Waupaca County Highway 5 Year Plan 2013-2017. We build and maintain a quality transportation system for the safety and prosperity of current and future.

Similar presentations


Presentation on theme: "Waupaca County Highway 5 Year Plan 2013-2017. We build and maintain a quality transportation system for the safety and prosperity of current and future."— Presentation transcript:

1 Waupaca County Highway 5 Year Plan 2013-2017

2 We build and maintain a quality transportation system for the safety and prosperity of current and future generations.

3

4 20132013 TYPE OF WORK FY 2013 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT P CTH E -- Badger Street to Mill Street0.33$100,000 3,005 P CTH Y -- CTH I to STH 1562.15$415,000 285 P CTH V -- Portage County to CTH Q3.08$440,000 203 P CTH K -- CTH KK to Kriese Road2.15 $339,100 250 P CTH K -- Kriese Road to CTH B2.91 $219,000 625 P CTH C -- STH 49 to CTH J South4.53$925,000$190,000$220,000 $1,335,000450 *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic

5 20132013 TYPE OF WORK FY 2013 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT C/P CTH T -- CTH D to Collier Road3.09$1,551,000 $58,589$95,411 $1,705,000930 C/P CTH N -- STH 22 to Clark Street0.45$345,000 $215,000 $560,000500 PE CTH I -- CTH Y and Paape Road Intersections0.75$40,000 585 R/W CTH T -- Collier Road to CTH N4.62$180,000 1,135 R/W CTH C -- Bridge over Little Wolf River---$4,000 775 *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic

6 2013 Totals MILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST 24.06$4,000,000$190,000$497,589$310,411$339,100$5,337,100 *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving PEOur goal is 5.0 miles - 0.75 miles RWOur goal is 5.0 miles - 4.62 miles COur goal is 5.0 miles - 3.54 miles POur goal is 17.0 miles - 18.69 miles 2013 Goals 20132013

7 CTH “T” CTH “D” to Collier Rd Construction & Paving Scheduled for 2013 CTH “N” STH 22 to Clark Street Construction & Paving Scheduled for 2013 CTH “V” Portage County to CTH “Q” Paving Scheduled for 2013 CTH “K” CTH “KK” to Kriese Rd Paving Scheduled for 2013 CTH “C” STH 49 to CTH “J” South Paving 2013