "Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah."— Presentation transcript:

1 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah

2 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Purpose Methodology Results Recommendations Intro Purpose Procedure Results Summary Breadth

3 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Riverpark 1  Salt Lake City, Utah  90,000 sf  3 story office building  Feb 2001 - Jan 2002

4 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air System (DOAS) with Parallel Sensible Cooling and heating Space Ewccsw Oa Ra

5 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Doas chilled water schematic CT T T T CH

6 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Doas chilled water schematic T CT T T T CH

7 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Oa Ra Space cc VAV Box Variable Air Volume System

8 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth vav chilled water schematic CT T T CH

9 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth vav chilled water schematic T CT T T CH

10 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Existing investigation  Single zone  non-office buildings  modeled with commercial software

11 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Procedure  HAP - Building envelope loads  excel - addition of space loads  EES - transient conditions, equipment and plant models

12 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920.00 $10,920 Fan Energy$2,200$2,200.00 $8,485.00 $8,450 Pump Energy$2,250$2,250.00 $1,500.00 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735

13 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920 Fan Energy$2,200 $8,485 $8,450 Pump Energy$2,250 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735

14 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth

15 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth

16 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920 Fan Energy$2,200 $8,485 $8,450 Pump Energy$2,250 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735

17 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920 Fan Energy$2,200 $8,485 $8,450 Pump Energy$2,250 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735

18 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth

19 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Chiller$110,000$85,000 $110,000$85,000 Cooling Tower-$30,000 - Water Side Econ--$30,000-- AHU’s$45,000 $136,000 Boiler$20,000 Pumps$20,000 $16,000 Duct Work$100,000 $210,000 Radiant Panels$520,000 --- Baseboard Heat$20,000 --- VAV Boxes---$146,000 Total$835,000$840,000$870,000$638,000$643,000$673,000

20 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Chiller$110,000$85,000 $110,000$85,000 Cooling Tower-$30,000 - Water Side Econ--$30,000-- AHU’s$45,000 $136,000 Boiler$20,000 Pumps$20,000 $16,000 Duct Work$100,000 $210,000 Radiant Panels$520,000 --- Baseboard Heat$20,000 --- VAV Boxes---$146,000 Total$835,000$840,000$870,000$638,000$643,000$673,000

21 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Chiller$110,000$85,000 $110,000$85,000 Cooling Tower-$30,000 - Water Side Econ--$30,000-- AHU’s$45,000 $136,000 Boiler$20,000 Pumps$20,000 $16,000 Duct Work$100,000 $210,000 Radiant Panels$520,000 --- Baseboard Heat $20,000 --- VAV Boxes---$146,000 Total$835,000$840,000$870,000$638,000$643,000$673,000

22 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Recommendations - Doas  Two Ahu’s  Fan Coil Units for parallel systems  VAV system for parallel system

23 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Recommendations - Vav  Supply fan pressure optimization  Enthalpy Wheel  Demand Controlled Ventilation

24 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah acknowledgements  Dr. Jeong  Dr. Mumma  Davis Mulholand, CCI  Ed Newville, CCI  Jim Norton, Walton & co  Mike Ulsh, Trane

25 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Questions?

26 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Building Controls  30,000 sf single story office  Equipment has been primary focus of research and development  can be hard to justify added expenditure  potential for savings is quite large

27 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Occupancy sensors  $125 / each  $8,750 total installed cost  Control lights  Tie into Building automation system

28 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Lighting  four hour reduction in lighting per day  25,000 sf of space controlled by sensors  $2,750 annual savings  Simple payback of just over 3 years, from lights alone

29 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Demand Controlled ventilation  Ashrae stnd 62.1-2004  greater than 50% reduction in ventilation air  4 ton reduction in oa load at design cooling  112 mbtu reduction in oa load at design heating

30 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Occupancy Sensors  Exhaust – interlocked with bathroom exhaust  Occupied / unoccupied temperature reset scheme

31 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Supply fan pressure optimization  Fan outlet - $3,950/yr  2/3 down - $2,950/yr  Critical box reset - $2,200/yr

32 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah acknowledgements  Dr. Jeong  Dr. Mumma  Davis Mulholand, CCI  Ed Newville, CCI  Jim Norton, Walton & co  Mike Ulsh, Trane

33 Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Questions?


Download ppt "Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah."