Presentation is loading. Please wait.

Presentation is loading. Please wait.

NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)

Similar presentations


Presentation on theme: "NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)"— Presentation transcript:

1 NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)

2 C63.4-2009 SC1 - Oct 2011 PINS approved by C63 ® on 10/22/2010 WG working on revision Expected draft by early 2012 HOT TOPIC

3 C63.4- highlights Remove measurement methods for intentional radiators (clause 13) Revise the measurement method for emissions above 1 GHz Revisit site validation methods above 1 GHz Expand antenna list Revise scrolling H pattern requirements for large screen TV as well as those used as computer monitors Add information on average detectors and review average measurement method using a reduced VBW SC1 - Oct 2011

4 C63.5-2006 SC1 - Oct 2011 PINS on file and approved by C63 ® on 10/2009 WG working on revision Target Date –draft by early 2012 MAJOR CHANGES

5 C63.5- highlights Expand scope to cover new items; including the time domain gating. Mention of ‘reference site’ needs to be clarified that it is the SACS. The uncertainty section on RAM section. Allow calculable dipoles in RAM section. Time domain gating for above 1 GHz. GSCF = RSM. Dipole corrections to free space (50 ohms). Standard gain horns can use measured dimensions for AF. define that the same test site cannot be used for calibrations and product testing. However, at the same site, different areas can be used for either. SC1 - Oct 2011

6 C63.10-2009 SC1 - Oct 2011 PINS on file and approved by C63 ® on 04/20/09 Work is ongoing for next draft Target Date – draft by December 2011 GOOD PROGRESS

7 C63.10- highlights 1. Maintenance items – editorial corrections to C63.10 (2009) 2. 4.2.2, 4.2.3.2.3 - 4.2.3.2.5 – average measurements using Spectrum Analyzers 3. 5.2 – clarification of test sites >1 GHz – site must conform to CISPR 16-1-4 (2010) – 1-18 GHz 4. 5.3.1 – Clarification of test distance for devices operation 18- 40 GHz 5. 6.3 - 6.6 -- to reduce redundancy, clarify maximization of emissions and introduced new alternative procedure for measurement of small transmitters operating above 1 GHz 6. 6.4 – new extrapolation factor for emissions below 30 MHz based on frequency and size of EUT 7. NEW 6.10 – Occupied Bandwidth Measurements – Relative bandwidth testing and 99% power bandwidth testing SC1 - Oct 2011

8 C63.10- highlights 8. New 6.11 – Bandedge Measurements – a number of new procedures depending on regulatory requirement – See Annex L for bandedge requirements Authorized bandedge procedure Relative bandedge procedure Restricted bandedge testing Marker-Delta method 9. New 7.11 – DTS device testing 10. New 7.12 – UNII device testing 10. New 7.13 – Antenna array testing 11. New 7.14 – Procedures for combining emissions from multiple outputs SC1 - Oct 2011

9 C63.10- highlights 12. New 7.15 – FM transmitter in-vehicle testing (4 configurations) Wireless transmission between the FM source and the vehicle antenna. Injection into a vehicle’s wiring system via the cigarette lighter adapter (CLA) socket. Capacitive coupling to a vehicle FM whip antenna, roof top antenna, or embedded glass antenna. Direct connection to a vehicle FM radio antenna input. 13. New 7.16 – Inductive Loop Devices – procedures for testing inductive loop devices operating on frequencies below 100 kHz. 14. 8.0 – Revised test report requirements – deleted reference to 17025 and regulatory reporting requirements – retained only those items needed for documenting compliance test results. 15. New Annex G – guidelines for measurements above 1 GHz 16. New Annex H – guidelines for measurements of broadband emissions 17. New Annex I – ERP/EIRP guidelines 18. New Annex J – Rationale for alternative emission measurements 19. New Annex K – Site considerations for inductive loop devices 20. New Annex L – Bandedge requirements for unlicensed transmitters SC1 - Oct 2011

10 C63.22-2004 SC1 - Oct 2011 PINS inactive Published 2004 need ballot process for re-affirmation NO ACTIVITY

11 C63.23- draft SC1 - Oct 2011 PINS on file and approved by C63 ® on 04/26/05 WG finalized draft Target Date – draft out of SC1 by November 2011 GOOD PROGRESS

12 C63.25- draft SC1 - Oct 2011 PINS on file approved by C63 ® on 10/09/07 WG preparing a draft Additional measurements on TDR done Target Date – draft to SC1 by January 2012 RE-STARTED

13 C63.26- draft SC1 - Oct 2011 PINS on file and approved by C63 ® on 05/27/09 Work is just beginning for this standard Target Date – draft to SC1 by early 2013 MAKING HEADWAY


Download ppt "NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)"

Similar presentations


Ads by Google