Presentation is loading. Please wait.

Presentation is loading. Please wait.

OPERATIONAL 2-H THUNDERSTORM GUIDANCE FCSTS TO 24 HRS ON 20-KM GRID JESS CHARBA FRED SAMPLATSKY METEOROLOGICAL DEVELOPMENT LABORATORY OST / NWS / NOAA.

Similar presentations


Presentation on theme: "OPERATIONAL 2-H THUNDERSTORM GUIDANCE FCSTS TO 24 HRS ON 20-KM GRID JESS CHARBA FRED SAMPLATSKY METEOROLOGICAL DEVELOPMENT LABORATORY OST / NWS / NOAA."— Presentation transcript:

1 OPERATIONAL 2-H THUNDERSTORM GUIDANCE FCSTS TO 24 HRS ON 20-KM GRID JESS CHARBA FRED SAMPLATSKY METEOROLOGICAL DEVELOPMENT LABORATORY OST / NWS / NOAA Details = http://ams.confex.com/ams/pdfpapers/154173.pdf

2 OUTLINE TSTM FCST PRODUCTS STATISTICAL MODEL CASE STUDIES FCST PERFORMANCE SCORES OPERATIONAL ASPECTS COMMENTS

3 TSTM FCST PRODUCTS 2- H PROB. AND CAT. FCSTS TO 25 HRS HOURLY ISSUANCES 20-KM GRID (NDFD GRID COMPATIBLE) CONUS COVERAGE TAILORED FOR AVIATION APPL.

4 STATISTICAL MODEL REGIONALIZED REGRESSION EQUATIONS ON 20-KM GRID MULTIPLE PREDICTOR INPUTS REGIONS

5 PREDICTOR INPUTS CURRENT CTG LIGHTNING STRIKES CURRENT RADAR REFLECTIVITY CURRENT SURFACE OBS GFS MOS THUNDERSTORM PROB. GFS OUTPUT (SUPPLEMENTAL) THUNDERSTORM CLIMATOLOGY TOPOGRAPHY

6 DISCRETE AND OVERLAPPING REGIONS 1 2 3 4 5 6 7 8 9 10 11 12 13

7 DISCRETE REGIONS OVERLAPPING REGIONS & BOUNDARY SMOOTHING 9-H TSTM PROB (%) FROM 0900 UTC 18 MAR 2008

8 OVERLAP REGIONS (OVLP) AND BOUND. SMOOTHING (BS) HAD NO AFFECT ON SKILL

9 FORECAST PERFORMANCE CASE STUDIES CASE STUDIES FROM 2008 FROM 2008

10 6-H PROB (%) FROM 15Z3-H PROB (%) FROM 18Z NO. LTG STRK 19-21Z 8 JUNE 2008

11 8-9 JUNE 2008 9-H PROB (%) FROM 15Z3-H PROB (%) FROM 21Z NO. LTG STRK 22-00Z

12 9 JUNE 2008 6-H PROB (%) FROM 03Z3-H PROB (%) FROM 06Z NO. LTG STRK 07-09Z

13 1 SEPTEMBER 2008 3-H PROB (%) FROM 12ZNO. LTG STRK 13-15Z RADAR EST. PRECIP (”) 12-18Z X HUR. GUSTAV

14 FORECAST PERFORMANCE SCORES FROM 0900 UTC CYC. SCORES FROM 0900 UTC CYC. FROM 2007-08 FROM 2007-08

15 PROBABILITY FORECASTS 0900 UTC 2007-08

16 CATEGORICAL FORECASTS 0900 UTC 2007-08

17 OPERATIONAL ASPECTS 24 CYCLES DAILY (YEAR ROUND) AVAILABLE TO ENTIRE WEATHER ENTERPRISE AND WORLD WIDE WEB PRODUCTS TAILORED BY INDIVIDUAL USERS

18 LAMP – CCFP HYBRID PRODUCT

19 COMMENTS LAMP THUNDERSTORM PROGRAM FULLY IMPLEMENTED PRODUCTS WELL RECEIVED, ESP. BY AVIATION WEATHER USERS

20 THE END


Download ppt "OPERATIONAL 2-H THUNDERSTORM GUIDANCE FCSTS TO 24 HRS ON 20-KM GRID JESS CHARBA FRED SAMPLATSKY METEOROLOGICAL DEVELOPMENT LABORATORY OST / NWS / NOAA."

Similar presentations


Ads by Google