Presentation is loading. Please wait.

Presentation is loading. Please wait.

ANNUAL REPORT 2011. Monitoring Reports 2011 Monitoring Reports 2011  Every month SSD is required to send a monitoring data report to the State Water.

Similar presentations


Presentation on theme: "ANNUAL REPORT 2011. Monitoring Reports 2011 Monitoring Reports 2011  Every month SSD is required to send a monitoring data report to the State Water."— Presentation transcript:

1 ANNUAL REPORT 2011

2 Monitoring Reports 2011 Monitoring Reports 2011  Every month SSD is required to send a monitoring data report to the State Water Resources Control Board (SWRCB) with data submitted such as: Total Coliform Total Coliform Turbidity Turbidity Biochemical Oxygen Demand Biochemical Oxygen Demand  Most of SSD influent and effluent water analysis are performed by Fruit Growers Laboratory. The remaining are conducted in-house by staff.  The submitted data has to be within the perimeters determined by EPA and regulated by the SWRCB.

3 Yearly Report Once a year a compilation of monthly data and additional tests are performed and submitted to the State Regional Water Quality Control Board. Once a year a compilation of monthly data and additional tests are performed and submitted to the State Regional Water Quality Control Board. The list of reporting information contains laboratory analysis for a variety of possible pollutants such as Cyanide, Lead, Mercury, Zinc to name a few. The list of reporting information contains laboratory analysis for a variety of possible pollutants such as Cyanide, Lead, Mercury, Zinc to name a few.

4

5

6

7

8

9

10

11

12

13 Collection System Maintenance and Renovation Program Objective: To reduce sanitary overflows, increase system reliability, optimize service life of collection system components, plan for facility replacement and educate public on importance of maintaining private laterals. To reduce sanitary overflows, increase system reliability, optimize service life of collection system components, plan for facility replacement and educate public on importance of maintaining private laterals.

14 Goals Short Term Continue systematic cleaning and closed circuit televising and repair problem areas if found. Continue systematic cleaning and closed circuit televising and repair problem areas if found. As needed, locate, raise, and repair District manholes and cleanouts. As needed, locate, raise, and repair District manholes and cleanouts. Update GIS to reflect maintenance work as well as owner information. Update GIS to reflect maintenance work as well as owner information. Update District Atlas. Update District Atlas. As system televised, update property connection data for future reference. As system televised, update property connection data for future reference.

15 Goals Long Term Repair collection system mainlines if problems found by means of point repair or slip-lining of collection mainline.Repair collection system mainlines if problems found by means of point repair or slip-lining of collection mainline. Install SCADA for the District’s lift station.Install SCADA for the District’s lift station. To have the collection system in a state of operation where only minor repairs are needed.To have the collection system in a state of operation where only minor repairs are needed. To continue to bring property owners sewer service who are currently on septic systems for their sanitary needs.To continue to bring property owners sewer service who are currently on septic systems for their sanitary needs. Continue to stay abreast of future reclamation needs in conjunction with local water district.Continue to stay abreast of future reclamation needs in conjunction with local water district.

16 Actions Completed 2011 In 2011, approx. 15,000 feet of collection mainline was cleaned and inspected by means of closed circuit televising equipment. In 2011, approx. 15,000 feet of collection mainline was cleaned and inspected by means of closed circuit televising equipment. Routine lift station monitoring and maintenance. Routine lift station monitoring and maintenance. Established Geographic Information System (GIS) for District Collection System. Updates for property owners and maintenance information are still needed. Established Geographic Information System (GIS) for District Collection System. Updates for property owners and maintenance information are still needed. Spent approx. $45k on repairs to collection system which included manhole adjustments, pipeline repair and engineering costs. Spent approx. $45k on repairs to collection system which included manhole adjustments, pipeline repair and engineering costs. Worked with engineers and planners to raise or lower manholes as part of the Summerland Beautification project on Lillie Avenue and Ortega Hill Road. Worked with engineers and planners to raise or lower manholes as part of the Summerland Beautification project on Lillie Avenue and Ortega Hill Road. Pacifica Graduate Institute was connected to District’s sewer. Project consist of a lift station, force main and private lateral. Pacifica Graduate Institute was connected to District’s sewer. Project consist of a lift station, force main and private lateral.


Download ppt "ANNUAL REPORT 2011. Monitoring Reports 2011 Monitoring Reports 2011  Every month SSD is required to send a monitoring data report to the State Water."

Similar presentations


Ads by Google