Developing Load Reduction Estimates Caused by Interrupting and/or Curtailing Large Customers By Carl L. Raish 2000 AEIC Load Research Conference.

Similar presentations


Presentation on theme: "Developing Load Reduction Estimates Caused by Interrupting and/or Curtailing Large Customers By Carl L. Raish 2000 AEIC Load Research Conference."— Presentation transcript:

1 Developing Load Reduction Estimates Caused by Interrupting and/or Curtailing Large Customers By Carl L. Raish 2000 AEIC Load Research Conference

2 July 31, 2000 2000 AEIC Load Research Conference 2 Tampa Electric’s Interruptible Rate Class 32 Customers, 72 Accounts 1,631.5 GWH for Class in 1999 22.8 GWH per Account 7.6 MW Average Non-coincident Peak 285.9 MW 1999 Class Peak 174.3 MW at 1999 Winter Peak 60.8 MW at 1999 Summer Peak

3 July 31, 2000 2000 AEIC Load Research Conference 3 As a result of statewide generation shortages in 1999 the number of interruptions was at a record level

4 July 31, 2000 2000 AEIC Load Research Conference 4

5 July 31, 2000 2000 AEIC Load Research Conference 5

6 July 31, 2000 2000 AEIC Load Research Conference 6

7 July 31, 2000 2000 AEIC Load Research Conference 7

8 July 31, 2000 2000 AEIC Load Research Conference 8 Reduction Estimates at Individual Account Level Need to estimate amount of load interrupted in MW and MWH during 1998 and 1999 Use account 15-minute data for the year (100% load research sample in place) For each interruption, select demands for the day prior to and the day of interruption

9 July 31, 2000 2000 AEIC Load Research Conference 9

10 July 31, 2000 2000 AEIC Load Research Conference 10 Reduction Estimates at Individual Account Level Notification is typically sent out 2 hours before actual interruption Find 10 closest matching day-pairs (without interruptions) -- match demands for the entire day before and the day of interruption up to 3 hours before start of interruption Average the 10 day-pairs together by interval

11 July 31, 2000 2000 AEIC Load Research Conference 11

12 July 31, 2000 2000 AEIC Load Research Conference 12 Reduction Estimates at Individual Account Level Run linear regression on intervals prior to interruption Model actual demand as a function of average demand If R-square >.5 and there are no outliers, then use the regression estimate. Otherwise, use the 10-day average demands

13 July 31, 2000 2000 AEIC Load Research Conference 13

14 July 31, 2000 2000 AEIC Load Research Conference 14 Reduction Estimates at Individual Account Level Run linear regression on intervals prior to interruption Model actual demand as a function of average demand Apply model to the average demands for the rest of the day to predict what the demand levels would have been without an interruption

15 July 31, 2000 2000 AEIC Load Research Conference 15

16 July 31, 2000 2000 AEIC Load Research Conference 16 Reduction Estimates at Individual Account Level Interruption / curtailment starts when the percentage difference between the actual demand and the predicted demand is negative and its absolute value is greater than all differences prior to the interruption Interruption / curtailment ends when residual goes positive after the interruption end time or the residual percentage is 2/3 of the maximum

17 July 31, 2000 2000 AEIC Load Research Conference 17

18 July 31, 2000 2000 AEIC Load Research Conference 18 Reduction Estimates at Individual Account Level Interruption / curtailment amount is the difference between the actual and predicted demands

19 July 31, 2000 2000 AEIC Load Research Conference 19

20 July 31, 2000 2000 AEIC Load Research Conference 20

21 July 31, 2000 2000 AEIC Load Research Conference 21

22 July 31, 2000 2000 AEIC Load Research Conference 22 Reduction Estimates at IS Class Level Sum individual account reduction amounts on an interval-by-interval basis to obtain class totals

23 July 31, 2000 2000 AEIC Load Research Conference 23

24 July 31, 2000 2000 AEIC Load Research Conference 24 Apply the same method and compare results on some days in 1999 without interruptions

25 July 31, 2000 2000 AEIC Load Research Conference 25

26 July 31, 2000 2000 AEIC Load Research Conference 26

27 July 31, 2000 2000 AEIC Load Research Conference 27

28 July 31, 2000 2000 AEIC Load Research Conference 28

29 July 31, 2000 2000 AEIC Load Research Conference 29

30 July 31, 2000 2000 AEIC Load Research Conference 30

31 July 31, 2000 2000 AEIC Load Research Conference 31 Dealing with interruptions / curtailments on consecutive days One occurrence in 1998: June 22 and 23 Four occurrences in 1999: April 5 and 6, April 23 and 24, July 29, 30 and 31

32 July 31, 2000 2000 AEIC Load Research Conference 32

33 July 31, 2000 2000 AEIC Load Research Conference 33

34 July 31, 2000 2000 AEIC Load Research Conference 34

35 July 31, 2000 2000 AEIC Load Research Conference 35

36 July 31, 2000 2000 AEIC Load Research Conference 36

37 July 31, 2000 2000 AEIC Load Research Conference 37

38 July 31, 2000 2000 AEIC Load Research Conference 38

39 July 31, 2000 2000 AEIC Load Research Conference 39 Dealing with voluntary curtailments occurring more than three hours before the start of the actual interruption Three occurrences: June 19, 1998; April 26, 1999; July 30, 1999

40 July 31, 2000 2000 AEIC Load Research Conference 40

41 July 31, 2000 2000 AEIC Load Research Conference 41

42 July 31, 2000 2000 AEIC Load Research Conference 42

43 July 31, 2000 2000 AEIC Load Research Conference 43 Shortest Interruption April 3, 199812:52 - 13:05

44 July 31, 2000 2000 AEIC Load Research Conference 44

45 July 31, 2000 2000 AEIC Load Research Conference 45 Longest Interruption April 24, 199912:30 - 20:04

46 July 31, 2000 2000 AEIC Load Research Conference 46

47 July 31, 2000 2000 AEIC Load Research Conference 47 Winter Morning Interruption January 6, 199906:37 - 08:14

48 July 31, 2000 2000 AEIC Load Research Conference 48

49 July 31, 2000 2000 AEIC Load Research Conference 49

50 July 31, 2000 2000 AEIC Load Research Conference 50

51 July 31, 2000 2000 AEIC Load Research Conference 51

52 July 31, 2000 2000 AEIC Load Research Conference 52 Follow-up Analysis Analyze the impact on Individual Customer and IS Class load as a result of third party purchases Focus on impacts associated with new notification system during May 2000 Customer notification includes hourly forecasts of: –Probability of Interruption –Probability of third party purchase –Third party purchase price levels –Duration of purchase