CMS FED Testing Update 31-05-2002 M. Noy Imperial College Silicon Group.

Similar presentations


Presentation on theme: "CMS FED Testing Update 31-05-2002 M. Noy Imperial College Silicon Group."— Presentation transcript:

1 CMS FED Testing Update 31-05-2002 M. Noy Imperial College Silicon Group

2 CMS FED Testing Currently: SEQSI LVDS LVTTL DAC Evaluation board UTP Opto- Tx Optical Fibre Opto- Rx I2C master I2C control Coax 8 bit oscilloscope GPIB VME PC LVDS  LVTTL Line driver + (optional) level shift Network I2C slave

3 CMS FED Testing Picture of the DAC evaluation board DAC Line driver UTP out LVTTL data in, from level converter

4 CMS FED Testing Picture of the key link components Opto-Tx Opto-Rx I2C cable Single ended output to scope UTP from DAC/line driver Optical fibre

5 CMS FED Testing DAC scope UTP V out Opto-Tx DAC Evaluation Board Line driver Opto-Rx 101110110101101110110101

6 CMS FED Testing Signal before the link  200mV (V + -V - =400mV ) differential signal with no offset. higher bandwidth  ringing and faster rise/fall time. Time scale is relative to the scope trigger point on all plots.

7 CMS FED Testing Signal after the link Single ended, with offset. No ringing but slower rise/fall times

8 CMS FED Testing Signal noise/jitter after the link Note:no scale on the width of the line. This is an impression of the infinite persistence scope trace => spread unknown. (Measurements are real).

9 CMS FED Testing Rise time, 10% to 90% of full scale.

10 CMS FED Testing Fall time 90% to 10% of full scale

11 CMS FED Testing Linearity: link is being operated in the linear region of the Tx/Rx Settings: x0, x1, x2, x3, x4, x5=0,0,0,0,1 (recommended by CERN) 000 01

12 CMS FED Testing Sample APV25 pair of multiplexed frames with simulated 1 MIP signal

13 CMS FED Testing Multiplexed APV25 header with zero pipeline address 6 start bits pipeline address (16 bits) 2 error bits 2x12x25ns bits =

14 CMS FED Testing Zoom in of the 1 MIP signal upon its pedestal Approx: Pedestal value here is 509 lsbs, 4096 levels in 405mV  0.099mV/lsb 1 MIP  4096/8=512 lsbs  Total signal =570+(405/4096)*(509+512) =570+0.099*1021=671mV

15 CMS FED Testing Summary Have a complete working single fibre, possible to drive 4 with identical signals using the current Opto-Tx. Possible to obtain a further 2 of the 4 channel prototypes from CERN  complete 12 channels could in principle be driven with identical signals. Work is in progress to produce an application specific version of the SEQSI simpler operation longer RAM pipeline clean/synchronous stop from VME possible stepping through

16 Future Work Have 1 (untested) Opto-Rx emulator to drive the analogue stage of the FED directly over copper (I.e. eliminating the optical link) Temperature: have observed significant temperature variation of the signal =>Define the laser temperature stability requirements for testing Verify DAC Linearity: Summer student More thought into a test vectors and their comparison with the FED output CMS FED Testing