1 MaxCell Installation Reports India Amit Dubey MaxCell Market Manager - India

2 Date: December 20, 2009 End User: BSNL Installer: Milliken Venue: Rannikuti to Jadhavpur Exchange Classification: Outside Plant Amit Dubey MaxCell Market Manager - India BSNL (Kolkata, India)

3 Amit Dubey MaxCell Market Manager - India Installation Details 11001)18mm 1) 12mm 1581 x 455621-362 man HP18mm 12mm 9797 2 Man HP10 % 2100(1) 18mm (2) 12mm 190.901 x 905621-385 man HP18mm 12mm 8686 2 Man HP10% 31001) 12mm180.641 x 455621-375 man HP18mm 12mm 7676 2 Man HP6 % 4100Empty178.671 x 455621-355 man HP18mm 12mm 7676 2 Man HP5 % 5100Empty187.331 x 455621-355 man HP18mm 12mm 7575 2 Man HP5 % Sec- tion Pull Length, M Style Time, min OD, mm Final Fill Ratio Sweeps, degrees Conduit ID, mm Existing Cable OD, mm Tension, kgs MaxCell InstallationCable Installation Time, minTension, kgs Date: December 20, 2009 End User: BSNL Installer: Milliken Venue: Rannikuti to Jadhavpur Exchange, Kolkata Classification: Outside Plant 178.67mtrs 107mtrs 187.33 mtrs 190.90mtrs 180.64mtrs these four manholes were in the road and two of them were not traceable One 45 158mtrs Install 158 mtrs in July 2008

4 Amit Dubey MaxCell Market Manager - India Installation Details Date: December 20, 2009 End User: BSNL Installer: Milliken Venue: Rannikuti to Jadhavpur Exchange Kolkata Classification: Outside Plant -Izaz Sir and Mr Lee installed EM 5621-3 MaxCell in 158meters between two manhole assigned one km Ranikutti to Jadhavpur exchange, Kolkata in July 2008, other 5 manholes were located in the center of the road and were sealed with asphalt around the edge. -Due to not opening of the manhole covers trial was pending since last one and half year, then BSNL Kolkata assign this work to an contractor to up r ise the manholes, install the MaxCell and two OF cable s in to MaxCell. It was very busy road so hurdles like permission from municipal corporation, local transport police and lastly contractor was not supportive. -After putting pressure from BSNL corporate office to GM Kolkata at last all five manholes cover up raised in last two months and finally on 16 th to 21srt Dec 09 we installed MaxCell and two 18mm a and 12mm Optical Fiber cable in MaxCell in Ranikutti to Jadhavpur exchange in the presence of DGM(Tx), EE(Tx), SDE and Des successfully.

5 Amit Dubey MaxCell Market Manager - India Installation Details Date: December 20, 2009 End User: BSNL Installer: Milliken Venue: Rannikuti to Jadhavpur Exchange Kolkata Classification: Outside Plant -In one of the man hole contractor inserted number of bamboos in 100mm ID conduit to create problems in trial because his payment was not released. - After removing these bamboos from conduits we tried Roding in available four 100mm conduits to installed rope but not succeed. There were one conduit in which one live12mm cable was though, after getting permission from BSNL NOC, on Sunday we cut the cable and installed EM 5621-3 MaxCell and a rope, using rope again install the same live cable and further installed 18 and 12mm cables in MaxCell successfully. Bamboos inserted by contractors cable pulling trying roding with iron rodder

6 Date: December 20, 2009 End User: BSNL Installer: Milliken Venue: Rannikuti to Jadhavpur Exchange, Kolkata Classification: Outside Plant Thankful to DGM(Tx) and contractor team. Amit Dubey MaxCell Market Manager - India