1 DREAM VISAYAS May – June Report and 3 rd Quarter Plan CEDPR – Community Equity, Development, Peace and Resiliency Building TEAM

2 Participated in the Peer Evaluation in Barangays Puertobello and Tabgas (with AA, PKKK and Pagtambayayong Foundation), Municipality of Culasi (WEDPro) and Batayan Island (FARDEC) Attended regular Barangay Council sessions Cash for work + Gardening + HH food security – Barangay Puertobello (100 families) – Barangay Sherwood (100 families) – Barangay Tabgas (100 families) I. Social preparation

3 Courtesy visit and meeting with Mayor and Key Officials (Estancia, Merida and Albuera) - (MPDO, MSWD, MLGOO, MDRRMO, etc) Data Gathering (Municipal Profile, CLUP and MDP) Conducted Project Orientation to 7 partner barangays I. Social preparation BarangayMaleFemaleTotalVariane Puertobello, Merida72532 Sherwood, Albuera171835 Tabgas, Albuera141933 Jolog125466 Loguingot143044 Bayas142337 Manipulon121931 9018827868 32%68% 32%

4 Trained 42 Local Facilitators in 2 Area (Estancia and Leyte) Conducted Regular Local-Faci meetings Materials development – for the LGS Conducted Trainer's Training for Local Facilitators on PRA- BDP and DRR-CCA. MaleFemaleTotalVariance Estancia, Iloilo61723 Leyte81119 Total1428427 Gender Percentage33%67% 20% II. Capacity building

5 Held a 3-day seminar on Local Governance and Disaster Risk Reduction & Climate Change Adaptation for Barangay Development Council members in 3 partner barangays BarangayMaleFemaleTotal Bayas, Estancia121830 Manipulon, Estancia102030 Puertobello, Merida163248 Sherwood, Albuera152237 Tabgas, Albuera162339 Total69115184 Gender Percentage38%63% II. Capacity building

6 Continuing Psychosocial Support for children in Leyte Tabgas Elementary School, Albuera Sherwood Elementary School, Albuera Barangay Puertobello, Merida Barangay San Juan, Ormoc City Sitio Cantelong Ormoc City Plaza (fiesta celebration) III. Psychosocial Support Services

7 Attended UNOCHA Coordinative meeting and workshop in Iloilo City and Roxas City Meeting with PWD’s Municipal Federation in Estancia III. Networking and Coalition Building

8 “Mainstreaming Persons with Disabilities (PwDs) after Super Typhoon Haiyan” JDC - American Jewish Joint Distribution Committee

9 JDC Project Facilitated the area visit and PWD consultation of Maya from AJ-JDC to Bayas and Manipulon Initial orientation and profiling of PWDs in Municipality of Pres. Roxas (already covered 3 brgys.- Madulano, Sangkal, and Pandan) Consultation and data validation of PWDs in 4 partner brgys. in Estancia (Bayas, Manipulon, Jolog and Loguingot) -Explored partnership with ADPI-CBM in PWDs assessment and validation Facilitated JDC’s Regional Director’s Visit (Mandy) with Ate Belle

10 Gaps Project Orientation (municipal level) Final inventory of PWDs and their appropriate assistive device/s

11 Plan/Schedule: July – September 2014 AreaPRA- PCVABDPFacilitators (2 faci/Sector) Leyte Puertobello, Merida July 15-17Aug. 5-7Sano, Jhames, Lisbeth, Flong Sherwood, AlbueraJuly 12-14Aug. 1-3Sano, Jhames, Lisbeth, Flong Tabgas,July 19-21Aug. 8-10Sano, Jhames, Lisbeth, Flong Iloilo BayasJuly 22-24Aug. 5-7Regine, Andrea, Anne, Che ManipulonJuly 25-27Aug. 11-13Regine, Andrea, Anne, Che LoguingotJuly 29-31Aug. 14-16Regine, Andrea, Anne, Che JologAug. 1-3Aug. 18-20Regine, Andrea, Anne, Che

12 AA Phase II Project Orientation (Municipal Level) Writeshop (September) BDP Packaging and Publishing (September – November 2014) Barangay Assembly (September/November) – 3 Barangays Barangay Contingency Planning (September/November) – 3 Barangays Plan/Schedule: July – September 2014

13 For JDC Project (July –August 2014) Municipal level and barangay orientation and profiling of remaining 3 partner brgys. in Municipality of Pres. Roxas (already covered 3 brgys.- Madulano, Sangkal, and Pandan) Re-validation of PWDs in 4 partner brgys. in Estancia (Bayas, Manipulon, Jolog and Loguingot) -Meet and tap ADPI-CBM for PWDs for partnership Finalization of the identification of the Assistive Devices for the PWDs Canvassing and Purchasing of the Assistive Devices Medical Mission/Services and Turn Over of Assistive Devices for the PWD

14 Reflection: Sa panahon sa kalisod og kalibog, kapot lang og ayaw pagbiya sa panglantaw: Kaangayan, Kalambuan, Kalinaw… Adventure and excitement in working for community development Time management vs activities Building self-confidence is our challenge! Eat because the journey is too long. (maong daghan seafoods :D ) Language barrier. Sink or swim!!!! Lisod magpaniwang kung daghan pagkaon nga atubang! :D You cant find the real you when you keep on staying in your comfort zone, gawas pud panagsa.

15 Daghang Salamat!