1 Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR 01.11.2015

2 ESSIP Plan 2015 / Objective FCM052 Objective FCM05 Comprehensive Explanation What is new or has changed since LSSIP 2014 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Links and contacts

3 Comprehensive Explanation ESSIP Plan 2015 / Objective FCM053  Area of applicability: All ECAC  Initial Operational Capability (IOC): 09/2013 Full Operational Capability (FOC): 12/2021  The objective will ensure the improvement of B2B exchanges between local ASM tools and NM  Implementation will provide enhanced NOP capabilities (ADR, DDR2, Flight Plan filling...)

4 What is new or has changed since LSSIP 2014 ESSIP Plan 2015 / Objective FCM054  Scope of the Objective enlarged so as to cover the integration of Airport Operational Plans (new NM10 and APO02 SLoAs).  Compliance date changed so as to address the new scope as defined in the PCP Regulation (12/2021) – but only for the new SLoAS!  Finalisation of SLoAs NM01, 02, 03, 07 and 08

5 Link to European ATM Master Plan ESSIP Plan 2015 / Objective FCM055 Objective FCM05 covers the following SESAR OI steps:  OI Step – [AOM-0202]-Enhanced Real-time Civil-Military Coordination of Airspace Utilisation  OI Step - [AOM-0205]-Modular Temporary Airspace Structures and Reserved Areas  OI Step - [DCB-0102]-Interactive Rolling NOP  OI Step - [DCB-0103-A]-Collaborative NOP for Step 1  OI Step - [IS-0901-A]-SWIM for Step1

6 Most important SLoA(s)  FCM05-ASP01 – Upgrade the automated ASM support system with the capability of AIXM 5.1 B2B data exchange with NM  FCM05-ASP02 – Perform an integration of the automated ASM support systems with the Network  Each SLoA should be fulfilled in accordance with the relevant provisions of the NM B2B Reference Manuals ESSIP Plan 2015 / Objective FCM056

7 Finalisation Criteria and Closed Questions ESSIP Plan 2015 / Objective FCM057 Finalisation criteria:  Contact your subject matter expert to determine the deployment Status for each SloA Closed questions:  Closed Questions have been introduced for this Objective  Statements on Deployment Status should provide answers to Closed Questions

8 ESSIP Report 2014 ESSIP Plan 2015 / Objective FCM058  It is important to note that most of the SLoAs are applicable to the Network Manager (NM) and that all NM-s SLoAs planned for 2014 (5 out of 7) have been implemented according with the plans so can be considered as -Finalised-.

9 Objective Coordinator’s Analysis, recommendations, tips & tricks ESSIP Plan 2015 / Objective FCM059  Ensure that your subject matter expert is involvement once you make your statement.  Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material.  Attention to the applicability to the Military stakeholders as airspace users.  Objective also related to AOM19

10 Links and contacts ESSIP Plan 2015 / Objective FCM0510 Objective Coordinator: Octavian CIOARA +32 2 729 3282 octavian.cioara@eurocontrol.int NMD Objective Expert: Idalina MENDES +32 2 729 9646 idalina.mendes-videira@eurocontrol.int