Presentation is loading. Please wait.

Presentation is loading. Please wait.

SMWG-JAXA April 20071 JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon.

Similar presentations


Presentation on theme: "SMWG-JAXA April 20071 JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon."— Presentation transcript:

1 SMWG-JAXA April 20071 JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi yagi.nobuhiro@jaxa.jp 25.April.2007 Telecon

2 SMWG-JAXA April 20072 1.JAXA SLE-Service Management Status  JAXA is now developping the SLE-SM/UM prototype according Red-1 version (March 2006).  The development of the SLE-SM/UM prototype is scheduled to complete by 11 Sep 2007. 2.JAXA SLE-Transfer Service Status  Up-grade to RAF(911.1-B-2) and F-CLTU(912.1-B-2) is under way.  Up-grading to the RAF & F-CLTU is scheduled to complete by 30 Aug 2007.

3 SMWG-JAXA April 20073 3.Documents  For data-interface testing, - The Draft TEST PLAN FOR JAXA-JPL SLE INTEROPERABILITY TEST was made and sent to JPL on 20 April. - The test plan Includes the SLE transfer services(RAF & F-CLTU) interface testing, because JAXA/Tukuba’s SLE equipment have not conected to JPL - JAXA would like JPL to review the draft test plan.  For Shawdow Track testing, - JAXA is now developping the TEST PLAN FOR JAXA-JPL SHADOW TRACK TESTING. - The development of the TEST PLAN is scheduled to complete by 22 June 2007.

4 SMWG-JAXA April 20074 4.Service Agreement  The Draft Service Agreement was made and sent to JPL on 20 April.  Some parameters need to be defined. ie.JPL RF equipment Characteristic,JAXA spacecraft modulation type:PCM/PSK-PM

5 SMWG-JAXA April 20075 5.Issues to be determined in the near futuer  JAXA proposes to conduct a communication test. -ICMP,SNTP level  Produce ICD level information - selection of the line for Transfer services (ISDN,capacity) - exchange of network infomation ie.IP address - voice communication - security for Service Management message - Email rule for Service Management message (contents, subjects)

6 SMWG-JAXA April 20076 year 2007 month AprilmayjunejulyAugSepOct SLE-SM/UM prototype development with Red-1 SLE-Transfer Service RAFand CLTU up-grade with version-2 Shawdow Track Testing Schedule of JAXA SLE-SM/UM prototype development & testing with JPL (tentative) ▲(11 Sep) data interface testing ▲(30 Aug) data interface testing (1 Oct)▲ Shawdow Track


Download ppt "SMWG-JAXA April 20071 JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon."

Similar presentations


Ads by Google