1 National Railway System Project Status 08/07/08 Prepared by Raisa Spector Presented by TBD Project team #3: Roberto Masciovecchio Raisa Spector Suzanne Smith Omar Mahmoud Mark Sanbower David Saavedra
2
2 National Railway System Project Status Accomplishment: –Revisited Scope Statement and Work Breakdown Sturcture –Finished WBS Dictionary Planned Activities: –Risk Register –Prioritized list of quantified risks –Activity List and Cost Estimate & Cost –Budgeting
3
3 National Railway System Project Status No DescriptionsDue DateAssigned 1Team members are not familiar with the railroad bed (embracement) construction engineering, specification, and terminology needed for creating WBS, WBS dictionary. 08/07/2008Roberto – as having access to Venezuela site. Suzanne – as a Technical Writer 2Same difficulties with reaching Venezuela contracting company telephone and Internet connections in Venezuela do not provide desirable 24 hours service. During whole projectRoberto Issues:
4
4 National Railway System Project Status Risk NoDescriptionDue Date.Assigned 1 Difficulties with gathering information may complicate project development. Team Constraints: NoDescriptionDue DateAssigned 123123 Team members are available only part time – everyone has full time job. Project has to be completed and posted on the Web Site by 8/29/08 Not every member of the team has MS Project and MS PowerPoint. Work should be distributed in a logical way to those who have the software and those who don't. This will enable everyone to contribute in an equal and meaningful way Team Raisa Spector (PM)