Compliance Monitoring─Ensuring Effective Results Jim Younk Idaho Power Company.

Similar presentations


Presentation on theme: "Compliance Monitoring─Ensuring Effective Results Jim Younk Idaho Power Company."— Presentation transcript:

1 Compliance Monitoring─Ensuring Effective Results Jim Younk Idaho Power Company

2 Hydroelectric Projects

3 Bliss Lower Salmon Falls Shoshone Falls Upper Salmon Falls

4 Water Quality Monitoring History 1988-92 –Middle Snake River assessment units listed as water quality limited under CWA Section 303(d) 12/95 – IPC filed FERC relicensing applications for Bliss, Upper Salmon Falls & Lower Salmon Falls; requested 401 water-quality certification 4/97 - EPA approved TMDLs for CWA Section 303(d) listed waters 5/97 - IPC filed Shoshone Falls relicensing application; requested 401 water- quality certification 5/98 - IPC submitted temperature & dissolved oxygen (DO) monitoring plans to IDEQ 8/02 - IDEQ approved monitoring plans 8/04 - FERC issued project licenses 12/04 – IPC/Agency consultation regarding temperature & DO monitoring plans 3/05 - FERC approved monitoring plans requiring ten-minute temperature and DO data collection/reporting

5

6 Monitoring Analysis 1997-2011 Range of flows (Period of Record high and low) Temperature & DO comparisons to State Standards

7 Analysis Conclusion “Water temperature and DO levels measured at the Middle Snake River hydroelectric projects are likely indicative of Snake river watershed conditions, which include the hydroelectric projects. As such, IPC believes continued water temperature and DO data collection as required by the FERC licenses would provide little additional information as data were collected across the recorded range of hydrologic conditions.”

8 Change Process Consulted w/designated agencies regarding temperature & DO monitoring plan modifications (IDEQ, IDFG, USFWS, NOAA Fisheries) Submitted modified monitoring plans for agency review Submitted plan modification requests to FERC FERC approved modified monitoring plans - required trend data collection

9 Hydroelectric Projects Trend Monitoring Sites

10 Measures and Analytes water temperature dissolved oxygen specific conductance hydrogen ion concentration (pH) turbidity nitrate ammonia total Kjeldahl nitrogen total phosphorus dissolved orthophosphate suspended solids volatile suspended solids total organic carbon dissolved total organic carbon chlorophyll a phaeophytin Escherichia coli bacteria

11 Trend Monitoring Data Use Annual reports & five-year trend analysis Upper Snake Rock TMDL evaluation (IDEQ) White Sturgeon Conservation Plan Endangered & Threatened snails