Presentation is loading. Please wait.

Presentation is loading. Please wait.

ICSE 2011 Implementation Update Aaron Valdez Liane Nakamura Deeksha Malhotra Phase Manager: Max Mueller.

Similar presentations


Presentation on theme: "ICSE 2011 Implementation Update Aaron Valdez Liane Nakamura Deeksha Malhotra Phase Manager: Max Mueller."— Presentation transcript:

1 ICSE 2011 Implementation Update Aaron Valdez Liane Nakamura Deeksha Malhotra Phase Manager: Max Mueller

2 Outline ICSE 2011 Project Overview Primary Requirements/Completed Tasks Project Plan Overview of Architecture Implementation and Test Plan Requirements/Design Cross Reference Demonstration of all primary functionalities

3 ICSE 2011 Website Overview We are making a framework for the International Conference on Software Engineering being held in 2011 in Hawaii. We are using the content management system of Drupal.

4 Primary Requirements/Completed Tasks User Login Forum Comments Basic Navigation (Max) Primary and Secondary Navigation News Reel (Liane) Syndicate (with RSS Feed) Program Events (Aaron) Calendar view with Event data type

5 Primary Requirements/Completed Tasks (cont.) Custom Data Types (Aaron) Types for each event in the Program. Program of Events (Aaron) View of the data types in the form of a Program of Events. Profile (Deeksha) Sample Profile

6 Technical Issues Inability to upload pictures Got help from Bill Cohen from the ICS help desk and from Kari; Wrote on the Drupal forum Still unable to solve the problem We will work on understanding and fixing the problem in the next Implementation phase.

7 Updated Project Plan New Risks Limitations of hosting Drupal on ICS servers Inability to solve a Drupal problem due to our lack of experience Issues that resulted… Blank module page Issues with uploading images

8 Risk Mitigation for the blank module page New Contact: Bill Cohen Director of Computing Support Helped troubleshoot errors Increased PHP memory limit from 16M to 32M Problems with permissions

9 Schedule Update We are on track!

10 Table

11 Architecture Overview

12 Within the Site Hierarchy Module Example of Creating an Event http://omm.ics.uci.edu/~117grp01/

13 Test Plan for Event Test Case 3: Creating an event Purpose: Testing that the webmaster can create an event that will be displayed to all users. Item(s) being tested: This will test that the event page and calendar feature both work correctly. Input Specification: The input is the webmaster’s event information. Output Specification: The output should be that event is visible on the event page. The event should also be visible on the calendar. Test environment needs or special test procedures: N/A Test Results As shown in the image below, the test case passes. Failures detected: None Faults debugged: None Final Test Result The user can successfully create an event.

14 Table that maps the functionality to the Drupal modules needed

15 Website Demonstration http://omm.ics.uci.edu/~117grp01/


Download ppt "ICSE 2011 Implementation Update Aaron Valdez Liane Nakamura Deeksha Malhotra Phase Manager: Max Mueller."

Similar presentations


Ads by Google