Presentation is loading. Please wait.

Presentation is loading. Please wait.

Upper Wabash River Basin Commission 319 Grant for Phase 2 161,079 acres along the tributaries of the Headwater of the Wabash River.

Similar presentations


Presentation on theme: "Upper Wabash River Basin Commission 319 Grant for Phase 2 161,079 acres along the tributaries of the Headwater of the Wabash River."— Presentation transcript:

1 Upper Wabash River Basin Commission 319 Grant for Phase 2 161,079 acres along the tributaries of the Headwater of the Wabash River

2 What is Monitored?  Water Temperature  Dissolved Oxygen  Biochemical Oxygen Demand  pH  Orthophosphate  Nitrate/Nitrate  Turbidity  E. Coli  Volume of Water (Depth, Width, & Velocity)  Habitat  Benthic Macroinvertebrates

3

4 Why Monitor Water Quality?

5

6 What cause poor water quality? How to improve the water quality?

7 Where will we test?

8

9 100 E 1000 N (Eight Mile)

10 Rose Road & 100 E (Wabash)

11 200 N (Rock Creek)

12 Improvements? Yes! More to come with your help!

13 Site 2: Wabash River @ State Line

14 Site 10: Loblolly 125 W

15

16

17 Where the eagles fly Bluffton resident Larry Piety recently captured with his camera this mating pair of bald eagles nesting by the Wabash River near Markle. (Photo submitted) Bluffton News-Banner


Download ppt "Upper Wabash River Basin Commission 319 Grant for Phase 2 161,079 acres along the tributaries of the Headwater of the Wabash River."

Similar presentations


Ads by Google