MaxCell First order Installation Reports MTNL Mumbai

Similar presentations


Presentation on theme: "MaxCell First order Installation Reports MTNL Mumbai"— Presentation transcript:

1 MaxCell First order Installation Reports MTNL Mumbai
Amit Dubey MaxCell Market Manager - India

2 Chembur, MTNL Mumbai Date: 13th May 2010 End User: MTNL Mumbai
Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay Chembur, MTNL Mumbai After MaxCell installation Before Amit Dubey MaxCell Market Manager - India

3 Existing Cable or sub duct OD mm MaxCell Installations
Date: 13th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay Installation Results: Section Conduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell Installations Cable Installation Final Fill Ratio Style Time, min Tension, kgs OD, mm 1 100 empty 223 Straight 3 x 25 4 Man Hand Pull 4 x 12 & 2 x 14mm 45 4 Man HP 9.7% 2 Empty 2 x 14 & 2 x 18mm 50 10.4 % 3 2 x 12mm 2.9 % Remarks:- This was the first order installation of MaxCell in Chembur, MTNL Mumbai through contractors. There were four mm empty conduit and have to installed 27 nos. of cables (combination of 12 & 18mm). There were an hand hole in between manhole. it is 89m from one and 134m from other manhole. Contractor first installed rope in all four conduit. Successfully installed 3 nos. of EM three cell MaxCell in three of mm conduit while fourth conduit left out for future use. Deployed 6 cables (2 x 14mm & 4 x 12mm) in two EM MaxCell in first mm conduit. 4 cables (2x 18mm & 2 x 14mm) in second mm conduit. And 2 x 12mm cables in third conduit.. Fourth for future use. Amit Dubey MaxCell Market Manager - India

4 Successful installing cables
Date: 13th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay MaxCell praparation Cable Pulling Successful installing cables Amit Dubey MaxCell Market Manager - India

5 Kandiwali, MTNL Mumbai Date: 14th May 2010 End User: MTNL Mumbai
Installer: Milliken Venue: MTNL Kandiwali Exchange, Mumbai Classification: Overlay Kandiwali, MTNL Mumbai After MaxCell installation Before Amit Dubey MaxCell Market Manager - India

6 Existing Cable or sub duct OD mm MaxCell Installations
Date: 14th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Kandiwali Telephone Exchange, Mumbai Classification: Overlay Installation Results: Section Conduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell Installations Cable Installation Final Fill Ratio Style Time, min Tension, kgs OD, mm 1 100 empty 130 Straight 3 x 35 1 Man Hand Pull 1 x 18 15 2 Man HP 3.2 % Remarks:- In this starch only one mm conduit was available while apart from two manhole there were 12 & 24 nos. of mm conduit available. 50m of this stretch was along with bridge while remaining was under the foot path. We installed 3 nos. of EM MaxCell and further deploy one 18mm cable in one of the cell successfully. Now there are provision of 8 nos of cable to installed in future. Amit Dubey MaxCell Market Manager - India

7 Passing through handhole
Date: 14th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Kandiwali Telephone Exchange, Mumbai Classification: Overlay MaxCell getting enter Passing through handhole Successful Installed Amit Dubey MaxCell Market Manager - India