Katoen Natie PROJECT “HANNIBAL REVERSE”.

Similar presentations


Presentation on theme: "Katoen Natie PROJECT “HANNIBAL REVERSE”."— Presentation transcript:

1 Katoen Natie PROJECT “HANNIBAL REVERSE”

2 THE CHILD OF 5 YEARS OLD “You give a child of 5 years old a map and a container on a vessel at the exit of the Suez Channel and you ask to bring the container to Zurich” “What does the child?”

3 FROM GENOA TO ZURICH …. “Sails to Genova and goes over land to Zurich….” ZURICH GENOVA

4 WHAT IS THE REALITY? 98% OF ALL IMPORTED AND EXPORTED CONTAINERS TO AND FROM SWITSERLAND PASS OVER THE NORTHERN PORTS …. Hamburg Rotterdam Antwerp Basel

5 OBJECTIVE FACTS GENOVA FROM SUEZ = 1.506 NAUTICAL MILES
ANTWERP FROM SUEZ = NAUTICAL MILES AT 20 KNOTS/HOUR = 3,87 DAYS MORE AT “ACTUAL SLOW STEAMING” = 6,45 DAYS MORE BASEL IS 611 KM FROM ANTWERP BASEL IS 474 KM FROM GENOVA (And BASEL is the worst destination inside CH…) ANTWERP BASEL GENOVA

6 WHAT CHANGES: ALP TRANSIT !
Decided by referendum Remove alp crossings/ year by truck Investment 31 Billion CHF Opens May 2016 Trains: Tons, 750 Meter, Highest gauge, 1 Loc

7 WHY SHOULD SWITSERLAND IMPORT VIA ITALY ?
DRIVERS ARE ALWAYS THE SAME: COST Alp Transit will improve situation for Italy drastically Italian logistics are competitive TIME 6 days gain SERVICE LEVEL Italy can compete

8 THE SWISS HUB IN ITALY IS RIVALTA !
KATOEN NATIE RIVALTA

9 KATOEN NATIE RIVALTA Total area 2.000.000 mq
Magazzini coperti mq Magazzini refrigerati mc Piazzali mq Aree di sviluppo mq Uffici mq Personale impiegato Camion per giorno

10 WHY IS RIVALTA THE SWISS IMPORT HUB?
FROM CHIASSO TO RIVALTA = FLAT Easy to reach Tons and 750 Meter trains ONE RIVALTA = ALL LIGURIAN PORTS All Ligurian ports/berths already linked to Rivalta SHORT “DIFFICULT TRAINS” BETWEEN RIVALTA AND PORTS It will take another X years before you can reach the Ligurian Ports with 750 meter trains Even most modern APM Savona can not handle trains longer than 450 Meter ! LONG “PERFORMANT” TRAINS BETWEEN RIVALTA AND SWITSERLAND 750 meter and tons AARAU RIVALTA SCRIVIA GENOVA SAVONA LA SPEZIA

11 SERVICES IN ITALY – SWISS INTEREST AS A “COUNTRY”
ASSUMPTION = SWISS GRAVITY OF IMPORT = AARAU ANTWERP – AARAU = 666 KM Only 8,2% use of Swiss intermodal infrastructure “0” use of Alp Transit investment GENOVA – AARAU = 449 KM 56,8 % use of Swiss intermodal infrastructure 100% use of Alp Transit investment

12 AND SWISS RAILWAYS? Only two countries to pass, not 3 to 5…
From Rivalta to Aarau = 56% over “own” tracks Let Italy resolve the “difficult” trains from RIVALTA to PORTS RIVALTA – AARAU = ONLY 381 KM: ONE TRAIN ROUNDTRIP IN 24 H ? Closing DAY A evening, Arrival day B morning? AARAU RIVALTA SCRIVIA

13 ONE RIVALTA = 3 POSSIBLE CONCEPTS
IMPORT – EXPORT MARITIME CONTAINERS TO AND FROM CH CROSS DOCK FROM MARITIME CNTR TO OTHER TRANSPORT HAVE THE SWISS DC IN RIVALTA AND NOT IN SWITSERLAND

14 “YES, WE CAN DO THIS IN RIVALTA”

15 GRAZIE