Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements.

Similar presentations


Presentation on theme: "Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements."— Presentation transcript:

1 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Timing Outline System Concept Review Requirements Personnel Engineering requirements Interfaces Alternatives Test plan Preliminary Design Review Block diagram Quality control and reliability Safety hazards

2 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Requirements Timing triggers are sent to devices to synch acquistions and measurements down the beamline Triggers are synched to the RF clock Input timing patterns (PNET SLCNET) arrive at 360 Hz, 1/120 sec in advance of when they are executed Late updates (during 1/120 sec prior to execution), for eg, MPS status updates, are also accepted Pnet pattern does not include everything. Eg. EPICS timestamp, LCLS MPS rate-limit must be appended on.

3 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Personnel Customers = Patrick Krejcik + Paul Emma need timing control system thru BC1 by Dec 06 Hardware = Dave Brown, COTS products Software = Dayle Kotturi

4 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Engineering Requirements As per requirements slide !?

5 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Interfaces PNET to LCLS MPG 128 bit pattern @ 360 Hz including PP, YY, incl/excl mask and a 4 bit countdown to pulse id rollover LCLS MPG to EVG MPS to LCLS MPG EVG to EVRs EVRs to EVR transition modules EVR transition modules to devices

6 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Alternatives PNET SLCNET is unique to SLAC. No VME COTS modules exist. VME PNET Receiver had to be built and device driver written to meet Controls Group VME standard Given VME PNET Receiver, COTS products could then be used to propagate the timing info to devices. To take advantage of existing hardware modules and EPICS software, we chose to follow SLS and Diamond

7 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Test Plan

8 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Block Diagram

9 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Quality control and reliability PNET Receiver was tested over the summer for weeks at a time to look for dropped packets. Device driver performs checksum- like tests on front of pattern, end of pattern and front-to-end synching. If any of these 3 types of errors are found, counter is incremented, but comparator is reset to current value and operation continues.

10 Dayle Kotturi System Concept Review/Preliminary Design Review dayle@slac.stanford.edu November 16, 2005 Safety hazards 110V AC Connector Require “Electrical Safety 251” completion for plugging/unplugging Hazards - Shock Mitigation - Don’t touch conductors when plugging into outlet Multi-mode fiber optic cable Don’t look directly into cable to determine presence of signal


Download ppt "Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements."