Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.

Similar presentations


Presentation on theme: "Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E."— Presentation transcript:

1 Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.

2 Project Background Richard T. Flood Jr., & Sally Elliot Flood Athletic Center Completed in December 2009 Northwest Connecticut Area: 102,000 ft 2 Replacement of Ice rink Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

3 Project Background Function of gymnasium Basketball Court Fitness Center Wrestling Room Ice Rink Offices Locker Room Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

4 Existing Mechanical System (4) Boilers 85% Efficiency (5) Hot Water Unit (26) Hot Water Heating Coil (9) Air Handling Units (2) Energy Recovery Ventilators Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline Mech. Room

5 Existing Mechanical System (1) Ice Rink Ventilating and Dehumidifying Unit With Desiccant Wheel Dehumidification System 100% OA system Prevent water condensation in ice rink Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline Mech. Room

6 Proposed Mechanical System Objective of Proposed Mechanical System Provide economic benefit to the owner Reduce of energy consumption Decrease emission of the system Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

7 Proposed Mechanical System CHP system Feasibility Check Spark Spread = Electricity rate – Gas rate =$11.29/MMBtu System may be inefficient Spark Spread was lower than $12/MMBtu Building does not run 24/7 Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline Electricity – Northeastern Utilities suppliers provide electricity rate of 0.09051/kWh to commercial buildings. Electricity rate =(0.09051/kWh) * (1 kWh / 0.003412 MMBtu) = $26.53/MMBtu Natural gas – Natural gas price was adjusted by the government and it is 14.81 dollar/ 1000 cubic feet. Natural gas rate = 14.81 dollar/ 1000 cubic feet *1.029 = $15.24/ MMBtu Spark Spread = electricity rate – natural gas rate =$26.53/ MMBtu – $15.24/ MMBtu = $11.29/ MMBtu

8 Proposed Mechanical System CHP system Components Prime Mover Generator Heat Recovery Unit Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

9 Proposed Mechanical System Selection of Prime Mover High efficiency Low start-up time Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

10 Proposed Mechanical System Estimation of annual cost and savings BCHP Screening Tool $21,563 / year Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

11 Proposed Mechanical System Emission Reduction of NOx and SOx NOx – 57.6% reduction SOx – 99.1% reduction Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

12 Proposed Mechanical System Ground Heat Source System Location Plenty of ground to utilize as GSHP system Soil Stockbridge Loam Thermal Conductivity = 1.15 Btu/(h*ft*F) Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline GSHP System

13 Proposed Mechanical System Utilize underground temperature Underground temperature is low on summer and high on winter Run with 23.5% propylene glycol and 76.5% water Lower the freezing point to 15 o F Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

14 Proposed Mechanical System 25 Bore holes Vertical Loop System Ground Loop Design $4,900 / year Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

15 Acoustical Breadth Installation of All weather Acoustical tile Acoustiblok reduces approximately 10 dB Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

16 Cost Estimation Combined Heat and Power System Installation Cost = $1,676,211 Annual Savings = $21,563 Payback Period = 50years Ground Source Heat Pump System Installation Cost = $63,900 Annual Savings = $4,900 Payback Period = 13years Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

17 Conclusion Recommendation Inadequacy to install CHP system GSHP is challenging Owner can consider due to the function and religion of school Acoustical tiles are recommended to install after the installation of GSHP system Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline

18 Acknowledgements Special thanks to Faculty - Dr. Bahnfleth - Dr. Freihaut AE Students - Jeff, Devon, Luke, Jeremy, Salisbury School – My high school All my family and grandmother pasted away on March Project Background Existing Mechanical System Proposed Mechanical System CHP System GSHP System Acoustical Breadth Cost Estimation Conclusion Presentation Outline


Download ppt "Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E."

Similar presentations


Ads by Google