Presentation is loading. Please wait.

Presentation is loading. Please wait.

Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.

Similar presentations


Presentation on theme: "Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA."— Presentation transcript:

1 Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA

2 Apr12-cesg-2 SOIS Area Report SOIS Area Report B. Meeting Demographics WirelessApp Supt Svcs ASI CNES CNSA11 CSA1 DLR 1 ESA25 INPE JAXA NASA34 RFSA UKSA 1 Other* TOTAL712 Meeting Duration3.54 Agency Diversity45

3 Apr12-cesg-3 1. Application Support Services WG 2. Wireless WG 3. Subnetwork Services WG (Inactive) SOIS Area Report - Current Working Groups The SOIS area covers onboard communication services with the intention of standardising H/W and S/W interfaces between avionics elements & devices. Wireless activities cover intra-spacecraft communication, AIV and RFID A considerable part of our work is outside of the CCSDS where we perform a harmonising role for avionics related development

4 Apr12-cesg-4 Application Support Services Working Group Goal: Develop SOIS Application support layer services and if appropriate protocols Working Group Status Green Book Issue 2 ready for sending to Secretariat for CESG Poll to publish File & Packet Store Services Magenta Book CESG Poll RIDs dispositions agreed & updated book with Secretariat for publishing Device Data Pooling & Message Transfer Services Magenta Books CESG Poll RIDs dispositioned Device Access Service Red Book ready for sending to Secretariat for conversion to Magenta Book at CESG Poll to publish Device Virtualisation & Device Enumeration Services Red Books ready for sending to Secretariat for 1 st Agency Review Finalised plan for Electronic Data Sheet for Onboard Devices Blue Book & associated XML Schema Finalised plan for Common Dictionary of Terms for Onboard Devices Blue Book & associated XML Schema Status:OKCAUTIONPROBLEM Comment: Finalizing number of books SOIS Area Report

5 Apr12-cesg-5 Application Support Services WG (cont.) Progress All SOIS service specifications are either published or in Agency review process The specifications are compatible with several existing architectures (ESA, NASA, AFRL) After WG analysis the use of electronic data sheets and associated schema to define device interfaces, has been assessed as providing great benefits not just within SOIS but in a much wider context (data driven interfaces, spacecraft data base import, auto testing etc) The intention to define standard functional interfaces within the SOIS has been de- scoped as this is better left to external groups Planning Publish remaining Green and Magenta Books Issue new CWE projects for Electronic Data Sheets & Common dictionary or terms Continue fortnightly telecons SOIS Area Report

6 Apr12-cesg-6 Application Support Services WG Near Term Planning SOIS Area Report ActivityMilestonePlanned end date Electronic Data Sheets for Onboard Devices Blue book Draft 1 - end 2012 Blue book May 2014 Electronic Data Sheets XML SchemaDraft 1 - end 2012 SANA XML May 2014 Common Dictionary of Terms for Onboard Devices Blue book Draft 1 - end 2012Blue book May 2014 Common Dictionary of Terms XML SchemaDraft 1 - end 2012SANA XML May 2014

7 Apr12-cesg-7 status:OKCAUTIONPROBLEM comment: On schedule Wireless WG Goal : Develop wireless recommendations for onboard space applications Working Group Status : RFID-Based Inventory Management Systems Magenta Book Published Low data-rate wireless communications for spacecraft monitoring and control Magenta book ready to submit to CEGS for Agency review The SSIART (joint test-bench) MOU under signature process SOIS Area Report Progress Several use cases identified which require high-speed wireless connectivity (ISS comms and multimedia support, ESA standard telcom platform AIT) - in general data transfer requirements increasing for all existing use cases Planning for symposium on wireless technologies to be held in North America in September 2012 Planning Update Green book to cover High rate use cases and technology evaluation Development of magenta book covering high-rate wireless technology Continue with the definition and usage of the SSIART Continue fortnightly telecons

8 Apr12-cesg-8 Wireless WG (continued) Near Term Planning SOIS Area Report ActivityMilestonePlanned end date Wireless Green Book issue 2 Draft 1 - end 2012 May 2013 Low rate Wireless MagentaIssue 1 - end 2012October 2012 High rate Wireless MagentaImitate work May 2013 May 2014

9 Apr12-cesg-9 Cross Area Meetings: SOIS APP and MOIMS SM&C SOIS presentation on use of Electronic Data Sheets in spacecraft development process - Definition of interface to devices (send/receive), not device functionality Discussion on where data from Electronic Data Sheets are used, e.g. spacecraft database, device simulators, TM/TC databases Exploration as to what structures XTCE & MO Services MAL have that are of benefit for use in Electronic Data Sheets SOIS Area Report

10 Apr12-cesg-10 SOIS WGs Telecon Usage SLS WGInput Wireless WG The Wireless WG has had regular telecons since its inception. This is on average every two week. This will be continued APPS WG The Application support WG hold regular telcons on average 1 per month. It was agreed at this meeting that the telecons would be increased to every two weeks.

11 Apr12-cesg-11 ASWG DDPS and MTS CESG rid updates prior to publication FPSS under publication DAS under publication Green Book Issue 2 under publication DVS, DES ready for agency review Electronic data sheets work initiated Wireless WG RFID Magenta under publication Low rate wireless Magenta book ready for Agency review export and ITAR clearance for test-bed cooperation under signature Green book issue 2 under development Comment: The SOIS area has sufficient funding for this year and intentions are good for the future. Fortunately, we are supported by independent Agency activities which allows the CCSDS work to proceed with minimum effort. SOIS Area Report: Summary


Download ppt "Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA."

Similar presentations


Ads by Google