MaxCell First order Installation Reports MTNL Mumbai Amit Dubey MaxCell Market Manager - India.

Similar presentations


Presentation on theme: "MaxCell First order Installation Reports MTNL Mumbai Amit Dubey MaxCell Market Manager - India."— Presentation transcript:

1 MaxCell First order Installation Reports MTNL Mumbai Amit Dubey MaxCell Market Manager - India

2 Date: 13 th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay Amit Dubey MaxCell Market Manager - India Chembur, MTNL Mumbai Before After MaxCell installation

3 SectionConduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell InstallationsCable InstallationFinal Fill Ratio StyleTime, min Tension, kgs OD, mmTime, min Tension, kgs 1100empty223Straight3 x Man Hand Pull 4 x 12 & 2 x 14mm 454 Man HP 9.7% 2100Empty223Straight3 x Man Hand Pull 2 x 14 & 2 x 18mm 504 Man HP10.4 % 3100Empty223Straight3 x Man Hand Pull 2 x 12mm 254 Man HP2.9 % Remarks:- -This was the first order installation of MaxCell in Chembur, MTNL Mumbai through contractors. - There were four mm empty conduit and have to installed 27 nos. of cables (combination of 12 & 18mm). -There were an hand hole in between manhole. it is 89m from one and 134m from other manhole. Contractor first installed rope in all four conduit. - Successfully installed 3 nos. of EM three cell MaxCell in three of mm conduit while fourth conduit left out for future use. -Deployed 6 cables (2 x 14mm & 4 x 12mm) in two EM MaxCell in first mm conduit. 4 cables (2x 18mm & 2 x 14mm) in second mm conduit. And 2 x 12mm cables in third conduit.. Fourth for future use. - Date: 13 th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay Amit Dubey MaxCell Market Manager - India Installation Results:

4 Date: 13 th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay MaxCell praparation Successful installing cables Amit Dubey MaxCell Market Manager - India Cable Pulling

5 Date: 14 th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL Kandiwali Exchange, Mumbai Classification: Overlay Amit Dubey MaxCell Market Manager - India Kandiwali, MTNL Mumbai Before After MaxCell installation

6 SectionConduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell InstallationsCable InstallationFinal Fill Ratio StyleTime, min Tension, kgs OD, mmTime, min Tension, kgs 1100empty130Straight3 x Man Hand Pull 1 x Man HP 3.2 % Remarks:- -In this starch only one mm conduit was available while apart from two manhole there were 12 & 24 nos. of mm conduit available. - 50m of this stretch was along with bridge while remaining was under the foot path. - We installed 3 nos. of EM MaxCell and further deploy one 18mm cable in one of the cell successfully. -Now there are provision of 8 nos of cable to installed in future. Date: 14 th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Kandiwali Telephone Exchange, Mumbai Classification: Overlay Amit Dubey MaxCell Market Manager - India Installation Results:

7 Date: 14 th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Kandiwali Telephone Exchange, Mumbai Classification: Overlay MaxCell getting enter Amit Dubey MaxCell Market Manager - India Passing through handhole Successful Installed


Download ppt "MaxCell First order Installation Reports MTNL Mumbai Amit Dubey MaxCell Market Manager - India."