Presentation is loading. Please wait.

Presentation is loading. Please wait.

Village of Palmetto Bay

Similar presentations


Presentation on theme: "Village of Palmetto Bay"— Presentation transcript:

1 Village of Palmetto Bay
Downtown Redevelopment -Traffic Study Presentation March 16, 2015

2 Projected South Dade Growth
Main North/South Arterial Roadways Miami-Dade County’s Planning Dept. projects population to increase by 43% by the year 2030 South Dade will grow by 79% from 429,000 to 766,000 residents Employment in South Dade will only increase by 37% Future transit options are imperative to mitigate the effects of the anticipated growth, and the limited local employment options. Legend: US Fla. Turnpike

3 Projected South Dade Growth
Miami-Dade County projects population to increase by 43% by the year 2030 South Dade will grow by 79% from 429,000 to 766,000 residents Employment growth will only increase by 37% therefore transit considerations for the future are important

4 Village of Palmetto Planned Growth
Figure A RESIDENTIAL GROWTH PROJECTIONS: Miami-Dade County land use map allows 17,130 units Palmetto Bay currently allows 4,317 units (Figure A) Market study projects 1,200-1,700 will be absorbed or captured in the Downtown Area over a 10-year period with a market rate of $250-$350,000.

5 Village of Palmetto Planned Growth
Figure B COMMERCIAL DEVELOPMENT PROJECTIONS: Current Zoning allows for 6,436,988 SF of commercial development in the FT&I (Figure B) Market Study projects 135,000 to 270,000 SF of office space and an additional 110,000 SF of retail space in the downtown area.

6 TRAFFIC STUDY PRESENTATION Marlin Engineering, Inc. Mr
TRAFFIC STUDY PRESENTATION Marlin Engineering, Inc. Mr. James Spinks, III, PE, PTOE

7 Traffic Impact Analysis for
Downtown Redevelopment

8 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
DRTF Vision DRTF Vision: To redevelop Palmetto Bay’s downtown district into a vibrant and inviting work-live-play community. DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

9 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
project description Three (3) Phases Five Districts 6,641 Multi-family Residential Units 1,566,547 square feet Retail/Office DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

10 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
introduction Study Purpose: The purpose of this study was to document the results of the Traffic Impact Analysis for the DOWNTOWN REDEVELOMPENT and determine if adequate road capacity is available to support the future project’s demand. DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

11 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
study methodology Data Collection (TMCs & Approach Counts) Existing Conditions Analysis (Intersections/Segments) Future Traffic Projections (2025, 2035 & 2045) Future Total Traffic Analysis (Intersections/Segments) Future without DRTF project Future with DRTF project Traffic Circulation & Access Review Recommendations DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

12 existing conditions analysis
2014 Peak Hour Intersection Conditions Intersection Peak Hour Overall Level of Service LOS Delay (secs.) A.M. MID. P.M. A.M SW 97th Avenue at SW 174th Street (Unsignalized)* A 8.6 8.8 9.2 SW 97th Avenue at US-1 at Evergreen Street (Signalized) F C 97.7 29.7 35.0 SW 97th Avenue at Hibiscus Street (Unsignalized)* B 10.0 9.7 10.2 SW 97th Avenue at SW 180th Street (Unsignalized)* 14.3 11.6 12.9 SW 97th Avenue at E Indigo Street (Unsignalized)* 10.1 10.8 SW 97th Avenue at SW 181st Terrace (Unsignalized)* 14.6 12.2 13.7 SW 97th Avenue at SW 182nd Street (Unsignalized)* 14.0 11.4 13.0 SW 97th Avenue at SW 183rd Street (Unsignalized)* 12.0 15.8 SW 97th Avenue at SW 184th Street (Signalized) 32.5 29.0 32.6 SW 184th Street and SW 95th Court (Unsignalized)* D 22.6 17.3 30.2 US-1 at SW 184th Street (Signalized) 54.2 46.5 53.5 US-1 at Wayne Avenue (Unsignalized)* 70.2 34.6 59.7 US-1 at E Indigo Street (Unsignalized)* 185.0 111.5 105.8 *Overall Intersection LOS not provided for two-way stop-controlled Intersections. The worst minor street movement is Indicated. DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

13 future traffic projections
Future Background Intersection and Segment Conditions w/o SW 95th Ave. Peak Hour Overall Level of Service Intersection 2025 Background LOS Delay (secs.) A.M. MID. P.M. SW 97th Avenue at US-1 at Evergreen Street (Signalized) F C D 138.7 28.4 38.9 US-1 at Wayne Avenue (Unsignalized)* E 91.1 41.5 79.7 US-1 at E Indigo Street (Unsignalized)* 262.9 140.5 143.4 2035 Background SW 97th Avenue at US-1 at Evergreen Street (Signalized) 166.8 29.3 41.8 115.6 49.5 105.3 358.0 172.0 188.6 2045 Background 196.7 31.3 44.7 158.3 63.1 153.0 531.5 222.1 265.6 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

14 future traffic projections
Future Background Intersection and Segment Conditions w/ SW 95th Ave. Peak Hour Overall Level of Service Intersection 2025 Background (Balance) LOS Delay (secs.) A.M. MID. P.M. A.M SW 184th Street and SW 95th Avenue (Unsignalized)* F C 115.5 18.8 179.7 US-1 at Wayne Avenue (Unsignalized)* E 85.3 40.3 78.3 US-1 at E Indigo Street (Unsignalized)* 271.0 139.0 141.3 2035 Background (Balance) 201.6 21.1 308.1 123.9 51.0 104.0 357.3 168.4 190.5 2045 Background (Balance) SW 97th Avenue at US-1 at Evergreen Street (Signalized) 97.5 23.3 29.8 371.8 24.3 511.4 US-1 at SW 184th Street (Signalized) 84.5 66.2 75.4 158.8 64.6 155.5 549.8 225.5 264.8 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

15 future traffic projections
Future Background Conditions w/o the proposed SW 95th Ave. Link Future Background Conditions w/ the proposed SW 95th Ave. Link DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

16 future traffic projections
Sensitivity Analysis Before Reduction After Reduction % Difference Phase 1 CBD Core District Total Units 1650 1320 20% Total ksf 132.0 0% Phase 2 Central Mixed Use District 745 53.426 Phase 3 Perimeter District 600 450 25% 268.86 North Mixed District 550 US 1 Island District 3096 2324 TOTAL 6641 5389 19% 1, DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

17 future traffic projections
Trip Generation PHASE 1 CBD CORE DISTRICT A.M. MID. - P.M. TOTAL UNITS TOTAL KSF TOTAL TRIPS 1,320 132 544 876 PHASE 2 CENTRAL MIXED USE DISTRICT 745 53.426 254 316 PHASE 3 PERIMETER DISTRICT 450 268.86 529 673 NORTH MIXED USE DISTRICT 550 482 505 US 1 ISLAND DISTRICT 2324 1506 1621 5,389 3316 3992 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

18 future traffic projections
Future Total Traffic Intersection and Segment Conditions Peak Hour Overall Level of Service Intersection 2025 Total Traffic LOS Delay (secs.) A.M. MID. P.M. A.M SW 97th Avenue at US-1 at Evergreen Street (Signalized) F C D 83.1 30.0 39.9 SW 184th Street and SW 95th Avenue (Unsignalized)* E 312.9 38.3 779.3 US-1 at Wayne Avenue (Unsignalized)* 96.4 41.4 82.2 US-1 at E Indigo Street (Unsignalized)* Error 644.3 2035 Total Traffic 111.6 35.0 44.3 588.7 61.2 US-1 at SW 184th Street (Signalized) 87.7 73.6 85.3 241.2 180.0 804.0 2045 Total Traffic 205.3 50.3 68.4 SW 97th Avenue at SW 184th Street (Signalized) 49.5 38.8 102.4 579.1 249.3 210.9 202.2 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

19 future total traffic analysis
Suggested Improvements US-1 at SW 184th Street Add EB thru, left-turn and right-turn lane Add WB thru and right-turn lane Add NB right-turn lane Add SB dual right-turn lane US-1 at Indigo Street Install signal US-1 at Wayne Street US-1 at Evergreen/97th Ave Add EB dual right-turn lanes Add NB left-turn, thru lane and free-flow right-turn lane Add SB thru lane SW 184th Street at SW 95th Ave Install signal SW 184th Street at SW 97th Ave Add EB and WB thru lane DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

20 future total traffic analysis
Future Total Traffic Intersection and Transportation Corridor Segment Conditions w/intersection improvements 2045 Total Traffic Intersection Peak Hour Overall Level of Service LOS Delay (secs.) A.M. MID. P.M. A.M US-1 at SW 184th Street (Signalized) F E 89.6 58.8 67.4 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

21 future traffic projections
Future Total Traffic Conditions Future Total Traffic Conditions w/intersection improvements DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

22 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
circulation & access review Based on preliminary site plans and renderings, the following observations were found: Delivery and service trucks can easily access the site and conveniently circulate to and from loading areas. Vehicular circulation patterns are efficient, safe and clearly understood. Pedestrian-vehicular conflicts within the proposed site are minimal and at low speeds and volumes. Internal pedestrian walkways are safe and convenient between the sites. Emergency vehicles have adequate access to all buildings. Interconnectivity between the project sites is provided. DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

23 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
summary of recommendations US-1 at SW 184th Street Add EB thru, left-turn and right-turn lane Add WB thru and right-turn lane Add NB right-turn lane Add SB dual right-turn lane US-1 at Indigo Street Install signal US-1 at Wayne Street US-1 at Evergreen/97th Ave Add EB dual right-turn lanes Add NB left-turn, thru lane and free-flow right-turn lane Add SB thru lane SW 184th Street at SW 95th Ave Install signal SW 184th Street at SW 97th Ave Add EB and WB thru lane Secondary Recommendations: Installation of on-site bicycle racks or parking stations Provide transit information stations within the site including route schedules and maps Provide other transit-oriented amenities Design/construct the site in a bicycle/pedestrian - and transit-friendly fashion DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

24 DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis
QUESTIONS DOWNTOWN REDEVELOPMENT | Traffic Impact Analysis

25 Downtown Redevelopment Next Steps
Vision Plan Concurrency Report Architecture & Landscape Design Criteria Branding/ Marketing/ Communications Plan Franjo Road Survey Franjo Road Modifications Regulating Plan Zoning Code Update Impact Fee Schedule Capital Improvement Strategies North Business District

26 Thank you for your time and attention