1 Sprint 113 Review / Sprint 114 Planning August 12th, 2013

2 Sprint Resource Pages For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Spri nt+113+Progress+Summary https://developer.connectopensource.org/display/NHINProgress/Spri nt+113+Progress+Summary For next sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Spri nt+114+Progress+Summary https://developer.connectopensource.org/display/NHINProgress/Spri nt+114+Progress+Summary For information on the CONNECT 4.2 release visit: https://developer.connectopensource.org/x/AoBWC https://developer.connectopensource.org/x/AoBWC 2

3 Sprint 113 Summary - Cumulative Flow 3 To Do In Progress QA Done

4 Sprint 113 Summary - Burndown Chart 4

5 Sprint 113 Summary – Sprint Statistics Points committed = 24.5 –Initial points committed – 22.5 –0 ticket was moved to sprint 114 for 0.0 –2 tickets pulled into sprint for 2.0 Points remaining (unclosed) at end of sprint = 0.0 Points completed in sprint (velocity) = 24.5 5

6 Sprint 113 - Proposed Themes Rerun all Release 4.2 Testing on new GA build –Installation testing –Validation testing –Interoperability testing Complete Release 4.2 Documentation Continue working with Healtheway/ CCHIT on certification program readiness –Discussing and addressing final items from updated certification test cases –https://developer.connectopensource.org/display/CONNECTWI KI/Certification+Test+Caseshttps://developer.connectopensource.org/display/CONNECTWI KI/Certification+Test+Cases Final release preparation tasks for Release 4.2 availability Next steps in CI and testing automation improvements 6

7 Sprint 113 - What We are Showing Today Release 4.2 Available Release 4.2 Available –The Release 4.2 Wiki page: https://developer.connectopensource.org/x/AoB WC https://developer.connectopensource.org/x/AoB WC 7

8 Sprint 113 - What We are Showing Today Release 4.2 Final GA Release Testing Release 4.2 Regression Testing –https://developer.connectopensource.org/x/mgBnChttps://developer.connectopensource.org/x/mgBnC Release 4.2 Installation Testing –https://developer.connectopensource.org/x/mABnChttps://developer.connectopensource.org/x/mABnC Release 4.2 Interoperability Testing –https://developer.connectopensource.org/x/EYC6Chttps://developer.connectopensource.org/x/EYC6C –Diagram on next slide The Release 4.2 Testing Wiki page: https://developer.connectopensource.org/x/HgBgC https://developer.connectopensource.org/x/HgBgC The Release 4.2 Testing Summary Wiki page: https://developer.connectopensource.org/x/nABnC https://developer.connectopensource.org/x/nABnC 8

9 Sprint 113 - What We are Showing Today Release 4.2 Interoperability Testing Release 4.2 Interoperability Testing –Release 4.2 interoperability setup –The Release 4.2 Interoperability Testing page: https://developer.connectopensource.org/x/BQCYC https://developer.connectopensource.org/x/BQCYC 9

10 Sprint 113 - What We are Showing Today Support for JAVA 1.6 Release 4.2 – Support for JAVA 1.6 (CONN-350) –Since CONNECT 3.3 JAVA 1.7 has been required –Certain features developed for 3.3/ 4.0 / 4.1 required JAVA 1.7 –Retrofitted these features to run on JAVA 1.6 –Delivers independence between CONNECT upgrades and data center upgrades –Allows implementers to take advantage of enhanced capabilities without being tied to certain infrastructure versions –The JAVA 1.6 Support Design Approach: https://developer.connectopensource.org/x/CQArC https://developer.connectopensource.org/x/CQArC 10

11 Sprint 113 - What We are Showing Today Multiple specification version support Release 4.2 – Multiple specification version enhancement support (CONN- 15 & CONN-46) –Enhanced existing 2010 and 2011 specification support –QD and RD services will be able to determine the specification version for the incoming message in their adapter interfaces –Adopters will be able to instruct the gateway which specific versions of endpoint they wish to target for outgoing messages –Delivers ability to target endpoints based on their use cases, deployment models, and trading partners capabilities –Enhancing multi-spec support (initiating) Design Approach: https://developer.connectopensource.org/x/GoA0C https://developer.connectopensource.org/x/GoA0C –Enhancing multi-spec support (responding) Design Approach: https://developer.connectopensource.org/x/kYDvBw https://developer.connectopensource.org/x/kYDvBw 11

12 Sprint 113 - What We are Showing Today Healtheway Certification Support Healtheway Participation Certification Support –Enhancements made to pass Healtheway/ CCHIT Participant certification testing –Successfully ran all published certification suite test cases (published 7/31/13 the participant certification testing production date, by CCHIT) –Updates made to CONNECT for support of these test cases can be found listed in the 4.2 Release Notes (Bugs Resolved) Test case results Table 1 – https://developer.connectopensource.org/x/JwA4Chttps://developer.connectopensource.org/x/JwA4C Table 2 – https://developer.connectopensource.org/x/IoA7Chttps://developer.connectopensource.org/x/IoA7C Certification - https://developer.connectopensource.org/x/ZIC6Chttps://developer.connectopensource.org/x/ZIC6C 12

13 Sprint 113 - What We are Showing Today Additional Release 4.2 Enhancements Release 4.2 – Adapter Enhancements –PD adapter was updated to include country code in PD response if present in the MPI file (CONN-400) –QD adapter was updated to filter documents correctly based on event codes in the query request (CONN-478) Release 4.2 – Code refinements, build improvements and testing coverage with automation –The CI process was enhanced to include WebLogic and WebSphere Application Servers Performed at code check in time and the code is validated against all 3 application servers –Deliver more stable product with increased code quality through refinements made to release testing suites 13

14 Sprint 113 - What We are Showing Today Custodial Agent and Community Support Working on updates to the CONNECT Roadmap to reflect current needs and industry requirements Other tasks –Partner and Community Support –Ongoing Custodial Agent Duties Product Backlog https://issues.connectopensource.org/secure/VersionBoard.jspa? selectedProjectId=10140 14

15 Sprint 114 - Proposed Themes Support and Improved Testing Next steps in CI and testing automation improvements –Add JBoss to the automated CI process –Build Regression suite Framework for automation –Configuration management via JMX (i.e. Standard/ Entity) –Interoperability/integration test cases updates and enhancements Continue working with Healtheway/ CCHIT on certification program Support community that have begun Healtheway/ CCHIT participant certification testing –Beginning to field support questions for community members actively engaged in certification testing Support community with Release 4.2 deployments 15

16 CONNECT 4 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be August 26 th –CONNECT 4 Blogs and Forum posts –http://www.connectopensource.org/developer- resources/forumshttp://www.connectopensource.org/developer- resources/forums 16

17 Questions and Discussion 17