Presentation is loading. Please wait.

Presentation is loading. Please wait.

Summary of Virtual Partners Meetings on EMWIN and Bullet Format Products NWS Partners Meeting June 22, 2010 Kevin J. Schrab, NWS/OCWWS.

Similar presentations


Presentation on theme: "Summary of Virtual Partners Meetings on EMWIN and Bullet Format Products NWS Partners Meeting June 22, 2010 Kevin J. Schrab, NWS/OCWWS."— Presentation transcript:

1 Summary of Virtual Partners Meetings on EMWIN and Bullet Format Products NWS Partners Meeting June 22, 2010 Kevin J. Schrab, NWS/OCWWS

2 6/22/2010Summary of Virtual Partners Meetings2 Virtual Partners Meeting on Bullet Formatted WSW/NPW Experimental Products March 11, 2010 Presented by Carl Gorski (NWS Western Region) 10 Partners attended Discussion and feedback –Partners stated they may pull bullets out to “crawl” them –Right now NWS doesn’t require a specific format in the product, but Partners would like categorical rather than free text format type bullets –Suggestion that bullets stay under the text message character limit (i.e., SMS limited to 160 characters) –Positive feedback on the virtual meeting format

3 6/22/2010Summary of Virtual Partners Meetings3 Virtual Partners Meeting on Bullet Formatted WSW/NPW Experimental Products Updates –Continued to get very positive comments over the winter months about the use of bulleted formatted WSWs and NPWs. A number of Emergency Managers in the DC and surrounding counties were very complementary on how much easier it was to use the bulleted products during their historically heavy snow fall events. –This spring NWS expanded the bulleted experiment to include the Fire Weather Program's Red Flag Warnings. The comment period is from May 12, 2010 to October 29, 2010. The use of the format was limited to those offices already using bulleted WSWs/NPWs and also whether local and regional fire agencies wanted to switch to the new format this fire season. –The Marine program is also looking at converting several of their warning products to an experimental bullet format beginning this fall.

4 6/22/2010Summary of Virtual Partners Meetings4 Virtual Partners Meeting on EMWIN Transition April 15, 2010 Presented by Santos Rodriquez (NWS Telecommunications Operations Center) 47 participants from Emergency Management and Partners communities Gave instructions on transition with GOES-East Discussion and feedback Answered a few questions about the position of GOES-East and GOES-West Asked if whether regional radar images would be available via EMWIN. Answer was yes and more imagery to come

5 6/22/2010Summary of Virtual Partners Meetings5 Virtual Partners Meeting on EMWIN Transition Updates –Transition occurred on April 26, 2010 with no problems. –GOES 12 now positioned at 60 degrees, broadcasting the legacy EMWIN signal for transition benefit to those who still do not have EMWIN N receivers –GOES-13 now online broadcasting the 19.2 kbps signal –User reports are all good –Also now have 19.2kbs Byteblaster servers –In process of migrating towards 19.2 KBS for byteblaster servers to replace slower legacy servers –Cuban Radar composite added with permission from Cuban government for aid to Haiti and other Caribbean nations within the composite radar range –FCC is requesting information on impacts of proposed sharing of the 1675-1710 MHz Frequency Band with wireless broadband systems (see handout)

6 6/22/2010Summary of Virtual Partners Meetings6 Future Virtual Partners Meetings Will continue with topic-based meetings Please suggest topics Would like to discuss the possibility of adding a virtual component to the Summer Partners meeting (during open discussion section later)


Download ppt "Summary of Virtual Partners Meetings on EMWIN and Bullet Format Products NWS Partners Meeting June 22, 2010 Kevin J. Schrab, NWS/OCWWS."

Similar presentations


Ads by Google