1 Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority Office 512-852-7261 Cell 512-563-4891 Rickey.Green@capmetro.org Eighteen years in the Transportation industry: General Railway Signal – Engineering Supply; Federal Railroad Administration – Regulatory; DMJM+Harris Consultant – Transportation Engineering (DART) Capital Metropolitan Transit Authority – Public Transit Agency (Austin, TX) Education: MA – Transportation Management “with a concentration in security management” (American Public University); BS – Multidisciplinary Studies (Rochester Institute of Technology) PMP – Project Management Professional certification

2

3 PRESENTATION OVERVIEW HISTORY HISTORY PROJECT DESCRIPTION PROJECT DESCRIPTION OPERATING METHODOLOGY OPERATING METHODOLOGY SIGNALIZATION SIGNALIZATION

4 CMTA RAIL LINE UPRR RAIL LINE Union Pacific RR LLANO AUSTIN JCT AUSTIN JCT. GIDDINGS 162 Track Miles Crushed Aggregate Cars Shipped = 41,000 UP R.R.

5 Public Referendum November 2004 33 Track Miles 9 Station Platforms Single Track 6 DMU’S Rail Maint. Facility 16,000 Sqr. Feet

6 Downtown Plaza Saltillo MLK, JR. Highland ntown Crestview Burnet Howard Lakeline Leander

7

8 DMU FLEET (6)

9

10 I CTC Signal Project Phased Procurement Process. Design; Material Purchase; Installation; Design Basis Temporal Separation. 18 Control Points 9 Intermediate Signals; 6 Split Point Derails.

11 Signal Instrument House Communications. DCS Interface; Cellular Network; Future Fiber.

12 Typical Quad Gate System

13 Grade Crossing Upgrade Project 70 Public Crossings in Passenger Corridor; Project Cost Approximately $ 5 Million; Phased Procurement Process. Design; Material Purchase; Installation.

14 Grade Crossing Upgrade Project Private Crossings in Passenger Corridor (15); Private Crossing Risk Mitigation. Permanently Close Where Possible; Control Access ; Signalize.

15 Grade Crossing Treatments Capital Metro Is Proactive Approach to Risk Mitigation; Crossing Markings Upgrade; Signage Upgrade; Community Outreach; Operation Lifesaver; Fencing Program.

16 Existing Quiet Zones Crystal Falls Avery Ranch Crestview Wooten Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd

17 Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cedar Park Cedar Quiet Zone BMC BMC Brushy Creek Brushy Creek Park St. Park St. Discovery Blvd. Discovery Blvd. FM 1431 FM 1431 New Hope Rd. New Hope Rd. Blockhouse Rd. Blockhouse Rd.

18 Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Phase 4 CMTA PH-4 Quiet Zone Gracy Farm Gracy Farm MOPAC MOPAC Adelphi Adelphi Oak Creek Oak Creek Mc Neil Dr. Mc Neil Dr. Mc Neil Merrill Town Mc Neil Merrill Town Mc Neil Round Rock Mc Neil Round Rock

19 Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cherry Wood Cherry Wood Quiet Zone IH -35 @ 38 ½ ST. IH -35 @ 38 ½ ST. Wilshire Blvd. Wilshire Blvd. 38 ½ ST 38 ½ ST Cherry Wood Cherry Wood Manor Rd. Manor Rd. MLK Blvd. MLK Blvd. 12 th ST. 12 th ST. Rosewood Ave.Rosewood Ave. Webberville Rd.Webberville Rd.

20 Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cherry Wood Quiet Zone 7 th ST. 7 th ST. Pedernales ST. Pedernales ST. Robert Martinez Robert Martinez Chicon ST. Chicon ST. Comal ST. Comal ST. Navasota ST. Navasota ST. Waller ST.Waller ST. IH-35 4 th ST.IH-35 4 th ST.

21 Final Quiet Zone Map Crystal Falls Avery Ranch Crestview Wooten Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cherry Wood Cedar Park Phase 4

22 Final Quiet Zone Map Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Quiet Zone Establishment Jurisdictional Authorities Jurisdictional Authorities Board Approval (ILA’s) Board Approval (ILA’s) City of Austin City of Austin Design SSM Design SSM Coordination FRA Coordination FRA Extend Current Zones Extend Current Zones

23 Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Community Outreach