Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP7 - Small scale mockup Status 3rd Review Meeting Cartif-Brussels 17/12/2014 Gorenje d.d., Sašo Vinkovič, Mihael Bračko.

Similar presentations


Presentation on theme: "WP7 - Small scale mockup Status 3rd Review Meeting Cartif-Brussels 17/12/2014 Gorenje d.d., Sašo Vinkovič, Mihael Bračko."— Presentation transcript:

1 WP7 - Small scale mockup Status 3rd Review Meeting Cartif-Brussels 17/12/2014 Gorenje d.d., Sašo Vinkovič, Mihael Bračko

2 Submitted deliverables  D7.1 - Report on mockup installation [M15] ◦ Report on mockup installation: A document containing the list of all working components and their assembling peculiarities, includes a list of part that needed to be re-considered accompanied with the motivations and changes done.  D7.2 - Report on options validation [M20] ◦ Report on options validation: An analysis of the options considered in T7.2 on the light od the carried out experiments.  D7.3 - Report on validated communication protocols and interfaces boards [M23] ◦ Report on validated communication protocols and interfaces boards: Document containing the validation methodology and the corresponding results.

3 Forthcoming deliverables  D7.4 - Library of recipes and templates of basic scenarios ◦ Library of recipes and templates of basic scenarios: A software library containing a list of developed recipes for different scenarios  D7.5 - Report on collected data with corresponding analysis ◦ Report on collected data with corresponding analysis: A detailed document containing all the collected data accompanied by all the analysis e performances accomplished  D7.6 – Report on all the stress tests ◦ Report on all the stress tests: A detailed document on all the stress-tests done accompanied by a complete description on where/when the system maintained its usability and where/when not

4 WP7 Timeline & Deadlines Project year YEAR 1YEAR 2YEAR 3 Project month 123456789 10101 1212 1313 1414 1515 1616 1717 1818 1919 2020 21212 2323 2424 2525 2626 2727 2828 2929 3030 Year 2012201320142015 Month1 1212 123456789 10101 1212 123456789 10101 1212 1234 WP7 T7.1 T7.2 T7.3 T7.4 T7.5 D7.1 R D7.2 R D7.3 R D7.4 R D7.5 R D7.6 R MS 6 R MS 8 R Today

5 Testing the non branded solution  Before the appliances were sent to Cartif, both, the branded solution and the non branded solution were extensively tested in our laboratories.  The correctness of communication was extensively tested over the mockup‘s web page. A sequence of requests was sent to the web site, each time the response was observed if comply with our expectations.  After initial problems, a high level of correct responses was achieved.

6 Testing the branded solution  The correctness and speed of communication tests for the branded solution (refrigerator) were performed, using a branded solution home server and it‘s implemented web methods.  A series of tests for different commands were performed, each time with some hundreds of repeats.  Results are comparable with the results, that were obtained in our laboratories.  The response time is a little bit longer.

7 Real world scenarios and recipes  A set of real world scenarios is being built.  One of them will base on the „two days in real life“ experiment, which is described in D7.3. and will take place shortly  Working on a collection of basic recipes, derived from a set of real world sample scenarios.  Basic recipes represents an entry set for the Social&Smart facility, where basic recipes will be refined and optimized.  Afterwards a library of optimized recipes will be established as a basis for further investigation.

8 Sample: savings with refrigerator (1)  Scenario: during the low energy price period (from 10pm to 6am), a lower temperature should be set for the freezing compartment, to store the energy. During the higher energy price period the temperature should raise.  recipe: ◦ 10pm start the SuperFreeze mode (around -35°C) ◦ 6am stop the SuperFreeze mode (and operate between -24°C and -16°C)  web service calls (.NET methods): ◦ HRCommand("set", "G87C952FDX", "SUPERFREEZE_PROFILE", "ON"); ◦ HRCommand("set", "G87C952FDX", "SUPERFREEZE_PROFILE", "OFF");

9 Sample: savings with refrigerator (2)  Derived XML structure: (according to the D7.3) Refrigerator Gorenje G87C952FDX super_freeze RW 22:00 ON wait RW 480 super_freeze RW OFF

10 Thank you!


Download ppt "WP7 - Small scale mockup Status 3rd Review Meeting Cartif-Brussels 17/12/2014 Gorenje d.d., Sašo Vinkovič, Mihael Bračko."

Similar presentations


Ads by Google