1 WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler

2 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 2 Subtasks of SA 1.Source Code Administration 2.Web Page Administration  Contents Management  Web Master 3.Documentations, Newsletter, Technical Report  Documentation  COSMO Newsletter  Technical Reports

3 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 3 Source Code Administration COSMO-Model 3.21: (14.12.06) –Preparations of Ensemble Mode (/EPSCTL/, /TUNING/) –Implementation of last changes for Runge-Kutta dynamical core –Update of the FLake Model –Diagnostic Package for the Latent Heat Nudging –Update of Restart scheme –Splitted file YUPRMEAN to YUPRMASS and YUPRHUMI COSMO-Model 3.22: (24.01.07) –New Version of cloud microphysics ( hydci_pp )

4 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 4 Source Code Administration COSMO-Model 3.23: (30.03.07) –Technical changes and bug fixes –Topographical corrections in the radiation scheme –New treatment of lateral boundaries for moisture variables –Introduced option to calculate volume- and surface integrals over arbitrary cuboid COSMO-Model 3.24: (26.04.07) –New version of cloud microphysics; here: Graupel scheme

5 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 5 Source Code Administration Some more updates for bugfixes and consolidation of the schemes. Now we have: COSMO-Model Version 4.0 –Fully implemented all developments for high resolution (LMK-Project, work at other centers) –Fully implemented all changes for running the model in climate mode (long simulations, updating external parameters, NetCDF,…)

6 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 6 Source Code Administration INT2LM 1.5 (05.07.07; Development Version) –Implementation of the changes for high-resolution runs (LMK- Project) –Started implementation of changes from the climate community (NetCDF, special interpolation procedures) –Implemented possibility for interpolating additional variables (e.g. chemistry variables) INT2LM 1.6 (07.09.07; Development Version) –(First) full implementation of all changes from the climate community Still missing: –Computation of external parameters for topographical corrections in the radiation scheme –Distribution and testing

7 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 7 Web Page Administration The Contents Manager: –Rodica Dumitrache and Cosmin Barbu work together on the Contents Management of the Web Page. –But still, not much updated pages can be seen on the Web (just some minutes) –New pages are developed to present all necessary information for the Priority Projects on the Web Material is gathered from the Project Managers It is edited and formatted in Romania More FTEs will be allocated to Romania therefore (0.3) –Work is delayed, because of several reasons: People are not delivering material People who wanted to write updates, did not have time The Contents Manager are not aggressive enough gathering material

8 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 8 Web Page Administration Technical Administration: –The mirror at CSCS in Manno: (http://cosmo-model.cscs.ch) is working again. –HNMS will upgrade its connection to the web Overall Situation is not satisfying: –How can we speed up the update-process? –Does a Contents Management System help? –If we invest more FTEs, but do not get a better result, we have to apply dramatic measures.

9 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 9 Documentation No work has been done for updating the documentation It is the same story as for the Web: –Writing documentation seems to be a lower priority job –We all are overloaded with other work

10 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 10 COSMO Newsletter No COSMO Newsletter could be published since the last GM Reason: see also last slides The gathered material will not be lost. Even if a printed version will not be available, the single contributions will be put to the Web. The contributions will be „citeable“ Nevertheless: Same procedure as every year: you can submit contributions to the next-next Newsletter

11 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 11 COSMO Technical Report No COSMO Technical Report was published last year NOTE: A COSMO Technical Report is a good possibility for Priority Projects and also for other Work Packages to report about their work in detail!

12 18.-21.09.2007 9th General COSMO Meeting --- Athens, Greece 12 THE END Thank you for your Attention